Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20130536.tiff
MEMORANDUM TO: Marcia Walters, Purchasing DATE: March 7, 2013 Rose Everett, Purchasing CC: Dave Bauer, Public Works Director FROM: Joshua Holbrook, Construction Inspection Supervisor SUBJECT: 2013 Recycled Asphalt Supply BOCC Approval Date March 11, 2013 BID NO: #B1300056 On February 15, two bids were received for the 2013 Recycled Asphalt Supply contract. The two bids were received from J-2 Contracting and Colorado Precast Concrete, Inc. J-2 submitted three prices on three different stock piles, with the prices ranging from $7.50 a ton to $8.50 a ton. This material has already be crushed and screened. Colorado Precast Concrete submitted one price on a material that needs to be crushed and screened. Their price was $4.50 a ton; it will cost Weld County $3.24 a ton to crush this material. The total cost to buy and crush this material from Colorado Precast would be $7.74 a ton. This material will be used for 2013 HRP Construction projects. It is our recommendation to award this contract to both J-2 Contracting Company and Colorado Precast Concrete, Inc. J-2 Contracting Company: 6,000 tons from 450 East 16th Street at $7.50 a ton for a total amount of $45,000.00 15,000 tons WCR 13 and WCR 26 at $8.50 a ton for a total amount of $127,500.00 Colorado Precast Concrete. Inc. 15,000 tons from 1954 East HWY 402 at $4.50 a ton for a total amount of $67,500.00 ?t, A3 055E, RG c)oc,E C:\Users\sbrown\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\SY4JG0N7\2013 rec ven_doc ;TDCD CO CO N O NJ - U o y N c., a>;(0w(N Z o O V - U Q o •La U 2 W v N (..)O71)6W _ om W 1 -0°N p D E U U MO mCO z-8%-2-; N 4) D O O 3 O EN mrn o p o ui J O 01 N C wi.02E0X r r W W a w >- J a a 0 N M Jf- OM M Q a N _ 2 W O a 0 f N N co w NF I -4 (Y } - LO W O Q 2 • J DO Q ce _U m Q cc U J W r2 ccW mww Dig W 2 a Op F W2F-M�Q ooz-¢o LL W m O Li- CI) 1- .. Z> OWaOWO W OQZCOZ FCal a wa occoma< TOTAL BID O Q O W i JIU O J oC uo O WI -it (0<a N2 � w CO U Qa Z L� W W O 40 W 0026 .m_ W Ix ace -J W • U z 0 O Wt2 ©©© N Q a CCC w2W OOO < aa 000 J M w L L( Ln U Q v m m m d VENDORS CD CD O O O O CO N M r ---- N OD $4.50/ton @ 1954 E HWY 405 82 CO • NJ O 0 0 m m m z z z 2 H co N 2 >- M H J Q cc N a w 0 0) ct O U J 0 0 0 m o m m m D a o 0 0 0 w 2 H >- m U 0 z w Z H o w d w rx w M w U 2 W � O Z r� U F- F -MD 0 O M OU r n — N D®' W W O ? Z co 1— Ll CO (00z O • .00 Ztao ?>o QeC0 Lop u OQ)0 <rto Qz°° wm00 al -0 � )NrCW d0zws5 w¢1/4 z Ooz UQ- o\) O mw Omww M_> X00 00 W J�N> W ulZ ONQ wN W W,N NCt.0 OUQ°r°.j am0 CD 20 >ODLL
Hello