HomeMy WebLinkAbout20130044.tiffSHEAR
ENGINEERING
CORPORAIION
Final Drainage. Erosion/Sediment Control and Water Quality Report
For.
Baldridge P.U.D., First Filing, First Replat
Weld County (Longmont), Colorado
Prepared for:
Mountain View Fire Protection District
9 119 County Line Road
Longmont. Colorado 80501
Prepared by:
SHEAR ENGINEERING CORPORATION
Project No: 2608-04-12
Dale: November 2012
Iiin,. 1' H. L nlluli. [ l 1 4115'", W-111 21. i i-4 dy I'1 -{1l 'ti"1131 I v., vyu...jlial CleplcciInv cum
'`I hereby certify that this report for the final drainage design of "Raldridge P.U.D., First
Piling, First Replaf' was prepared by me (or under my direct supervision) in accordance with
the provisions y'the Weld Coun storm drainage criteria for the owners thereof:"'
Brian W -Shear, P.E.
Registered Profession
State of Colorado No: 20262
a .c C)
w
It
y_,
Z/l C Rd &MC
g as UJW
N
H
2
Mountain View Fire Protection District
t.LLtrix•VV91'),--Mvax:viRfiii.,,m,”.76:144011*.itatffEitMarei,._,
TABLE OF CONTENTS
Title Page
Engineer's Statement
Vicinity Map
Aerial Map of existing conditions
Table of Contents
I. INTRODUCTION: 1
II. GENERAL LOCATION AND DESCRIPTION 1
A. Property location 1
B. Description of Property 1
III. DRAINAGE BASINS AND SUB -BASINS 2
A. Major Basin Description 2
B. Sub -Basin Description
C. Historic Conditions "i
IV. DRAINAGE DESIGN CRITERIA 5
A. Regulations 5
B. Development Criteria Reference and Constraints 6
C. Hydrological Criteria 7
D. Hydraulic Criteria 7
V. DRAINAGE FACILITY DESIGN 7
A. General Concept 7
B. Specilic Details — Runoff $
C. Specific Details —Detention 8
VI. WATER QUALITY 9
A. General Concept 9
VII. EROSION CONTROL 10
A. General Concept . tO
B. Specific Details 10
VIILCONCLUSIONS I0
A. Compliance with Standards 10
B. Drainage Concept 10
IX. REFERENCES 11
Appendices
APPENDIX I
Runoff
Detention
APPENDIX II
'fable RO-3. Recommended Percentage Imperviousness Values, 11SDCM
Table 5-1 Weld County Design Storm Rainfall Comparison
FIRM (Flood Insurance Rate Map) Community Panel Number 080266-0850-C (Panel
850 of 1075); Map Revised September 28, 1982.
APPENDIX III
1991 Historic Drainage Plan by Nelson Engineers
Existing Conditions, Demolition and Removal Plan (for historic conditions and historic
drainage data)
Drainage Plan
Erosion/ Sediment Control and Water Quality Pla❑
Details (Drainage, Erosion Control and Water Quality)
Page I
Final Drainage. Erosion Sediment Control and Water Quality Report
Baldridge P.LUD., First Filing, First Replat; Weld County (Longmont), Colorado
I. INTRODUCTION:
This report presents the pertinent data, methods, assumptions, and references used in
analyzing and preparing the final Drainage. Erosion/Sediment Control and Water
Quality design for "Baldridge P.U.D.. First Filing. First Replai
The site is currently developed with an existing detention pond located in the northeast
corner of the site. No previous drainage reports were located in Weld County records or
provided by Weld County personnel.
The area of development consists of approximately 4.51 acres according to the final
plat for Baldridge P.U.D., First Filing. Detention pond design with this project
accommodates the existing 4.00 acre area tributary to the pond for this redevelopment
only. Future potential development of the property to the west will require additional
drainage studies and improvements to accommodate the potential development.
H. GENERAL LOCATION AND DESCRIPTION
A. Property location
1. Baldridge P.U.D., First Filing. First Replat is located in the South one-half
(1/2) of Section 5 and North one-half (1/2) of Section 8. Township 2 North.
Range 68 West of the 6th P.M.. County of Weld. State of Colorado.
2. The property is bounded on the South by Vista View Drive. on the East by
Weld County Road 5, on the North by Colorado State Highway No. 119,
and on the West by Vista View Commercial Center Filing 1.
3. There are no major open channels, lakes, streams, irrigation or other water
resource facilities within or adjacent to the proposed development.
4. Refer to the vicinity map located near the beginning of this report.
B. Description of Property
Baldridge P.U.D., First Filing, First Replat has a platted area of
approximately 4.51 acres.
2.
