Loading...
HomeMy WebLinkAbout20133149.tiffRESOLUTION RE: GRANT CHANGE OF ZONE, COZ13-0003, FROM R-1 (LOW -DENSITY RESIDENTIAL) ZONE DISTRICT TO A (AGRICULTURAL) ZONE DISTRICT - INEZ GUTIERREZ WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a public hearing was held on the 13th day of Novmeber, 2013, at 10:00 a.m., in the Chambers of the Board for the purpose of hearing the application of Inez Gutierrez, 401 N. 21st Avenue, Greeley, CO 80631, requesting a Change of Zone from the R-1 (Low - Density Residential) Zone District to the A (Agricultural) Zone District for a parcel of land located on the following described real estate, to -wit: Lot 2 of Subdivision Exemption, SE -1150; being part of the SE1/4 SE1/4 of Section 36, Township 6 North, Range 66 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was present, and WHEREAS, Section 23-2-40 of the Weld County Code provides standards for review of such a Change of Zone, and WHEREAS, the Board of County Commissioners heard all the testimony and statements of those present, studied the request of the applicant and the recommendation of the Weld County Planning Commission and, having been fully informed, finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 23-2-50 of the Weld County Code. 2. The request is in conformance with Section 23-2-40.B of the Weld County Code as follows: A. Section 27-6-120.D.5.a -- The proposal is consistent with any Intergovernmental Agreement in effect influencing the Planned Unit Development, and Chapters 19, 22, 23, 24, and 26 of the Weld County Code. B. Section 27-6-120.D.5.b -- The uses which will be allowed on the subject property will conform to the Performance Standards outlined in Chapter 27, Article II, of the Weld County Code. C. Section 27-6-120.D.5.c -- The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing Zone District and with the future development as projected by Chapter 22 of the Weld County Code or 2013-3149 PL2247 C -C : apt, CL-, P uo, kk1, a43/4 -Q_ 1z1kn 3 CHANGE OF ZONE (COZ13-0003) - INEZ GUTIERREZ PAGE 2 master plans of affected municipalities. Section 27-6-120.D.5.d -- There is evidence that adequate public water and sewer will be made available to the site to serve the uses permitted within the proposed Planned Unit Development in compliance with the Performance Standards in Chapter 27, Article II, of the Weld County Code. E. Section 27-6-120.D.5.e -- Street or highway facilities providing access to the property are adequate in functional classification, width and structural capacity to meet the traffic requirements of the uses in the proposed Zone District. F. Section 27-6-120.D.5.f -- In the event the street or highway facilities are not adequate, the applicant will supply information which demonstrates the willingness and financial capacity to upgrade the street or highway facilities in conformance with the Transportation Section of Chapters 22, 24, and 26, if applicable. This shall be shown by submitting, with the Planned Unit Development Zone District application, a separate proposal for on -site and off -site road improvements. This proposal shall describe, in detail, the type of on -site improvements in compliance with Section 24- 9-10 and off -site road improvements in compliance with Section 24-9-20, to determine if the requirement for street or highway facilities providing access to the property has been satisfied. The method of guarantee shall conform with the County's policy regarding collateral for improvements. G. Section 27-6-120.D.5.g -- There has been compliance with the applicable requirement contained in Chapter 23 regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. H. Section 27-6-120.D.5.h -- Consistency exists between the proposed Zone District uses and the Specific or Conceptual Development Guide. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Inez Gutierrez for a Change of Zone, COZ13-0003, from the R-1 (Low -Density Residential) Zone District to the A (Agricultural) Zone District on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the plat: A. The applicant shall provide the Weld County Department of Planning Services with a Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist for the original parcel. B. The plat shall be amended to delineate the following: 1) All pages of the plat shall be labeled COZ13-0003. 2013-3149 PL2247 CHANGE OF ZONE (COZ13-0003) - INEZ GUTIERREZ PAGE 3 2) The plat shall adhere to Section 23-2-50.C and D of the Weld County Code. 3) All approved accesses shall be delineated on the plat. 4) North West "C" Street is designated on the Weld County Road Classification Plan as a local paved roadway, which requires 60 feet of right-of-way at full buildout. The applicant shall verify the existing 60 feet of right-of-way and the documents creating the right-of-way and this information shall be noted on the plat. All setbacks shall be measured from the edge of future right-of-way. If the existing right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. 5) The applicant shall specifically indicate on the plat the type of right-of-way/easement and indicate whether it is dedicated, private, or deeded. 6) Show and label the floodplain and floodway (if applicable) boundaries on the plat. Label the floodplain boundaries with the Floodplain Study information, Army Corps of Engineers 2003 Poudre River Floodplain Study. B. The following notes shall be delineated on the Change of Zone plat: 1) The Change of Zone allows for A (Agricultural) uses which shall comply with the A (Agricultural) Zone District requirements as set forth in Chapter 23, Article III, Division 1 of the Weld County Code. 2) The operation shall comply with all applicable rules and regulations of the state and federal agencies and the Weld County Code. 3) The Board of County Commissioners approved a waiver of the minimum lot size in an A (Agricultural) Zone District, as specified in Sec. 23-3-50.A.2, on November 13, 2013. 