Loading...
HomeMy WebLinkAbout750752.tiff HENSEL PHELPS CONSTRUCTION COMPANY ini:1111, WELD COUNTY SERVICES COMPLEX GREELEY, COLORADO Design Coordination Meeting October 23, 1975 Held At The Office of CNC/NHPQ In Attendance: Mr. Barton Buss, Weld County Mr. Bob Shreve, CNC/NHPQ Mr. Pete Boer, CNC/NHPQ Mr. Jerry Pope, HPCC Mr. Jim Sibert, HPCC Mr. Bob Higgins, HPCC In the meeting held on October 23, 1975 the following items were discussed: Item No. 1: The computer room and adjacent area security could be achieved by providing a lock on door 347 and 353A under separate keying. It was suggested that door No. 344 into the computer room should automatically lock when closed. Pete Boer will research and present possible alternatives in the near future. Item No. 2: General review and discussion on the furniture layout in the Data Processing area and adjacent offices. Computer room equipment layout should be available within the next six to eight weeks. Item No. 3: Temporary waterproofing will be required on the exposed area of first floor deck. Jim Sibert will obtain waterproofing recommendation and cost estimates from Douglass Roofing Company. Item No. 4: Availability of funds is not a problem for the exterior site and tunnel work. Jerry Pope recommends that the site work bid package be broken down into individual bid items such as footings and walls, sidewalks, curb and gutter, etc. to encourage local participation. Item No. 5: The 2nd Floor Courthouse Remodeling work bids received October 21, 1975 were reviewed. The revised estimated cost for this work excluding A/E fees is $144,938.00. Additional Items: The next Coordination Meeting will be held at the offices of CNC/NHPQ on November 21, 1975 at 8:00 A.M. Prepared By: Robert Higgins November 14, 1975 GREELEY , COLORADO B O B 3 1 ility Y�,, POST OFFICE BOX 0 OFFICE ANO WAREHOUSE AT 920 SIXTH AVENUE Ai 750752 /NE 8� • HENSEL PHELPS CONSTRUCTION COMPANY November 14, 1975 Mr. Barton A. Buss, Weld County Mr. Jere Hamilton, CNC/NHPQ Mr. Neal Carpenter, CNC/NHPQ Mr. Loren Bley, CNC/NHPQ Mr. John Haley, CNC/NHPQ Mr. Jerry Pope, HPCC Mr. Bob Shreve, CNC/NHPQ Mr. Jim Sibert, HPCC Mr. Pete Boer, CNC/NHPQ Mr. Robert Higgins, HPCC Subject: Weld County Services Complex Greeley, Colorado Gentlemen: Please find enclosed the minutes of the Design Coordination Meeting on the above referenced project. The minutes are from the meeting held on October 23, 1975. Very truly yours, HENSEL PHELPS CONSTRUCTION CO. Robert Higgins Estimator, Special Projects ch 17485. 18 Enclosure • r{`��`] G R E E L E Y , COLORADO 6 0 6 3 1 4:11 POST OFFICE BOX 0 OFFICE ANO WAREHOUSE AT 420 SIXTH AVENUE AREA CODE 303352-8565 (r Hello