Loading...
HomeMy WebLinkAbout20110618.tiffMEMORANDUM TO: Clerk to the Board DATE: March 12, 2013 FROM: Josh Holbrook, Inspection Supervisor SUBJECT: Consent Agenda Bid No. B1100043 Doc No. 2011-0618 Attached is one original Contract Extension/Renewal with GCC of America for the 2013 Bulk Cement Contract in the amount of $654,000. MAPancieAAgendalosh. docx arnatitt C to 3-18-2ol3 C'a o?o//-06/1 BOARD OF COUNTY COMMISSIONERS REVIEW/ WORK SESSION REQUEST RE: Bulk Cement Contract DEPARTMENT: WELD COUNTY PUBLIC WORKS DATE: 3.4.2013 PERSON REQUESTING: Joshua Holbrook, Weld County Public Works Brief description of the problem/issue: The agreement for the Bulk Cement Contract can be extended from January 1, 2013, to December 31, 2013, as permitted by the contract. This extension would be in the final year of a possible three year term limit. The contract also allows for yearly rate adjustments based upon the current Engineering New -Record (ENR) which was a 0.62% increase from January 2012 to January 2013. GCC of America did request an increase of 0.62%. The projected budgeted amount for 2013 is $654,000.00. GCC of America was awarded this contract in 2011 as the low bid contractor and the department has been satisfied with their product. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The Board may either approve or deny the contract renewal/extension. Recommendation to the Board: I recommend approval for GCC of America under the Bulk Cement Contract. William F. Garcia, Chair Douglas Rademacher, Pro -Tern Sean P. Conway Mike Freeman Barbara Kirkmeyer Attachments Approve Schedule Recommendation Work Session Lk -C: � x me M'.\ -Active Projccts\Ccmcnt Stabilization \20 13 cement Contract \WotkSessi on(Work Session Request) docx Comments CONTRACT EXTENSION / RENEWAL Bulk Cement for 2013 Date: 2.20.2013 Owner: Weld County Public Works Department PO Box 758. Greeley. Colorado 80632 Consultant GCC of America. 130 Rampart Way. Suite 200. Denver. CO 80230 The following change is hereby made to the Contract Documents: Contract Time Extension: The Agreement for the Bulk Cement Contract is extended from January 1, 2013 to December 31, 2013 as permitted by the contract. This extension will be the third (3) year of a possible three (3) year contract. Change to 2012 Price Schedule: The 2012 Price Schedule shall be replaced by the attached 2013 Price Schedule. CHANGE TO CONTRACT PRICE: 2013 Contract price base upon Price Schedule (product and delivery): $654.000.00 CHANGE TO CONTRACT TIME: The Contract time will be increased by 365 calendar days. RECOMMENDED: Owner Representative: (/� / L_ Date: MAR 1 8 2013 Engineer: Date: 1 J Director: V t C� _ 2 t�/��— Date: 3 APPROVALS: Vendor: By: Title: C', t t'' Date: a L.), /, 3 1IPage Bulk Cement Contract -,WD//- o�id' 2013 PRICE SCHEDULE DESCRIPTION UNITS Portland Cement (Type I -II) (Low Alkali)(Est. 4898 tons) Delivery (<70 mi. Roundtrip) Est. 1918 tons Delivery (>70 mi. Roundtrip) Est. 2980 tons Standby Time 2012 UNIT PRICE 2013 UNIT PRICE Ton $ 96.77 $ 97.37 Mile $ 2.75 $ 2.81 Mile $ 2.50 $ 2.50 Hour $ 90/hr after 1.5 hrs $ 90/hr after 1.5 hrs Appendix A includes a map of the anticipated project locations