The site was initially developed in 1984, according to Weld County
Assessor records, and included an existing 5,400 square foot Morton
Building. The Morton Building was built in 1984 according to Weld County
records and Morton Buildings. Inc. records.
Page 2
Final Drainage. Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D., First Filing. First Replat; Weld County (Longmont). Colorado
The site was redeveloped in 1991 by Donald and Adele Baldridge for
Universal Transport, Inc. The 1991 redevelopment included the addition of
a detention pond in the northeast corner of the site. There are no records of
the 1991 drainage report. The 1991 Drainage and Landscaping Plan by
Nelson Engineers details the detention pond and outlet structure. The 1991
Drainage and Landscaping Plan is included with this report for immediate
reference.
Existing developed site ground cover consists of approximately 79 percent
gravel, 3 percent roof area. I percent concrete. and 17 percent turf. Refer to
the aerial map located after the vicinity map at the front of this report The
site consists of hydrologic soil type B soils.
5. There arc no major open channels within or adjacent to the site. There is a
channel north of the existing detention pond. The purpose of the channel is
unknown. However, title work on the property suggests that this may he a
C'DOT wastewater overflow channel. Item 11 in the title work states:
Easement (s) far the purpose(%) shoran below and rights incidental thereto.
cis granted in a document:
Granted to: 71w Department of Highways.
Purpose.: Waste Ditch
Recording Date: March 25. /970
Recording Number: 1544311
6. The project is a replat of Lot ]. Baldridge P.U.D., First Filing and will create
two (2) lots. The site will continue as a commercial use. Lot 1 will he a 2.04
acre lot and will be redeveloped as a tire station by the Mountain View Fire
Protection District. Redevelopment will consist primarily of adding a
parking lot and expanding the detention pond. Lot 2 will he a 2.47 acre lot
and has been designated as a "Commercial" land use Ior the surface
drainage calculations in this report. I.ot 2 will remain in its current condition
until development activity is initiated on the Lot.
III. DRAINAGE BASINS AND SUB -BASINS
A. Major Basin Description
1. Weld County does not have any master drainage planning or delineated
basins for this area.
2. City of Longmont does not have any master drainage planning or delineated
basins for this area.
Page 3
Final Drainage. Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D., First Filing. First Reptat; Weld County (Longmont), Colorado
3. The Baldridge P.U.D., First Filing, First Replat site contains one single
major basin and no sub -basins. The major basin area is approximately 3.96
acres. The basin area changes slightly with the redevelopment of the site due
to the new access drives being provided on Weld County Road 5 and Vista
View Drive.
4. All runoff from the site is directed to the Northeast corner of the site and
ultimately to the west invert of an existing 30" diameter RCP culvert that
conveys runoff east under Weld County Road 5 to the Saint Vrain Creek.
5. There is no offsite contribution to the site.
6. Baldridge P.U.D.. First Filing, First Replat is not within a defined FEMA
Iloodplain. Reference FIRM (Flood Insurance Rate Map) Community Panel
number 080266-0850-C (Panel 850 of 1075; Map Revised September 28.
1982).
B. Sub -Basin Description
The Baldridge primary Basin is a sub -basin to the primary undefined
drainage basin for the immediate area.
2. There are no sub -basins currently defined within the main Baldridge basin.
Future development of Lot 2 may define additional sub -basins for future
detention pond volume requirements.
C. Historic Conditions
1. Ike -development historic conditions prior to the 1984 construction of the
existing building were not researched with this report. Historic conditions
presented here include current site developed conditions only. No previous
drainage reports were located in Weld County records. To determine
allowable site release rates for existing condition detention pond
requirements, a 2% imperviousness value was used to calculate the historic
5 -year peak flow.
2. The existing terrain slopes from the southwest to the northeast at an average
grade of 2.24%. Site runoff flows overland to an existing detention pond
located at the northeast corner of the site.
Page 4
Final Drainage. Erosion'Sediment Control and Water Quality Report
Baldridge P.U.D., First Filing. First Reptat; Weld County (Longmont), Colorado
3. The 4.00 acre drainage basin is 35.87 percent impervious, consisting of
approximately 3.18 acres of gravel. 0.13 acre of roof area, and 0.04 acre of
concrete and 0.66 acres of turf
a. The actual existing basin area was not well defined on the Baldridge
Subdivision, First Filing Drainage and Landscaping Plan by Nelson
Engineers. The basin area was defined based on a topographic and
improvement survey for the site by Intermill Land Surveying
(Loveland).
4. The 100 -year peak flow for the 4.00 acre basin is approximately 12.67 cubic
feet per second (cfs), as computed with an existing weighted runoff
rational coefficient of 0.48.
5. Refer to Appendix I- Runoff for existing condition and proposed condition
runoff calculations. The required 5 -year historic peak flow calculation for
the allowable site release rate is found in the Detention Pond -Existing Pond
Condition section of Appendix I.
