Loading...
HomeMy WebLinkAbout20131673.tiffLAND USE APPLICATION SUMMARY SHEET PLANNER: C. Gathman HEARING DATE: June 18, 2013 CASE NUMBER: COZ13-0001 APPLICANT: Wake LLLP — A. Bruce Johnson — General Partner ADDRESS: 801 8th Street #220, Greeley, CO 80631 REQUEST: Change of Zone from the R-1 (Low -Density Residential) Zone District to the 1-3 (Industrial) Zone District. LEGAL: Part of the E1/2 of Section 32, T6N, R65W of the 6th PM, Weld County, Colorado LOCATION: South of and adjacent to O Street (County Road 64) and approximately 675 feet west of County Road 41. ACRES: +/- 23.87 acres PARCEL #: 080332000037 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received responses from the following agencies: Without Comment: Weld County Building Inspection, referral received April 22, 2013 Weld County Code Compliance, referral received March 25, 2013 With Comment: Weld County Department of Public Works, referral received April 5, 2013 Weld County Department of Environmental Health, referral received April 1, 2013 City of Greeley, referral received April 25, 2013 The Department of Planning Services' staff has not received responses from: Weld County Sheriff's Office Greeley -Weld County Airport Authority Colorado Department of Transportation Office of Emergency Management Eaton Fire Protection District North Weld County Water District WakeLLLP-COZ13-0001 Pagel ADMINISTRATIVE RECOMMENDATION CHANGE OF ZONE PLANNER: C. Gathman HEARING DATE: June 18, 2013 CASE NUMBER: COZ13-0001 APPLICANT: Wake LLLP — A. Bruce Johnson — General Partner ADDRESS: 801 8th Street #220, Greeley, CO 80631 REQUEST: Change of Zone from the R-1 (Low -Density Residential) Zone District to the 1-3 (Industrial) Zone District. LEGAL: Part of the E1/2 of Section 32 T6N R65W of the 6th PM, Weld County, Colorado LOCATION: South of and adjacent to O Street (County Road 64) and approximately 675 feet west of County Road 41. ACRES: +/- 23.87 acres PARCEL #: 080332000037 THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. - That the proposal is consistent with Chapter 22 of the Weld County. Sec. 22-2-80. Industrial development Goals and Policies. A. I.Goal 1. Promote the location of industrial uses within municipalities, County Urban Growth Boundary areas, Intergovernmental Agreement urban growth areas, growth management areas as defined in municipalities' comprehensive plans, the Regional Urbanization Areas, Urban Development Nodes, along railroad infrastructure or where adequate services are currently available or reasonably obtainable. WakeLLLP-COZ13-0001 Page2 1. I.Policy 1.1. Ensure that adequate industrial levels of services and facilities are currently available or reasonably obtainable to serve the industrial development or district. 2. I.Policy 1.2. Encourage new industrial development within existing industrial areas F. I.Goal 6. Minimize the incompatibilities that occur between industrial uses and surrounding properties. 2. I.Policy 6.2. Support the use of visual and sound barrier landscaping to screen open storage areas from residential uses or public roads. C. I.Goal 3. Consider how transportation infrastructure is affected by the impacts of new or expanding industrial developments. 2. I.Policy 3.2 The land use applicant should demonstrate that the roadway facilities associated with the proposed industrial development are adequate in width, classification and structural capacity to serve the development proposal. The proposed area to be rezoned is immediately adjacent to 1-3 Industrial zoned property to the west and is approximately 600 -feet to the west of an existing industrial use. It is also located approximately IA mile from the municipal boundaries of the City of Greeley and is approximately 'A mile to the east of (and directly accesses via O Street) State Highway 85. O Street is classified as an arterial road and there are existing industrial uses that access onto to O Street to the west of this property. This site is also located within the Urban Growth Boundary for the City of Greeley. Single family residences are located to the north and east of the property. Any proposed use on the property will require a Site Plan Review application that will be administratively reviewed by the County as well as outside referral agencies. The Department of Planning Services is requiring a note on the Change of Zone plat stating that screening and buffering from adjacent uses may be required at the time a Site Plan Review application is submitted. B. Section 23-2-3O.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. The proposed 1-3 Industrial zoning to the west is compatible with this change of zone request. Single family residences are located to the north and east of the property. Any proposed use on the property will require a site plan review application that will be administratively reviewed by the County as well as outside referral agencies. The Department of Planning Services is requiring a note on the change of zone plat stating that screening and buffering from adjacent uses may be required at the time a Site Plan Review application is submitted. C. Section 23-2-3O.