as well as an estimate tonnage amount for each site. This information is included as information only and is subject to change without modifications to the approved amounts. Plant Location (List the address from where the cement will be delivered from) Location 1 Plant Name: Denver Terminal Physical Address: 220 E. 54'" Ave City, State: Denver, CO 81004 Location 2 Plant Name: Irondale Terminal Physical Address: 9290 Heinze Way City, State: Henderson, CO 80642 Please note below if Plant locations have limitations on availability or special requirements 7:00 a.m. to 5:00 p.m. Monday — Friday. Saturday open with a minimum of six loads For every $0.05/gallon increase in diesel fuel price above $4.20/qallon, add $0.02/mile 2'Page E;..Ih Cement Contract MEMORANDUM TO: Clerk to the Board DATE: February 8, 2012 FROM: Wayne Howard, Public Works Department SUBJECT: BOCC Agenda Contract Extension for Bulk Cement 2012 (Bid No. B1100043) with GCC of America in the amount of $534,000. Attached is the Price Schedule and the Weld County 2012 Cement location map. ciieAgendaMlkeBedell docx dOtiVak..vk-(�� 4,14144-- o22- ic: ?6t), ?U al$uIra 6231/- o6I7 7 EGcn&Li CONTRACT EXTENTION Bulk Cement for 2012 Change Order No. 1 Date: Project: Bulk Cement for 2011 - Bid No. B1100043 Owner: Weld County, Colorado Vendor: GCC of America 130 Ramport Way, suite 200 Denver, CO 80230 The following change is hereby made to the Contract Documents: Contract Time Extension: The original Agreement for Bulk Cement allows for the extension up to two additional (2) years. This extension will be the second (2) year of a possible three (3) year contract. Contract Time will end December 31, 2012 unless extended. Price Adjustment: Section 3, Subsection 3.4, of the original Agreement allows for cost increases per the Denver/Boulder CP Index. The supplier has requested a $3.27/ton increase which is within the projected allowable increase of the Denver/Boulder CPI for January 2010 to January 2011. Adjustment Factor: Future adjustments will be made utilizing the Engineering News Records Materials Cost Index for Denver for Portland Cement (Type 1). January 2012 index for Portland Cement is $103.65. This base line number will be compared to January 2013 number for the percent increase or decrease for possible future adjustments. CHANGE TO CONTRACT PRICE: See attached Price Schedule 2012 Contract Price based upon Price Schedule (product and delivery): RECOMMENDED: Owner Representative: Engineer APPROVALS: Vendor: Title: �an P. Conway (Chair) 0 C of America $534,000.00 Date:FEB 1 3 2012 Date: d//1,2 Date: _2- t' - (Z 2 -/3-pia. 1lPage Bulk Cement Contract DESCRIPTION Portland Cement (Type I -II) (Low Alkali)(Est. 4898 tons) Delivery (<70 mi. Roundtrip) Est. 1918 tons Delivery (>70 mi. Roundtrip) Est. 2980 tons Standby Time PRICE SCHEDULE UNITS 2011 UNIT PRICE 2012 UNIT PRICE Ton $ 93.50 $ 96.77 Mile $ 2.50 $ 2.75 Mile $ 2.50 $ 2.50 Hour $ 90/hr after 1.5 hrs $ 90/hr after 1.5 hrs Appendix A includes a map of the anticipated project locations as well as an estimate tonnage amount for each site. This information is included as information only and is subject to change without modifications