6. The existing detention pond configuration has a storage capacity of 0.136
ac -ft. The required 100 -year detention volume calculated for this report
using the existing site groundcover condition and the 5 -year historic
allowable release rate, (0.80 cfs) is 0.488 ac -ft. Therefore, the existing
detention pond's available storage volume is insufficient to accommodate
the current conditions.
7. The existing detention pond outlet structure (see Photo 1 below) consists of
a 4'x4' concrete box with a two -stage release. The top of the box elevation is
4898.36. The existing elevation of the berm immediately east of the outlet
structure is 4897.80.
a. Note that stormwater would overflow the existing berm (4897.80) to
the east prior to reaching the elevation of the top of the existing box
outlet structure (4898.36).
Page 5
Final Drainage. Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D., First Filing, First Replac Weld County (Longmont), Colorado
•
Photo I Existing box outlet structure
8. The existing detention pond outlet structure restricts the release from the
pond with a 4" PVC orifice opening (as verified in the field). The original
drainage plan by Nelson Engineers specified a 3 5/8" orifice opening.
There is an existing 8" PVC outlet pipe at the hack (east) of the existing
outfall box structure. Flow from this pipe is directed to an existing riprap
bed. The discharge is then conveyed along Weld County Road 5 to the
intersection of State Highway 119 and Weld County Road 5.
10. No water quality devices were provided with the original detention pond.
l 1. Refer to the following plans located in the map pocket at the back of this
report:
• Baldridge Subdivision. First Filing Drainage and Landscaping Plan;
Nelson Engineers (Urecicy, Colorado); March, 1991
• Existing Conditions. Demolition and Removal Plan (for historic
conditions and historic drainage data)
IV. DRAINAGE DESIGN CRITERIA
A. Regulations
Design criteria from the Weld County Storm Drainane Criteria Addendum
to the Urban Storm Drainage Criteria Manuals Volumes 1. 2 and 3. October
2006 (WCSDC) and the Urban Storm Drainage Criteria Manuals Volumes
1, 2 and 3 (USDCM). and the Weld County Engineering and Construction
Criteria April 2012, were utilized.
Page 6
Final Drainage, Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D., First Piling. First Replat; Weld County (Longmont). Colorado
The latest versions of the Urban Drainage and Flood Control District
(UDFCD) software were used for runoff and detention calculations.
R. Development Criteria Reference and Constraints
1. No previous drainage reports were located in Weld County records or
provided by Weld County personnel All previous drainage concepts were
taken from the Baldridge Subdivision, First Filing Drainage and
Landscaping Plan; Nelson Engineers (Greeley, Colorado): March, 1991.
2. Generally. any additional development within the site will not redefine
grades along the property boundaries.
a. Colorado State Highway 119 exists to the north. A fifteen loot (15')
utility easement is adjacent to the Colorado State Highway 119 south
right-of-way.
b. There is a drainage channel defined between the north side of the
existing detention pond and the north boundary of the site.
c. Weld County Road 5 exists to the east. Weld County Road 5 is paved.
Weld County' personnel have advised that there is little likelihood for
Weld County Road 5 to widen.
i. A fifteen foot (15') utility easement is adjacent to the Weld County
Road 5 west right-of-way with existing electric facilities located
within the easement.
ii. Existing side road drainage swales and culverts will remain.
d. Vista View Drive exists to the south. Vista View Drive is paved.
i. A fifteen foot (15') utility easement is adjacent to the Vista View
Drive north right-of-way.
ii. Existing side road drainage swales and culverts will remain.
3. Existing improvements on site will remain including the existing building,
sanitary sewer service facilities (manhole and grease trap), electric facilities
including a large vault, the detention pond outlet structure, and an existing
gas service line.
Page 7
Final Drainage. Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D., First Filing, First Replat. Weld County (Longmont), Colorado
C. Hydrological Criteria
The one -hour point rainfall for the 5 -year. 10 -year and 100 -year storm
events are 1.39. 1.75 and 2.70 inches respectively, based on Figures RA -1
through RA -12 Rainfall Intensity -Duration Curves oldie USDCM.
2. Rational Method - The Rational Method was used to determine peak runoff
rates for the site for the sizing of detention pond volumes.
a. Percentage imperviousness values were taken from Table RO-3.
Recommended Percentage Imperviousness Values (See Appendix Il).
b. Runoff calculations were completed using the Rational Formula defined
in Section 2.1 of the USDCM.
The Modified FAA Method was used to calculate site detention
requirements.
D. Hydraulic Criteria
Design criteria from the Weld County Storm Drainage Criteria Addendum
to the Urban Storm Drainage Criteria Manuals Volumes 1. 2 and 3. October
2006 (WCSDC) and the Urban Storm Drainage Criteria Manuals Volumes
I. 2 and 3 (USDCM) were utilized.
Pond outlet pipe capacities are based on HDS-5 culvert methodology as
implemented in the UDFCD software.
