Loading...
HomeMy WebLinkAbout20133202.tiffHEARING CERTIFICATION DOCKET NO. 2013-72 RE: A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT, USR13-0043, FOR A MINERAL RESOURCE DEVELOPMENT FACILITY, INCLUDING AN OIL AND GAS SUPPORT AND SERVICE FACILITY (OILFIELD SERVICE COMPANY LAYDOWN YARD, OFFICE, AND REPAIR AND MAINTENANCE SHOP FOR OIL AND GAS EQUIPMENT) IN THE A (AGRICULTURAL) ZONE DISTRICT - E.L. DODSON A public hearing was conducted on November 20, 2013, at 10:00 a.m., with the following present: Commissioner William F. Garcia, Chair Commissioner Douglas Rademacher, Pro-Tem Commissioner Sean P. Conway Commissioner Mike Freeman Commissioner Barbara Kirkmeyer Also present: Acting Clerk to the Board, Susan Brown Assistant County Attorney, Brad Yatabe Planning Department representative, Chris Gathman Public Works representative, Jennifer Petrik Health Department representative, Mary Evett The following business was transacted: I hereby certify that pursuant to a notice dated October 14, 2013, and duly published October 17, 2013, in the Greeley Tribune, a public hearing was conducted to consider the request of E.L. Dodson, for a Site Specific Development Plan and Use by Special Review Permit, USR13-0043, for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility (oilfield service company laydown yard, office, and repair and maintenance shop for oil and gas equipment) in the A (Agricultural) Zone District. Brad Yatabe, Assistant County Attorney, made this a matter of record. Chris Gathman, Department of Planning Services, presented a brief summary of the proposal and entered the favorable recommendation of the Planning Commission into the record as written. He said no concerns have been received from surrounding property owners; staff has asked for a screening plan due to the proximity to U.S. Highway 85, a lighting plan, and, because this is currently a zoning violation, building codes and requirements need to be addressed before recording the plat. A new Condition of Approval #1.J should read, "Proper building permits will be required for any existing buildings currently being used by the business." Mr. Gathman presented a slide show of the site and surrounding area. Commissioner Kirkmeyer commented that she drives U.S. Highway 85 all the time and has never noticed this property and a six-foot high fence could be uglier than looking at neatly stored equipment. Commissioner Rademacher concurred. Mr. Gathman apologized that he did not have a picture of the property taken from U.S. Highway 85. The company is a 24/7 oil and gas support business, with plans to grow up to 50 employees, of which 10 will be at the site on a regular 2013-3202 PL2246 HEARING CERTIFICATION - E.L. DODSON (USR13-0043) PAGE 2 basis. El Jennifer Petrik, Department of Public Works, provided a brief overview of the transportation plans and requirements. She said the application lists five (5) vehicles per day at the site and an average of 30 round -trips per day, their access permit is under review and there are two existing accesses. The applicant shall reference on the plat the planned improvements at U.S. Highway 85. Mary Evett, Department of Public Health and Environment, reviewed the water, sewer and waste disposal provisions. One or both domestic wells will need to be permitted. The septic system for the residence needs to be examined by an engineer, and a new septic permit will be required for Lot B. There are also Conditions of Approval addressing shop drains. E.L. Dodson, applicant, said this is a family owned business and one of his sons lives in the home on the property. He said they employ 24 people in Weld County and want to be good neighbors; some days there will be a great deal of equipment in the yard, other days there will be none, and it is always kept neat. In response to Commissioner Kirkmeyer's comment about unattractive fencing, he said he is committed to making the property look nice, there is a horse barn and trailer and they tore down the original fencing because it was an eyesore and are exploring options such as a nice dog-eared wood fence. In response to Commissioner Rademacher, he said there is a six-foot chain link fence there now and Commissioner Rademacher said he doesn't believe screening needs to be a requirement but should be up to their discretion. El No public testimony was offered concerning this matter. In response to Chair Garcia, Mr. Dodson said he has reviewed, and agrees to abide by, the Conditions of Approval and Development Standards, as amended. a Commissioner Kirkmeyer suggested deletion of the last sentence of Condition of Approval #1.1 regarding a six-foot opaque fence, done by assent of the Board. She stated that she drives by here every day and never noticed it, and the last thing they want is to make U.S. Highway 85 unattractive. She said she trusts the applicant's discretion to make the property look nice, such as a few trees and rocks or appropriate fencing. The Board also consented to a new Condition of Approval #1.J, "Proper building permits will be required for any existing buildings currently being used by the business." Mr. Gathman explained the need for building permits for the existing buildings and Mr. Dodson said he is working on getting the electrical system in the shop up to Code. There was some additional discussion about these buildings. Commissioner Conway moved to approve the request of E.L. Dodson for a Site Specific Development Plan and Use by Special Review Permit, USR13-0043, for a Mineral Resource Development Facility, including an Oil and Gas Support and Service Facility (oilfield service company laydown yard, office, and repair and maintenance shop for oil and gas equipment) in the A (Agricultural) Zone District, based on the recommendations of Planning staff and the Planning Commission, with the Conditions of Approval and Development Standards as amended and entered into the record. The motion was seconded by Commissioner Rademacher, and it carried unanimously. There being no further discussion, the hearing was 2013-3202 PL2246 HEARING CERTIFICATION - E.L. DODSON (USR13-0043) PAGE 3 This Certification was approved on the 25th day of November, 2013. BOARD OF COUNTY COMMISSIONERS WELD COUNTY. COLORADO Weld County Clerk to the Board C - BY: Deputy Cle to the B Willi afn F. Garcia, Chair our (ea QaaflQ r Douglag Rademach r, Pro-Tem Sean P. Conway Mike Freeman arbara Kirkmeyer 2013-3202 PL2246 Hello