HomeMy WebLinkAbout20131536.tiffUnited States Forest USDA Department of Service Agriculture Pawnee National Grassland 660 "0" Street Greeley, CO 80631 Woe: (970) TDD: (970) 346-5015 Web:: www.fs.nsda.gov/arp Fast (970.)346.5014. File Code: 1950/2720 Date: June 6, 2013 Dear Interested Party, The US Forest Service is requesting public comment regarding a proposed action on the Pawnee National Grassland (PNG). Background The Forest Service proposes to authorize Noble Energy, Inc. (Noble) to construct approximately 2,100 feet (0.40 mile) of buried, 6 -inch steel natural gas pipeline on the PNG to transport. natural • as to a. pipeline on adjacent private lands. The legal description of the project area is T. S N., R. 60 W., 6th P.M., sec. 4, NI2SE'h..The project area is about 1 mile southwest of Keota, CO..A, map of the project. area is enclosed'.` The natural gas would be produced by Badger Federal LF 03-64HN, an authorized oil & gas well on PNG. The Bureau of Land Management (BLM), with Forest Service concurrence; authorized this well in December 2012.. Tlie Forest Service project for this well was called TWO BADGER WELLS PROJECT. As authorized, Noble .will, begin construction of the Badger Federal LF 03.-64FIN dig location will begin. after July 10, 2013 This well will be drilled before the end of August 2013, This well will be ready to produce by mid -September 20.13. Noble would like to have, the proposed pipeline constructed and ready to operate before this well comes on-line so that no natural gas will be flared after the well goes into production. Initial disturbance Of National Forest System (NFS) lands during construction of' the buried pipeline would include approximately I.45 acres (a corridor 30 feet wide along the length of the pipeline route). An additional 2,800 feetor so (053 mile) ofthe pipeline would be built on adjacent private lands, also with a 30 -foot wide disturbance corridor. A 30 -foot right-of-way for operationand maintenance of the pipeline would be authorized on NFS lands. Noble has proposed to use (iTneeded) some fresh water for dust abatement during construction of the project. The estimated amount used for the project would be less than 0.1 acre-foot. The pipeline construction would take less than a month to complete. All ground disturbance associated with the project would be reclaimed in order to re-establish native vegetation as early as possible. Documenting the NEPA Decision A Forest Service Inter -Disciplinary Team (IDT) has reviewed t1eproposed actionin the context of the applicable laws, Forest. Service policy, and other guidance, :including the 1997Revision to the Land and Resource Management Plan for the Arapaho and Roosevelt National Forests and Pawnee National Grassland. The IDT has determined that the proposed action would comply. with this direction. rnmoY\lcarfons Coln [13 Caring for the Land and Serving People 2013-1536 Panted on Recycled Paper tig0 Because Noble hasa valid right to develop the oil and gas resources under an authorized Federal oil and gas lease granted by the BLM, the Forest Service will not decide whether or.not Noble can construct the proposed pipeline, but under what circumstances the pipeline may be built. Therefore,. so long as a Categorical Exclusion may be: applied to the proposed action and a Decision Memo used to document the decision, a "no -action" alternative will not be considered. The project activities meet the requirements described in 36 CFR 220;6(e)(3): "Approval, modification, or continuation of minor special uses of NFS lands that require less than five contiguous acres of land." Use of this Categorical Exclusion requires a Planning Record and Decision Memo for documentation. Glenn Casamassa, Forest Supervisor, is the. Responsible Official and will sign the Decision Memo and would approve any permit that gould,authorize occupation and use associated with the project on NFS lands. Submiittin2 Comments, Comments on this proposed action may be submitted orally or in writing via letter, fax, or email. Oral comments may be submitted by calling 970-346-5000, Monday through Friday; between the hours of 8 a.m. and 4:30 p.m. Mountain Time. Written comments may be mailed toy Badger Pipeline Project, Pawnee National Grassland, 660 "O" Street, Greeley, CO 80631. Written comments. may- also be faxed to 970-346-5014:orsubmitted,yia,email to comments-rocky- mountain-arapaho-roosevelt-pawnee@fs.fecLus: Comments received viaemail should have the name of the project (Badger Pipeline Project) included in the subject line. For emailed comments, the sender should receive an automated electronic acknowledgement from the Forest Service as confirmation of receipt. If the sender does nbt receive this automated reply, it is the sender's responsibility to ensure timely submission of comments by other means. This comment period coincides with public scoping and will be the only opportunity to comment offered. Comments must be submitted per 36 CFR 215. Those who comment may be eligible to appeal. Comments will be accepted for 30 days after publication -of a legal notice in the Fort Collins Coloradoan on June 10, 2013: If you would like additional information about this project, please contact Mary Ann Chambers at 970-346-5000 or by email at riaachambersafs.fed ns; Sincerely, ,gez, LORI A. BELL District Ranger cc: Vernon E Koehler,MVlaryA Chambers Enclosure (project area map) BADGER PIPELINE PROJECT Project Area Map T. 8 Ng R. 60 1, 6th P.M., sec. 4, N1/2SE1/4. • cT• K LEGEND ==== Interstate Pipeline Corridor — — Badger Pipeline Proposed Route 33 Badger LF O3-64H.N Drilling Pad PRIVATE LANDS NFS LANDS . A Created by Vernon E. Koehler. Updated on 6/6/2013. 34 G• 11er1'aa 9 r .Hi` wit Jaitl 4961 3,000 4,000 5,000 Feet I I i Disclaimer: The US Forest Service uses the most current and complete data avatabIS: GIS data and product accuracy may vary. They may be: developed from sources of differing accuracy, accurate only at certain scales, based on modeling or interpretation, ihcomplete while being created or revised, etc. Using GIS products for purposes other than those for which they were created, *ay! yield inaccurate or misleading results. The U3 Forest Service reserves the right to correct, update, modify. or replace GIS products without notification: For more information, contact the Arapaho & Roosevelt National Forests and Pawnee National Grassland at (970) 2956600. Jennifer Fuller From: Sent: To: Cc: Subject: Attachments: Chambers, Mary A -FS [machambers@fs.fed.us] Wednesday, June 12, 2013 3:08 PM Chambers, Mary A -FS Koehler, Vernon E -FS; Bell, Lori A -FS Scoping letter for the Badger Pipeline project on the Pawnee National Grassland attached. Noble Energy Pipeline.pdf Attached is the scoping letter for the Badger Pipeline Project. The legal notice for this project appeared in the Coloradoan on June 10, 2013. You have 30 days after. the date is was published in the Coloradoan to comment. Mary Ann Chambers U5r5 970 5+6-5009 cell 970 690 795+ This electronic message contains information generated by the USDA solely for the intended recipients. Any unauthorized interception of this message or the use or disclosure of the information it contains may violate the law and subject the violator to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email immediately. Hello