V. DRAINAGE FACILITY DESIGN
A. General Concept
1. The storm drainage systems arc designed to salcly convey the 100 -year
storm event runoff by sheet flow regimes over concrete and vegetation
across the site to the detention pond located in the northeast corner of the
site.
a. The proposed detention pond will attenuate the developed condition
100 -year storm event runoff in order to not exceed the allowable site
release rate.
Page 8
Final Drainage, Erosion/Sediment Control and Water Quality Report
Ratdridge P.U_D., First Filing First Replat; Weld County (Longmont), Colorado
B. Specific Details -- Runoff
The Rational Method was used to determine the peak runoff rate of 16.27
cfs for the 100 -year storm event for the proposed condition 3.96 acre
drainage Basin A.
There is no oft -site runoff conveyed through the site.
3. Runoff from basin A is conveyed to design point 1, located at the detention
pond outlet structure.
a. Runoff from the small outer areas of the access driveways totaling
0.05 acres is released undetained from the site.
C. Specific Details — Detention
I . The proposed detention pond has been sized to accommodate the proposed
redevelopment favour of hot I. and a future land use designation of
"commercial" for the entire area of Lot 2. The required 100 -year detention
volume is 0.853 ac -ft. This volume is attained at elevation 4898.44 (100 -
year WSEI. = 4898.44) within the new pond grading configuration.
a. The proposed detention volume was computed using the Modified
FAA Method and the compensating detention procedure due to the
undetained runoff from 0.05 acres of access driveway area. The
allowable release was computed as 0.80 cfs (5 -year historic) — 0.44 cis
(undetained) = 0.36 cfs.
The proposed detention pond outlet will consist of the existing outlet
structure box including the 4" orifice and 8" PVC' discharge pipe.
a. A one loot tall concrete water quality structure (top du = 4896.90)
with orifice plate (1 column x 3 rows of 0.813" dia holes) and
protective screen. will he constructed and attached to the front of the
existing box outlet structure, upstream of the existing 4" orifice. The
required water quality- volume is 0.107 ac -ft.
b. A restrictor plate will go over the 8" pipe outlet with a bottom edge of
plate elevation of 4895.75.
c. 'the top of the existing outlet box elevation is 4898.36. slightly below
the proposed 100 -year WSEL of 4898.44.
Page 9
Final Drainage. Erosion/Sediment Control and Water Quality Report
Raldridee P.U.D., First Filing, First Repine Weld County (Lonemoni), Colorado
d. The emergency overflow weir for the pond will have a crest length of
Fifteen feet (15') and a crest elevation set at 4898.69. The emergency
overflow weir will convey the proposed developed condition peak
flow of 16.27 efs at an operating head of less than 6" over the weir
crest, per the Weld County criterion. The elevation of the top of the
proposed pond berm is 4899.69, providing greater than 1.00' of
freeboard over the I00 -year WSEL.
e. Please see the detail of the outlet on Sheet 14 of 14 of the Sitework
Improvements Construction Plans.
Please see all of the detention design data, including the detention pond
volume rating curve, and the outlet stage -discharge curve in the detention
section of Appendix I.
VI. WATER QUALITY
A. General Concept
1. The existing detention pond will serve as a siltation pond during overlot
grading operations and sitework improvements_
Runoff is designed to flow as long as possible in sheet flow regimes over
concrete and vegetation across the site promoting scrubbing of sediment and
pollutants.
a. Construction BMP's will consist of:
Gravel vehicle tracking control pad at the proposed Weld County
Road 5 entry to the site.
ii. Wattles in the channels, area inlet protection and a detention
pond outlet structure.
ii. Surface roughening and re -vegetation.
iv. Silt fence, preventing sediment in runoff leaving the site
immediately bordering the extent.
The detention pond will act as a sediment basin during overlot
grading operations and sitework improvements.
Page 10
Final Drainage. Erosion/Sediment Control and Water Quality Report
Baldridge P.U.D.. First Filing, First Replat; Weld County (Longmont(, Colorado
VII. EROSION CONTROL
A. General Concept
1. Erosion control best management practices will minimize the amount of
sediment being transported from the site during and after construction.
13. Specific Details
1. During construction. wattles will be placed along channel inverts and at the
entrances to culverts to minimize the propagation of sedimentation prior to
finished grading and landscaping being installed.
2. During construction, a riprap pad will he placed at the detention and water
quality pond preventing erosion from flow discharges.
3. Silt fence will he installed all along the northerly and easterly edge of the
Project site.