4) Any future structures or uses on the site must obtain the appropriate Zoning and Building Permits. 5) Screening and/or buffering from adjacent uses may be required at time of Use by Special Review. 6) Should noxious weeds exist on the property, or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds, pursuant to Chapter 15, Articles I and II, of the Weld County Code. 2013-3149 PL2247 CHANGE OF ZONE (COZ13-0003) - INEZ GUTIERREZ PAGE 4 7) The historical flow patterns and runoff amounts will be maintained on the site. 8) This site is located in a State Designated, Municipal Separate Storm Sewer System (MS4) Area, which may trigger specific water quality requirements or other drainage improvements if the lot develops further. 9) WARNING: LOTS MAY NOT BE BUILDABLE DUE TO FLOODPLAIN OR FLOODWAY DESIGNATION. The applicant shall be advised that owners of the property may not be able to obtain building permits to construct structures or store materials outside. All construction or improvements occurring in the floodplain, as delineated on Federal Emergency Management Agency (FEMA) FIRM Community Panel Map #080266-1528E, dated June 10, 2005, shall comply with all applicable FEMA regulations and requirements as described in 44 CFR parts 59, 60, and 65. 10) Flood Hazard Development Permits are required for development activities located within the FEMA mapped Poudre River Floodplain. The FEMA definition of development is any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment and materials. 11) FEMA's floodplain boundaries may be updated at any time by FEMA. Prior to the start of any development activities, the owner should contact Weld County to determine if the floodplain boundaries have been modified. 12) Prior to the start of any development activities, the owner should contact the City of Greeley to determine what, if any, additional upgrades are required to the water infrastructure in North West "C" Street. 13) Water service may be obtained from the City of Greeley. 14) This property is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal for future structures shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. 2013-3149 PL2247 CHANGE OF ZONE (COZ13-0003) - INEZ GUTIERREZ PAGE 5 15) Language for the preservation, and/or protection of the absorption field, shall be placed on the plat. The note shall state that activities such as permanent landscaping, structures, dirt mounds or other items are expressly prohibited in the absorption field site. 16) Building Permits shall be obtained prior to the construction of any new building. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two (2) complete sets of plans are required when applying for each permit. 17) Each new building will require an engineered foundation based on a Site -Specific Geotechnical report, or an Open Hole Inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 18) Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently, the following have been adopted by Weld County: 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2006 International Energy Code, 2012 International Fuel Gas Code, 2011 National Electrical Code, 2003 ANSI 117.1 Accessibility Code, and Chapter 29 of the Weld County Code. 19) Building permits issued on the property will be required to adhere to the fee structure of the County -Wide Road Impact Fee Program. 20) Building permits issued on the property will be required to adhere to the fee structure of the County Facility Fee and Drainage Impact Fee Programs. 21) Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval stated herein and all applicable Weld County regulations. 22) The Weld County Right to Farm Statement, as it appears in Section 22-2-20.J.2 of the Weld County Code, shall be placed on the plat and recognized at all times. 2. Upon completion of Condition of Approval #1 above, the applicant shall submit an electronic version (.pdf), or three (3) paper copies, of the plat to the Weld County Department of Planning Services for preliminary approval. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. Upon approval of the plat, the applicant shall submit a Mylar 2013-3149 PL2247 Date of signature: DEC 6 2013 Weld County Clerk to the Board CHANGE OF ZONE (COZ13-0003) - INEZ GUTIERREZ PAGE 6 plat, along with all other documentation required as Conditions of Approval. The Mylar plat and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The applicant shall be responsible for paying the recording fee. 3. On November 13, 2013, the Board of County Commissioners approved a waiver of the minimum lot size as specified in Sec. 23-3-50.2 4. The Department of Planning Services respectfully requests a digital copy of this Use by Special Review, as appropriate. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles or ArcGIS Personal GeoDataBase (MDB). The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). This digital file may be sent to maps@co.weld.co.us. 5. In accordance with Weld County Code Ordinance #2012-3, approved April 30, 2012, should the plat not be recorded within the required one hundred twenty (120) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each additional three (3) month period. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 13th day of November, A.D., 2013. BOARD OF COUNTY COMMISSIONERS WELD OUNTY, COLORADO William F. Garcia, Chair EXCUSED Douglas Rademacher, Pro-Tem unty Attorney 2013-3149 PL2247 Hello