to the approved amounts. Plant Location (List the address from where the cement will be delivered from) Location 1 Plant Name: Denver Terminal Physical Address: 220 E. 54th Ave City, State: Denver, CO 81004 Location 2 Plant Name: Irondale Terminal Physical Address: 9290 Heinze Wav City, State: Henderson, CO 80642 Please note below if Plant locations have limitations on availability or special requirements 7:00 a.m. to 5:00 p.m. Monday — Friday. Saturday open with a minimum of six loads For every $0.10/qallon increase in diesel fuel price above $4.00/gallon, add $0.02/mile 2WPage Bulk Cement Contract ••. m a .. .5 ••: a co)ti . . 'a . a •. • e s% • A•.vm A 1 • • • ■ .a.. • • WELD COUNTY 2012 CEMENT • • ■ ■ • . I • samara V i.• •1. • •• • • I •... • • • . .r... a. •. ■ • ■ a ■ • . • � • jpa.sai.aa�.aa45 ▪ oe t • • ■ • • ▪ • .' '• • • • l▪ am •...I _▪ seas • • ••••••••1• a. as ■ .•` ■ s a a m a .. as •• •• ••: '•s • • ■ ••.•j• ■ • • I '• \ r i • o .d.. • .• • • f•• ....ask • • w...` '•% • • • • I. .• • • • a • a.. a• •...•• • ■ S • • ■ a • • •�. ■ ■ to N N ~ O O M .., • C O X M2 E N cc a UQ • • • • • a■ • • •r • ••• ■ ■ • •I • • • .• sa s s e ast • • .. . • • •...•%m.e • • • • • • • ar • • -• • • • ■.aa. • •• O N C > O 0 0(0 CO ea C O M 2 N cf 0.0 ■ • Pam • at .. •a esa a. • ■ • ■ • wine a • ▪ ••••••• P sa•a' ■ • • ■ • • • ■ ■ Y ■ so • ell •••; • •4 • • a..• •• • • ■ .. •.I .�.MCs ▪ • ▪ • ' • • •sear.}.r• • • •• • •• si •▪ • •■ 5 I. sr ▪ • • . • ow z ■ • $ .. a a I a • • • • • ••• • • • - z z • :f��CpCOCD CNO��IL) LO �t��1��OVMMMMNNNNNCOC��NOQ000dN • j / �••r•. - . • ■ L ■ - •▪ a•..• • •a.•.••q �' ■ • , • . 1 a a • ..4 ■ • • nits nos" . • ■ • +.`•.n% Ia••.•a • %•I' • • ti. • • • ■ aa ••••• N M ■ I ▪ • • • • .a• ■ • 1 a% •t• • • • . sass ' '. • . sass; .. w • • !MeV •e S. reef ir •.:44 Et • • a+ • • U. • • ■ • • ins . • - s ▪ el,. as ■ • • • • • • • • • • • • .. • • • J ••• �• •.1.•••..•aa• . •• ■ • e% seat i•• ... —. ; MetgN rrrre r 0 Q 2 Z O I Q U O J b TONS OF CEMENT: 65 W 'V 00 M J O Q 00tC0(AH • N O N- CD r N. OH to co N '—"Cl)".) N '4' O O O CO 4-1 CO O oEEE O O O O O) I` O O M LOCCCLCCCL 0UUU CD N co t V O O O N o. E O M "1 LO ui U0 a• U) to O J Oin H CO0 • Ia a• ■ •••aa ■ • -son •• e. • • • ■ ■ • m .. •▪ In JJ •• ■ • • ..a • a .. • • • • I.• :• s • sr7 • • (O CO N O °' C ✓ 0 ='-- 0 ILO X E cta0 UQ o mat a-. a-. •a • • . • • • • • a . ..■ • r • T N C O H N N X E 0. 0 O. Qo N r - N (D CO O N • ■ 3 • • r • • • Cba ■ • ■ • 1• ■ a%ar mania• .J % • • • . S. a a• ■ • .'▪ a Ia•...i ....ca.. a • • a • . . � . • . ■ • U• 1. . U • •• .•. •s • . • a a a a COLORADO i*sveD MEMORANDUM TO: Clerk to the Board DATE: April 12, 2011 FROM: Mel Everhart, Motor Grader Supervisor SUBJECT: Consent Agenda Item Agreement and Notice of Award/Acceptance of Notice with GCC of America for the Bulk Portland Cement for 2011, Bid No. 81100043. Attached is one signed Agreement. NI Q'rancle\Agenda Item -I dot cc: Poi Pu y -3D-// 1-1 AGREEMENT Bulk Portland Cement for 2011 THIS AGREEMENT, made this �. day of ` 1 2011, by and between Weld County, Colorado, hereinafter called "Owner' and GCC of America doing business as (an individual, ) or (a partnership,) or (a corporation) hereinafter called "Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following: Bulk Portland Cement for 2011 described in the Invitation for Bids, Bid No. B1100043 2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the sum of $ ],Ow — SpJo or , or as shown in the Bid Schedule. 