4. Permanent re -vegetation will be required for all disturbed earth. Please see
the re -vegetation notes and seeding schedule on Sheet 10 of 14 of the
Sitework Improvements Construction Plans tilled "Erosion/Sediment
Control and Water Quality Plan". This plan is also included in Appendix Ill
of this report.
VIII.CONCLUSIONS
A. Compliance with Standards
The grading and drainage design for the Baldridge P.l1.D., First Filing. First
Replat complies with the requirements of the Weld County Storm Drainage
Criteria Addendum to the Urban Storm Drainage Criteria Manuals Volumes
1.2 and 3, October 2006 (WCSDC).
All proposed erosion control measures comply with the Weld County Stout
Drainage Criteria Addendum to the Urban Storm Drainage Criteria Manuals
Volumes I, 2 and 3. October 2006 (WCSDC) and generally accepted
erosion control practices.
B. Drainage Concept
I. The drainage design for Baldridge P.U.D.. First Filing. First Replat will
safely convey onsite flows through the development.
2. The proposed detention pond enlargement significantly improves and
remedies the current inadequate detention pond volume problem on the site.
Pace I I
Final Drainage. Erosion/Sediment Control and Water Quality Report
Raldridee P.U.D.. First Filing_. First Replat: Weld County (Longmont), Colorado
IX. REFERENCES
A. Weld County Storm Drainace Criteria Addendum to the Urban Storm Drainage
Criteria Manuals Volumes 1.2 and 3. October 2006.
B. Weld County Engineering and Construction Criteria. April 2012
C. Urban Storm Drainage Criteria Manual Volume 1: Urban Drainage and Flood
Control District, Denver, Colorado.
D. Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood
Control District, Denver, Colorado.
E. Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices;
Urban Drainage and Flood Control District. Denver, Colorado.
F. Baldridge Subdivision, First Filing Drainage and Landscaping Plan; Nelson
Engineers (Greeley. Colorado); March. 1991
APPENDIX I
Runoff
Detention
Runoff Calculations
Existing Conditions
Proposed Conditions
Detention Pond Volume Calculations
Existing Pond Condition
Proposed Pond Condition
Water Quality Control Volume
Runoff Calculations
Existing Conditions
Area -Weighting for Runoff Coefficient Calculation
Project Title:
Catchment ID:
Illustration
Baldridge PUD
Existing Condition Basin Analysis
Instructions: For each catchment subarea, enter values for A and C_
SubareaArea
Runoff
Product
ID
acres
Coeff.
A
C'
CA
input
input
input
output
gravel
3.18
40.00
127.20
lawn
0.66
2.00
1.31
roof
0.13
90.00
11.25
concrete
0.04
100.00
3.64
Sum:
4.00
Sum:
143.44
Area -Weighted Runoff Coefficient (sum CNsum A) = 35.87
'See sheet "Design Info" for inperviousness-based runoff coefficient values.
UD-Rational vl .02a - Existing Condition 100yr, Weighted C 11/14/2012, 12:20 PM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title:
Catchment ID:
Baldrtdge Pin
Existing Condition Basin Analysis
I. Catchment Hydrologic Data
Catchment ID =
Area =
Percent Imperviousness =
NRCS Sod Type =
4.00 Acres
35.87 %
B A, B, C, or
II. Rainfall Information I (inchlhr) = C1 ' P1 f(C2 4- Td)CC3
Design Storm Return Period. Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= O786 (input the value of C3)
P1= 2.70 inches (input one -hr precipitation —see Sheet 'Design Info')
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C =
Overide Runoff Coefficient. C
5-yr. Runoff Coefficient, C-5 =
Override 5-yr. Runoff Coefficient, C
0,48
(enter an overide C value it desired, at leave blank to accept calculated C.)
0.28
(enter an overide C-5 value if desired, cc leave blank to accept calculated C-5.)
Illustration
LEGEND
O Brdmtbg
Flew Dincdam
Catchment
Miamian,
NRCS Land
Type
Heavy
Meadow
Tillage,'
Field
Short
Pasture,
Lawns
Nearly
Bare
Ground
Grassed
Stales/
Waterways
Paved A eas &
Shallow Paved 5wales
, {Sheet Flow
Conveyance
2.5 5
7
10
15
20
Calculations:
Reach
ID
Overland
Shope
s
tuft
input
0.0305
0.0224
Length
L
It
input
141
401
5-M
Runoff
Coen
C-5
output
0.28
NRCS
Canvey -
ante
input
N/A
5.00
Flow
Velocity
V
fps
output
0.19
0.75
Flow
Time
Tr
minutes
output
12.21
6.93
1
2
3
4
5
Sum
542
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 5.16 inctt/hr
Rainfall Intensity at Regional To. I= 6.54 inch/hr
Rainfall Intensity at User -Defined Tc. I = 6.54 inch/hr
Computed Tc --
Regional Tc
User -Entered Tc =
Peak Flowrate. Op
Peak Flowrate. Op =
Peak Flowrate. Op =
21.14
13.01
13.01 _
9.99 cfs
12.67 cfs
12.67 cfs
LID -Rational v1.02a - Existing Condition 100yr, To and Peak0 11/14/2012, 12:21 PM
Proposed Conditions
Area -Weighting for Runoff Coefficient Calculation
Project Title:
Catchment ID:
Baldridge PUD
Illustration
Basin A (Lots 1 & 2)
LEGEND:
Plow Direction
Carchm err
Boundary
Instructions'. For each catchment subarea. enter values for A and C.