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. The application indicates that any future development of the site can be served by the North Weld County Water District provided it meets the requirements of the district. North Weld County has indicated in writing that it is able to and can provide water service to the property provided all of the requirements of the district are satisfied. Individual Septic Systems are proposed for future uses on the site. There is no exact timeframe when this property will be developed. Evidence of adequate water and sewer is required to be provided at the time of Site Plan Review. WakeLLLP-00Z13-0001 Page3 D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. O Street directly accesses State Highway 85. The Colorado Department of Transportation will review proposed developments at the site plan review/final plan stage to determine if additional requirements/improvements will be required in regards to access onto Highway 85. This site is located within the Urban Growth Boundary for the City of Greeley. Future development of the property shall adhere to the right-of-way requirements of the City of Greeley for O Street. The edge of future right-of-way for O Street in accordance with the future right-of-way requirements of the City of Greeley shall be indicated on the Change of Zone plat. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — The proposed change of zone is located within the Greeley -Airport Overlay District. At the time of site plan review/construction any uses will be required to adhere to the requirements of the Airport Overlay District (Article V, Division 1 — Weld County Code). A portion of the property (at the far south end of the property is in the floodplain and would require a Flood Hazard Development Permit if any construction occurs in the floodplain. 2) Section 23-2-30.A.5.b. — A mineral resource statement has been prepared by a professional geologist that states it in their opinion that there are no extractable aggregate resources on this site. 3) Section 23-2-30.A.5.c. — This site is not located within a soil conservation district. The Natural Resource Conservation Soils Survey soils report submitted with the application indicates that the majority of the site (%66.5) consists of soils that are defined as "Not Limited" for commercial buildings. An On -site Geotechnical Soils Report needs to be submitted prior to recording of the Final Plat or Site Plan Review that includes a preliminary design for the roads to be constructed on -site. Additionally, engineered foundation plans along with a soils report or open hole inspection report are required to be submitted with building permit(s). This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Change of Zone from the A (Agricultural) Zone District to 1-3 (Industrial) Zone District is conditional upon the following: 1. Prior to recording the plat: A. The applicant shall provide the Weld County Department of Planning Services with a Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel. (Department of Planning Services) B. The applicant shall either submit a copy of an agreement with the property's mineral owner/operators stipulating that the oil and gas activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. (Department of Planning Services) C. The applicant shall attempt to address the requirements (concerns) of the City of Greeley, as stated in the referral response dated April 25, 2013. Evidence of such shall be submitted WakeLLLP-COZ13-0001 Page4 in writing to the Weld County Department of Planning Services. 2. The plat shall be amended to delineate the following: A. All pages of the plat shall be labeled COZ13-0001. (Department of Planning Services) B. The plat shall adhere to Section 23-2-50.C and D of the Weld County Code. (Department of Planning Services) C. All recorded easements shall be shall be shown and dimensioned on the Change of Zone plat (reception # - book and page). (Department of Planning Services, Department of Public Works) D. The City of Greeley indicated in their referral dated April 25, 2013 that given the proximity to the City and that the fact that the site is located within their urban growth boundary, the amount of right-of-way shall be consistent with City of Greeley standards to facilitate the site's eventual integration into urban scale development. County Road 64 (O Street) is designated by the City of Greeley as a minor arterial road, which requires 100 feet of right-of-way at full build out. There is presently 60 feet of right-of-way. An additional 20 feet from centerline of County Road 64 (O Street) shall be delineated on the plat as future County Road 64 right-of-way. All setbacks shall be measured from the edge of future right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. If the right-of- way cannot be verified, it shall be dedicated. This road is maintained by Weld County. E. Weld County's "Right to Farm" as provided in Appendix 22-E of the Weld County Code shall be placed on any recorded plat. F. The following notes shall be delineated on the Change of Zone plat: The Change of Zone allows for 1-3 (Industrial) uses which shall comply with the I- 3 (Industrial) Zone District requirements as set forth in Article III Division 5 of the Weld County Code. (Department of Planning Services) 2. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Planning Services) 3. Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) 4. Screening and/or buffering from adjacent uses may be required at time of Site Plan Review. (Department of Planning Services) 5. With a Final Plat or Site Plan Review submittal, the applicant will need to provide a Master Drainage Report which adequately addresses the requirements listed in Weld County Code Chapter 8, Article 10, Section 8-11-120. (Department of Public Works) 6. A detailed Traffic Impact Study is required with the Final Plat or Site Plan Review application. Offsite roadway and/or intersection improvements may be required. (Department of Public Works) WakeLLLP-COZ13-0001 Page5 7. Access requirements will be determined when the Traffic Study is reviewed with the Final Plat or Site Plan Review application. (Department of Public Works) 8. Prior to recording a Final Plat or Site Plan Review Plat, the applicant may be required to enter into an Improvements Agreement for onsite and offsite Improvements. Collateral needs to be submitted to and accepted by the Weld County Board of County Commissioners prior to recording of the plat. (Department of Public Works) 9. Prior to recording a Final Plat or Site Plan Review Plat, the applicant needs to submit a grading permit showing: proposed grading, erosion control placement, typical details for all BMPs to be utilized, and a Construction Stormwater permit from the Colorado Department of Public Health and Environment. The permit must be stamped by a registered professional engineer licensed in the State of Colorado. Please note that the grading permit will not be released until the applicant has signed the improvements agreement, posted collateral, and submitted the Site Plan Review plat for recording. (Department of Public Works) 10. An On -site Geotechnical Soils Report needs to be submitted prior to recording of the Final Plat or Site Plan Review that includes a preliminary design for the roads to be constructed on -site. (Department of Public Works) 11. To protect public safety and prevent offsite damages, sufficient interim Best Management Practices (detention, erosion, and sediment control) will need to be designed, approved, and installed prior to commencement of construction. (Department of Public Works) 12. Flood Hazard Development Standard -A portion of the site is located in the 100- year/500-year flood plains. (Department of Public Works) 13. Water service shall be obtained from North Weld County Water District. (Department of Public Works) 14. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) 15. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Health Department, a fugitive dust control plan must be submitted. (Department of Public Health and Environment) 16. In accordance with the Regulations of the Colorado Air Quality Control Commission any development that disturbs more than 5 acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable in order to minimize dust emissions. (Department of Public Health and Environment) 17. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact WakeLLLP-COZ13-0001 Page6 the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. (Department of Public Health and Environment) 18. Activities such as landscaping (i.e. planting of trees and shrubs) and construction (i.e. auxiliary structures, dirt mounds, etc.) activities are expressly prohibited in the designated absorption field site. (Department of Public Health and Environment) 19. A Weld County Septic Permit is required for the proposed business septic system and shall be installed according to the Weld County Individual Sewage Disposal Regulations. The septic system is required to be designed by a Colorado Registered Professional Engineer. Please note, the lot owners shall verify with the nearest Town/City or Sanitation District to determine the location of the nearest sewer line. In accordance with the Weld County Code, if a sewer line exists within 400 feet of the property and the sewer provider is willing to serve the proposed structure, a septic permit cannot be granted by the Weld County Department of Public Health and Environment. (Department of Public Health and Environment) 20. Building permits shall be obtained prior to the construction of any new building. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building Inspection) 21. Each new building will require an engineered foundation based on a site -specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. (Department of Building Inspection) 22. Buildings, structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2012 International Building Code; 2012 International Mechanical Code; 2012 International Plumbing Code: 20121nternational Energy Code; 2006 International Fuel Gas Code; the 2012 International Plumbing Code; 2011 National Electrical Code; 2003 ANSI 117.1 Accessibility Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 23. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Countywide Road Fee Impact Program. (Ordinance 2011-2) 24. Building Permits issued on the proposed lots, will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee program. (Ordinance 2011-2) 25. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 26. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and WakeLLLP-COZ13-0001 Page7 velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 27. Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long- established agricultural practices to accommodate the intrusions of urban users into a rural area. Well -run agricultural activities will generate off -site impacts, including noise from tractors and equipment; slow -moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and County roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation WakeLLLP-COZ13-0001 Page8 ditches, electrical power for pumps and center pivot operations, high speed traffic, sand burs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. G. The applicant shall submit three (3) paper copies or one (1) electronic copy of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 3. Upon completion of 1. and 2. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty (30) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 4. The Change of Zone plat map shall be submitted to the Department of Planning Services' for recording within one -hundred twenty (120) days of approval by the Board of County Commissioners. With the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif (Group 4) ... (Group 6 is not acceptable). (Department of Planning Services) 5. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required one -hundred -twenty (120) days from the date the Board of County Commissioners resolution a $50.00 recording continuance charge shall added for each additional 3 month period. WakeLLLP-COZ13-0001 Page9 Karla Ford From: Sent: To: Subject: Donald Carroll Monday, April 08, 2013 6:58 AM Chris Gathman RE: COZ13-0001 - Change of Zone Map Thank you. Applicant needs to show access points on the plat map. Donald Carroll Engineering Administrator Weld County Public Works 1111 H Street, P.O.Box 758, Greeley Co.80632-0758 tel: (970) 356-4000 x3750 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Chris Gathman Sent: Friday, April 05, 2013 11:40 AM To: Donald Carroll Subject: FW: COZ13-0001 - Change of Zone Map Don, Here is an updated map for COZ13-0001. This looks clearer and more legible when you zoom in. I will go ahead and save under Documents as well. Sincerely, Chris Gathman Planner III Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Joseph Alles [mailto:alles taylor duke@yahoo.com] Sent: Friday, April 05, 2013 11:37 AM To: Chris Gathman Subject: Re: COZ13-0001 - Change of Zone Map Chris, here are the drawings as requested. Please let me know if you need any additional information. Thanks, Scott Alles Taylor & Duke, LLC Surveying & Engineering Services 3610 35th Ave. , Unit #6 Evans , Colorado 80620 Office: 970-330-0308 allcs tavlor dukc(ccvahoo.com Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Chris Gathman <cciathman@co.weld.co.us> To: "'alles_taylor_duke@yahoo.com'" <alles taylor duke@yahoo.com> Sent: Friday, April 5, 2013 9:39 AM Subject: FW: COZ13-0001 - Change of Zone Map Mark, Can you provide/c-mail me a digital map (pdf) of the COZ 13-0001 change of zone map? Thanks! Chris Gathman Planner 111 Weld County Department of Planning Services 1555 N. 17th Avenue, Greeley CO. 80631 Ph: (970)353-6100 ext. 3537 Fax: (970)304-6498 2 Confidentiality Notice: This electronic transmission and any attached documents or other writings arc intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Donald Carroll Sent: Friday, April 05, 2013 8:09 AM To: Chris Gathman Subject: COZ13-0001 Cannot read the plat map , to small. Do you have a larger map? Donald Carroll Engineering Administrator Weld County Public Works 1111 H Street, P.O.Box 758, Greeley Co.80632-0758 tel: (970) 356-4000 x3750 Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. 3 May 20, 2013 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us PHONE: (970) 353-6100, Ext. 3537 FAX: (970) 304-6498 JOHNSON BRUCE WAKE LLLP 801 8TH ST #220 GREELEY, CO 80631 Subject: COZ13-0001 - Change of Zone from the R-1 (Low -Density Residential) Zone District to the 1-3 (Industrial) Zone District. On parcel(s) of land described as: PT E2 SECTION 32, T6N, R65W of the 6th P.M., Weld County, Colorado. Dear Applicant: I have scheduled a meeting with the Weld County Planning Commission on June 18, 2013, at 1:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on July 3, 2013 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at www.weldcountyplanningcases.orq If you have any questions concerning this matter, please call. Respectfully. Digitally signed by Kristine Ranslem Reason: I am the author of this document Date: 2013.05.20 11:53:01 -06'00' Chris Gathman Planner DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.co.weld.co.us E-MAIL: cgathman@co.weld.co.us PHONE: (970) 353-6100, Ext. 3537 FAX: (970) 304-6498 March 25, 2013 JOHNSON BRUCE GENERAL PARTNER 801 8TH ST NO. 220 GREELEY, CO 80631 Subject: COZ13-0001 - Change of Zone from the R-1 (Low -Density Residential) Zone District to the 1-3 (Industrial) Zone District. On parcel(s) of land described as: PT E2 SECTION 32, T6N, R65W of the 6th P.M., Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are complete and in order at this time. I will schedule a meeting with you at the end of the review period to discuss the referral comments received by our office. It is the policy of Weld County to refer an application of this nature to any town or municipality lying within three miles of the property in question or if the property under consideration is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the following Planning Commission(s) for their review and comments: Greeley at Phone Number 970-350-9741 Please call the listed Planning Commissions, for information regarding the date, time and place of the meeting and the review process. It is recommended that you and/or a representative be in attendance at each of the meetings described above in order to answer any questions that might arise with respect to your application. If you have any questions concerning this matter, please call. Respectfully,((/ / Chris Gathman Planner Digitally signed by Kristine Ranslem Reason: I am the author of this document Date: 2013.03.25 09:08:05 -06'00' FIELD CHECK inspection dates: 6/7/2013 APPLICANT: Wake LLLP CASE #: COZ13-0001 REQUEST: Change of Zone from the R-1 (Low -Density Residential) Zone District to the I- 3 (Industrial) Zone District. LEGAL: Part of the E1/2 of Section 32, T6N, R65W of the 6th PM, Weld County, Colorado LOCATION: South of and adjacent to O Street (County Road 64) and approximately 675 feet west of County Road 41. PARCEL ID #: 080332000037 ACRES: +/- 23.87 acres Zoning Land Use N A N Residence, Agland E R-1 E Residence/Residential subdivision across ditch S A S Floodplain/Highway 85/Residential Parcels W 1-3 Industrial W Industrial Uses. COMMENTS: Currently an agricultural (farmed parcel). No residences or buildings are located on the property. Chris Gathman - Planner III Hello