4. The term "Contract Documents" means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders (C) Bid Proposal (D) Bid Schedule (E) Receipt of Addenda (F) W-9 Tax Form (G) Notice of Award (H) Agreement (I) Change Order (J) Contract, Specifications, and Drawings issued by the Weld County Public Works Department. (K) Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" (L) Addenda: No. dated 2011. 5. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents, or otherwise agreed upon in writing. 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 7. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor, in writing, that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy -granting provision contained in the Contract. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: THE BOARD OF WELD COUNTY COMMISSIONERS GCC OF AMERICA y--- NAME ✓.jOC F1nr1t-()C\Y1 (Please T`'.ft\ e) TITLE g.eylo.la‘ S« es ADDRESS 1 2) 3 9-`"^ [' `r U")ray Date J APR 1 8 2011 f BY �c It'll,C ,/) c. C 1/1- i NAME Barbara /Kirkmeyer TITLE Chair (SEAL) ATTEST: Weld County Clerk to,t{1e Board BY /MA Deputy Cl to the Board BY (SEAL) Ct: bc`13� LISA CHRISTINE JAMES NOTARY PUBLIC STATE OF COLORADO ATTEST: Expires: November 16, 2014 BY\ \<-F�C\ -] k5-\. v, s'-kr-.,"`C_ s (Please Type) TITLE BID SCHEDULE DESCRIPTION UNITS Portland Cement (Type I -II) (Low Alkali) Ton Delivery (Roundtrip) (CR 89 Project) Est. 1085 tons (See Appendix A) Mile Delivery (Roundtrip) (CR 31 Project) Est 510 tons (See Appendix A) Mile Delivery (Roundtrip) (CR 39 Project) Est. 530 tons (See Appendix A) Mile Delivery (Roundtrip) (CR 49/54 Project) Est. 220 tons (See Appendix A) Mile Standby Time UNIT PRICE $93.50* $2.50* $2.50* $2.50* $2.50* Hour $90.00 per hour — after 1.5 hours Appendix A includes a map of the anticipated project locations as well as an estimate tonnage amount for each site. This information is included as information only and is subject to change without modifications to the approved bid amounts. Plant Location (List the address from where the cement will be delivered from) Location 1 Plant Name: Denver Terminal Physical Address: 220 E. 54th Avenue City, State: Denver, CO 81004 Location 2 Plant Name: Irondale Terminal Physical Address: 9290 Heinze Way City, State: Henderson, CO 80642 Please note below if Plant locations have limitations on availability or special requirements: 7:00 a.m. to 5:00 p.m. Monday — Friday. Saturday open with a minimum of six loads. *For every $.10¢/gallon increase in diesel fuel price above, $4.00/gallon, add $0.02¢/per mile to unit price for delivery. NOTICE OF AWARD Bulk Portland Cement for 2011 To: GCC of America 130 Rampart Way, Suite 205 Denver, CO 80230 Project Description: The project in general consists of supplying and delivery bulk cement to certain projects sites during the 2011 construction year. The Owner has considered the Bid submitted by you