Subarea
Area
Runoff
Product
ID
acres
Coeff.
A
C'
CA
input
input
input
output
gravel
0.52
40.00
20,96
roof
0.18
90.00
15/7 _
concrete
0.26
100.00
25.89
Greenbelt
0.86
2.00
1.71
Commercial
2.15
95.00
203.85
Sum:
3.96
Sum:
268.19
Area -Weighted Runoff Coefficient (sum CAlsum A) = 67.71
*See sheet "Design Info" for imperviousness -based runoff coefficient values.
UD-Rat- 100yr Proposed Basin New, Weighted C 11/14/2012, 12:23 PM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin A
Area = 3.96 Acres
Percent Imperviousness = 67.71
NRCS Soil Type = 8 A, R. C. cc 0
Baldrldge PUD
Basin A(Lols 1 82)
II. Rainfall Information I (inch/hr) = C1 ' P1/(02* Td)AC3
Design Storm Return Period, Tr =
C1 = 28.50
C2= 10.00
C3= 0.786
P1=
10 years
1.75 inches
(input return period for design storm)
(input the value of C1)
(input the value of 02)
(input the value of C3)
(input one -hr precipitation —see Sheet 'Design Info")
III. Analysts of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C =
Overide Runoff Coefficient. C =
5-yr, Runoff Coefficient. C-5 =
Ovende 5-yr. Runoff Coefficient. C
0.51
(enter an overide C value if desired, or leave blank to accept calculated C.)
0.47
(enter an overide C-5 value d desired, or leave blank to accept calculated C-5.)
Illustration
O BeeaotK
Flu. Direrti+a
4--
Calelm...t
Bnen4.q
NRCS Lend
Type
I Heavy
Meadow
Tillage(
Field
Short
Pasture!
Lawns
Ready
Bare
Gmund
Grassed
Swalesl
Waterways
Paved Areas &
Shallow Paved Swales
(Sheet Flow)
r Conveyance I 2.5
5
7
10
a 15
20
Calculations,
Reach
ID
Overland
Slope
s
h/d
Input
0,0346
0.0472
0.0050
Length
L.
rt
input
137
172
195
5-r
Runoff
Geoff
C-5
output
0.47
NRCS
Convey-
ance
Input
NIA
15.00
20.00
Flow
Velocity
V
fps
output
0.26
3.26
1.41
Flow
Time
if
minu les
output
682
0.88
2.30
2
3
4
5
Sum
504
IV. Peak Runoff Prediction
Rainfall Intensity at Computed 14. i
Rainfall Intensity at Regional Tc. I =
Rainfall Intensity at User -Defined Tc, I =
4.39 inch/hr
4.27 inchlhr
439 inchlhr
Computed Tc
Regional Tc
User -Entered Tc
Peak Flo /rate. Op =
Peak Flowrate. Op =
Peak Flowrete. Op =
11.99
12.80
11.99
8.95 cfs
8.70 cfs
8.95 cfs
UD-Rat- 10yr Proposed Basin New, Tc and Peak() 1 111412 01 2. 1225 PM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin A
Area = 3.96 Acres
Percent imperviousness = 67.71 to
NRCS Sal Type = B A, B, C. a- D
Baldddge PUD
Basin A (Lots 1 & 2)
II, Rainfall Information I (inchlhr) = C1 • P1 1(02 + Td)"C3
Design Storm Return Period. Tr = 100 years
C1 = 20.50
C2= 10.00
C3= 0.786
P1= 2.79 inches
(input return pened for design storm)
(input the value of Cl)
(input the value of 02)
(input the value of C3)
(input one -hr precipitation —see Sheet "Design Info")
Ill. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coelkcient, C =
Overide Runoff Coefficient, C
5-yr. Runoff Coefficient. C-5 =
Overide 5-yr. Runoff Coefficient. C =
0.61
(enter an overide C value if desired, or leave blank 1c accept calculated C.)
