Loading...
HomeMy WebLinkAbout20131321.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 3 BETWEEN COUNTY ROAD 48 AND STATE HIGHWAY 60 FOR FIVE (5) WORKING DAYS, FOR BRIDGE DECK REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to Section 42-4-106(6)(a), C.R.S.: "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close to through traffic and to regulate, warn and guide vehicular traffic on said County roads by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 3, between County Road 48 and State Highway 60, be temporarily closed, with said closure being effective June 10, 2013, for approximately five (5) working days to replace a bridge deck, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. 2013-1321 EG0024 ROAD CLOSURE - CR 3 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 3rd day of June, A.D., 2013. BOARD OF COUNTY COMMISSIONERS WELD CpJNTY, COLORADO ATTEST: Weld County Clerk to the Board BY: Deput APP C erk to the Bo ounty Attorney Date of signature: JUN 1 2 2013 William F. Garcia, Chair or) rtaiLxr- ougla ' ademach -r, Pro-Tem an P. Conway 1 �u ike Freeman EXCUSED Barbara Kirkmeyer 2013-1321 EG0024 MEMORANDUM TO: Clerk to the Board DATE: May 28, 2013 FROM: Janet Carter, Public Works Department SUBJECT: BOCC Agenda Item — Road Closures WCR 3 between WCR 48 and SH 60 is scheduled to be closed from 6/10/2013 to 6/14/2013 to replace a bridge deck. Attached are the traffic detour diagrams. M:\Francie\AGENDA memos\Agenda Road Closures-I.docx 2013-1321 ..................1 CI co Z C } M C = Y ro mrmr a- 7 V re TS 3 M G, co 0 O CN.0 Boa 22 F w Nov m a in G • u C, 3 D 0 U DC N M W O E Co d N C .0 m m mm c m O_ y y - ._Cz o • ° z ≥ mEm m m n ✓ m m E E E m M M U r U • 2.0 a D c coo CO N r e U K o w C • o c N N C m Is N G' a a n I. e r a K K ��x 0 D 0 M U 0-Oc 000 Co U U N�n0 D N=or <n3 Dm=C= as p m o�vactro z mM OE N N N In Placement of signs not to scale a` LEE STEPHEN . . Hello