for the above described Work in response to its Invitation for Bids and instructions to Bidders. You are hereby notified that your Bid has been accepted in the amount of $ 2,00o - XO00 Alm.) or as shown in the Bid Schedule. You are required by the Instructions to Bidders to execute the Agreement within ten (10) calendar days from the date of this Notice to you. If you fail to execute said Agreement within ten (10) days from the date of this Notice, said Owner will be entitled to consider all your rights arising out of the Owner's acceptance of your bid as abandoned. The Owner will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this Notice of Award to the Owner. Dated this \. day of CA ft.‘ 2011. Weld County, Colorado, Owner BYM If %,TotoYGrader-Supervisor ACCEPTANCE OF NOTICE Receipt of the above Notice of Award is hereby acknowledged by Um � CC of A v^f Gefttfl aasstorlier Dated this 8 t"b1 day of RD Yl 2011 By: (it .9-grkj Title: P CA Qe1- �1nc 9XL.La\ Cory OC kL ��� s WELL eo NTY MEMORANDUM TO: Board of Commissioners DATE: March 3, 2011 FROM: Pat Persichino, Public Works Director SUBJECT: 2011 Bulk Cement Bid, B1100043 The Public Works Department recommends GCC of American be awarded the bid for bulk cement. After a comparison of the total per ton delivered cost, GCC of America is the lowest bidder. A total of $250,000 is budgeted for this purchase. If you have any questions, please contact me at extension 3768. M: mona/wordfi les/bids/m bulkcementl 1. docx 3AW4ol/ a oa—oceR EGoozgy GCC bid analysis bid price RT miles Del charge perTdelivered est Tons total $$ Cement per ton $ 93.50 RT del to rd 89 $ 2,50 210 $ 525.00 $ 114.50 1085 $ 124,232.50 RT del to rd 31 $ 2.50 60 $ 150.00 $ 99.50 510 $ 50,745.00 RT del to rd 39 $ 2.50 156 $ 390.00 $ 109.10 530 $ 57,823.00 RT del to rd 49/54 $ 2.50 100 $ 250.00 $ 103.50 220 $ 22,770.00 TOTAL $ 255,570.50 GCC bid analysis with fuel at $5.00/gal bid price RT miles Del charge perT delivered est Tons total $$ Cement per ton $ 93.50 RT del to rd 89 $ 2.70 210 $ 567.00 $ 116.18 1085 $ 126,055.30 RT del to rd 31 $ 2.70 60 $ 162.00 $ 99.98 510 $ 50,989.80 RT del to rd 39 $ 2.70 156 $ 421.20 $ 110.35 530 $ 58,484.44 RT del to rd 49/54 $ 2.70 100 $ 270.00 $ 104.30 220 TOTAL $ 258,475.54 Cement per ton RT del to rd 89 RT del to rd 31 RT del to rd 39 RT del to rd 49/54 Cement per ton RT del to rd 89 RT del to rd 31 RT del to rd 39 RT del to rd 49/54 bid price $ 108.00 $ 2.30 $ 2.30 $ 2.30 $ 2.30 Cement per ton RT del to rd 89 RT del to rd 31 RT del to rd 39 RT del to rd 49/54 Son -Haul bid analysis RT miles 212 60 158 100 Del charge $ 487.60 $ 138.00 $ 363.40 $ 230.00 per T delivered $ 127.50 $ 113.52 $ 122.54 $ 117.20 Son -Haul bid analysis with fuel at $5.00/gal bid price $ 108.00 $ 2.50 $ 2.50 $ 2.50 $ 2.50 RT miles Del charge per T delivered est Tons 1085 510 530 220 total $$ $ 138,341.84 $ 57,895.20 $ 64,944.08 $ 25,784.00 TOTAL $ 286,965.12 est Tons total 5$ bid price $ 97.00 $ 1.75 $ 1.75 $ 1.75 $ 1.75 212 60 158 100 $ 530.00 $ 150.00 $ 395.00 $ 250.00 $ 129.20 $ 114.00 $ 123.80 $ 118.00 Holcim bid analysis RT miles 432 294 378 326 Del charge $ 756.00 $ 514.50 $ 661.50 $ 570.50 per T delivered $ 127.24 $ 117.58 $ 123.46 $ 119.82 1085 510 530 220 $ 140,182.00 $ 58,140.00 $ 65,614.00 $ 25,960.00 TOTAL $ 289,896.00 est Tons 1085 510 530 220 total 5$ $ 138,055.40 $ 59,965.80 $ 65,433.80 $ 26,360.40 TOTAL $ 289,815.40 Ash Grove bid ana ysis Cement per ton RT del to rd 89 RT del to rd 31 RT del to rd 39 RT del to rd 49/54 Cement per ton RT del to rd 89 RTdel tord31 RT del to rd 39 RT del to rd 49/54 bid price $ 120.00 $ 2.28 $ 6.25 $ 3.50 $ 3.75 bid price $ 120.00 $ 2.37 $ 4.73 $ 3.74 $ 4.16 RT miles 198 46 142 84 Del charge $ 451.44 $ 287.50 $ 497.00 $ 315.00 per T delivered $ 138.06 Cemex bid analysis RT miles 206 72 126 94 Del charge $ 488.22 $ 340.56 $ 471.24 $ 391.04 131.50 139.88 132.60 per T delivered 139.53 133.62 138.85 135.64 est Tons 1085 510 530 220 total $$ $ 149,792.50 $ 67,065.00 $ 74,136.40 $ 29,172.00 TOTAL $ 320,165.90 est Tons 1085 510 530 220 total $$ $ 151,388.75 $ 68,147.42 $ 73,590.29 $ 29,841.15 TOTAL $ 322,967.61 (970) 336-7226 (6 LL CO N Cu V O N CD �INiN Z N O v � I c in a) c) co- 330 ai1- 8E W 2 o �o o - Eti) � Q O M M• �0 3 O NU E mm U, >, E W O N 22 0 �)WwWa VENDORS N a V co O O Oa) CD _O CA CO N �% OO r 0 C W O N p 0 U >a 0 U a) c tt C 0 = • 1-1 a) > N W a) a) O L > a cv LO Q N E c a) a) a a a) N a) a) a) a) r 4) o E'E'E'E 3 EE E E E @uio 0 O in in (n (n '= 0 0 •0 0 0 O N O o (-I--I� rt.L O it) (f)l[) ((i to _c NO) I,r r r r(nF h')NNNNON - Vi *' TO -Di' 64 to 4469 to 64 (1* 6A to to Cb C C O N CO a) c E tr o U) x • c E ® F - y C c ~ O O NTo • N N O C • Q) C N N a) (0 E 2 0 0 0 'C N O O N C C O N E co O_ O N d 0 W _O O N 0 ' C_ 64 oLn IM N N LO (!') N E O \) C N L > o �o N N N 1. N 0 N (LL)) r N . (0 • V _ C co• mm a N 0 O C 6nr)M V a) 0 0 goo t_W cCIn E:t 0 i°cCcceccc Er.r o'a UUUU:o o c L0000 , So >— d Z'Wa'Z'yJ a7 Z'Z'a'a-E,JJ "00`� a) a) a) a) -O w, N a) a) N CD -O N>>>> C C E O>>>> C •C C 3 .` .o .) .� '� y0 a3 �) o N N U) U) @ N co m a) V) -'O T co C 2 a) Li N a7 I N >. 0 N C_ C C O O 2 Ty c:› U a o ✓ O W n o 7 O d OO M ER Or O�O lf) at Z�� v) ��°� ' a) >o �c0 ma) D o0 IC?) U o 0 Do Q OUC r4 c 6n m J U •-O (3 CO > 0 N 0 0, U' Om J co co 0 0 N N N O OD O 0 0) C a) 0 a) C c m N 0) 0) 0) EE E E O O O O O N M M M M L O O N N N N O) U3 a ER fA s fA 0 N N C C C C E O O 0CO Ni uo cc o o N o O N N U) N M 0) 0) 0) LO m r Cr) O) e-- 000MM V 0 O g Ct CC CC E'� O 0o0. 2 0.16. CD O) I)) 0 m > > > > c mma)a�0m a0000coa VENDORS For every $0.10/gal increase in diesel fuel price above $4.00/gal add $0.02/mile to unit price for delivery. 0) c a) a cc W co a O O co O 0 0) C O >, ill J 0) N N 0) > 0) 0) 0) 0) U oEEEE 3 O „EEEE J O I�M V CO L.'C 0,-.0 m0 co M I f L O) C 1 N N O I- L N O CV CV 4 VD 4 in CV CV chi cricri 33 co co afA to EA EA �{w- aEAe a eta co 3 'aU v ~ c- m co N > O C O C O 0) cn C • N v) Vi coo 2O Ur` 0) O C C O C O C C O -O G O O N T O O O (NI N N co O_ co J 00 O O .4( I Or O O CO Or O O N 0) N N N N M N d) V' 0) 0) 0) L 0) N 0) LO COO MM V O g C00MM� O) CO FCC _ Ho E'g �0000 E'@ d 2'a•2'a%n3 a Z zzzE3 a)a)ma)0m — a5a),T)(7)2m n`-0000cna a0000cna O N co . $2O w co 0o U C c c U m • �� X L 1D C W M 2OL 0•= O 0 OM O_ Si N Z co tcd w - W2 6 2 Y U �Y j -Oa O CC U C U r I0> Q UO N W N co r 0) > Hello