0.47
(enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Jllustration
LE�'$F 77
O Begiimta:
Flew Dinciin
l —
Catchment
Beandar7
NRCS Land lo Heavy
Type Meadow
Thane/
Field
Short
Pasture/
Lawns
Nearly
Bare
Ground
Grassed
Swages,
Waterways
Paved Areas &
Shallow Paved Swages
(Sheet Flow)
Conveyance II 2.5
5
7
10
15
20
Calculations:
Reach
ID
Overland
Slope
5
input
0.0346
0.0472
0.0050
Length
L
ft
Moo
137
172
195
5-N
Runoa
Coes
C-5
output
0.47
NRGS
Convey.
once
input
NfA
15.00
20.00
Flow
Velocity
V
fps
oulpul
0.26
3.26
1.41
Flow
Time
TI
minutes
pe 1p yi
8.82
0.88
2.30
1
2
3
4
5
Sum 504
FV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I =
Rainfall Intensity at Regional Tc, I =
Rainfall Intensity at User -Defined Tc, I =
6.78 inch/hr
6.59 inchlhr
6.76 inchlhr
Computed Tc
Regional Tc =
User -Entered Tc
Peak Flowrate. Op --
Peak Flowrale, Op =
Peak Flowrate, Op =
1t 99
12.80
11.99
16.27 cfs
15.61 cis
16.27 cfs
LID -Rat- 100yr Proposed Basin New. Tc and PeakO 11714/2012. 12:23 PM
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title:
Catchment ID.
I. Catchment Hydrologic Data
Catchment ID =
Area =
Percent imperviousness =
NRCS Soil Type =
0.05 Acres
100.00 %
B A. B. C. or D
Baldridge PLOD
Proposed Undetained Flow
II. Rainfall Information I (inch/hr) = C1 ' Pl /(C2 r• Td)AC3
Design Storm Return Period, Tr= 100 years
Cl = 28.50
C2= 10.00
C3= 0.766
P1= 2.70 inches
(input return period for design stone)
(input the value of C1)
(input the value of C2)
(input the value of C3)
(input one -hr precipitation —see Sheet 'Design Info')
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient. C = 0.96
Ovarido Runoff Coefficient, c =
5-yr. Runoff Coefficient C-5 = 0.90
Overide 5-yr. Runoff Coefficient, C =
(enter an ovedde C value if desired, or leave blank to accept calculated C.)
(enter an overdo C5 value if desired, or leave blank to accept ca'cureted C-5.)
Jllustratiort
105 ;13.12
O OQieetrs
Flew Dint don
catclw.nt
aooaaay
NRCS Land
Type
Heavy
Meadow
Tillage/
Field
Shod
Pasture/
Lawns
Nearly
Bare
Ground
Grassed
Swalesf
Wate
Paved Areas IS
Shallow Paved Swales
(Sheet Flow
Conveyance
2.5
5 e
7
10
15
70
Calculations:
Reach
ID
Overland
Slope
S
not
input
0.0200
Length
L
ft
Input
15
5-yr
Runoff
Coen
C-5
output
0.90
NRCS
Convey-
ance
input
N/A
Flow
Velocity
V
IPS
output
0.22
Flow
Time
Tf
minutes
output
1.14
1
2
5
4
5
Sum
15
IV. Peak Runoff Prediction
Rainfall Intensity at Computed To. I =
Rainfall intensity at Regional To. I =
Rainfall Intensity at User -Defined Tc. I =
11.57 inch/fir
7.26 lnctvhr
9.16 inch/hr
Computed To =
Regional To =
User -Entered Tc =
Peak Flavrate, Op =
Peak Flovrate. Op =
Peak Fluvrata, Op =
1.14
10.08
5.00
0.55 cfs
0.35 cfs
0.44 cfs
LID -Rational v1.02a - 100yr- Proposed Undetained Flaw, Tc and Peak() 9/512012.4,13 PM
Detention Pond Volume Calculations
Existing Pond Condition
Baldridge PUD
Detention Pond
Existing Detention Pond Volume Rating Curve
Area
Elevation (ft.) (ft. 2)
95.89
96.00
97.00
97.50
0
712
4,973
7,151
Cumulative
Area Storage
(acre) (acre -ft.)
0.0D0
0.016
0.114
0.164
0.000
0.001
0.066
0.136
100 year Volume Required = 0.488 acre -ft
100 -year WSEL = Insufficient Volume
12:43 PM
Ernst Engineering, LLC 11/14(2012
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID =
Area =
Percent Imperviousness=
NRCS Sod Type =
396 Acres
2.00 %
B A, B, C. or El
Baldridje PUP
Historic Field analysis
II. Rainfall Information I (Inchihr)=C7' P1 f(C2 + Td)^C3
Design Storm Return Period. Tr = 5 years (input return period for design storm)
C1 = 28.50 (input the value of CI)
C2= 10-00 (input the value of C2)
C3= 0,786 (input the value of C3)
P1= 1.39 inches (input one -hr precipitation --see Sheet "Design Info")
III, Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient. C
Overide Runoff Coefficient, C =
5-yr, Runoff Coefficient. C-5 =
Overide 5-yr. Runoff Coefficient, C =
0.08
(enter an °vericle C value if desired, or leave blank to accept calculated C.)
0.08
(enter an everide C-5 valued desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Lend
Type
Heavy
Meadow
Tillage/
held
Shod
Pasture)
Lawns
Nearly
Bare
Ground
Grassed
Sealed
Waterways
P. Areas 6
Shallow Paved Swales
(Sheol Flow)
Conveyance
25
5
7
10
15
20
Calculations:
Reach
ID
Overland
Slope
S
Rift
input
0.0305
0.0224
Length
L
n
input
141
401
5-yr
Run or
Coed
C-5
output
0.08
NRCS
Canvey-
anCe
input
N/A
5.00
Flow
Velocity
V
fps
output
0.16
0.75
Flow
Time
Tf
minutes
output
15.11
8.93
1
2
3
4
5
Sum
542
IV. Peak Runoff Prediction
Rainfall Intensity at Computed To. I= 2.48 inchfhr
Rainfall Intensity at Regional To, I= 3.37 inch/hr
Rainfall Intensity at User -Defined Tc, I r 2.48 inch/hr
Computed Tc = 24.04
Regional To =
User -Entered Tc =
Peak Flowrate. Op =
Peak Fiowrate, Op=
Peak Flowrate, Op
13.01
24.04
0.80 cis
1.09 cfs
0.00 cfs
LID -Rat - 5yr Historic Field Analysis 2%. To and PeakO 11/1412012. 12:29 PM
DETENTION VOLUME BY THE MODIFIED FAA METHOD
(Se. USDCM volume 2 Storage Chapter for dotalplied el A3110001
Project: Betdridge PUD
Begin Oc Existing Conditions
(For catchments less than 160 acres only. For larger catchnenli, use hydroomph 0366109 method)
Deten do Mon of 1.11003 Delanilon Vol urns Using Modified FAA Method
Delam5n neon of 1.14.42.41 DetenlIon Velure Using Modified FAA Melted
Deslon Information Irout7
Pollan elfemstlon (houtl'
Cti•,nn0,.9..0.lnpen4.e'e00
12.
35 e1
620
egvM1nm9O•sv9. 1.600mm,a
61 3511 1101208
catch -.N 00.2. A.. a .
en.
cedmaara 0..332.4,...par .00 Am.
400.
Priklik4264,144142125.8400'35 41501
a
40 k 8
6,elo+ebpnrf 05x6505 Copp TIL.= A. s. C. no
Ralun,20dud lry ovm,im 037601
10
5ern 11,010.24.50. or 1,200
Recur, 1x0047 b. ed9onCool0 1• m48,2.5102550,.10.0i
Tnn 8GCMn.InW,NwWa151N 1=•
II0.10150
Tao 31 93844.60.050111960.190 1,=
aid Reams Rate
r.•
32v
ch. art
0x761
••'°4 16111914.420 559
Cn1W 2,90.600.0.4p.•
010
41/21829.0.x.10,^,20461.,0
5(905
175
775
Dtilqn !a1leniw lamuu I - C: PAC0472'Ce
D614n 141019.20! Formula I.0; P.1C,•ld'q
Cwnun166r C.
25.50
ne3.0'. C.= 2350
Cwi7oo4T.o CI.
10
Cuen.e.ni,w 40
360 0000 41222 C.•
0109
22221164.01-1123. C.= 0169
gatominatlon N Avnrenn Outflow Irmo the Basin ICMruleledp
pe4mi nation OF Avtrene (5,54141., from the eoin Ireirul. Lad)
51900 0041600001 0• 014
R.unCm,rwn 0, 019
k,PY Runlr 090- 540
4,Tx Ye4. 83011 Op.m 1].10
AD Ii
Am.edn Po.l.amw Rant a9a4• 530 dl
ee,,.mw pot 06154. -Par. Or..- 017 e
Mod. I IA Nre Memo. vows.• 1117 .
MCD.IM al ere Bw•9•Vewm.• 0161 eo>a1Mr
Yoa 16A NeIe Morass women- OAFS 84be srel
4441
Ales. 16A M.p, Perim. vdume• SAN aeuAr
10
Brie.
Rrtlul
Wbx
9akakere
bretak
Mau
840004
Rmree
Rnla
Doh.
Ml
31,00
04984
6byn
pits.
n,.ea,.
vets
Rr<a0ry
vu. ke
1 urn 451
�'
01x4.
a
0,3.10
.01101
.36.03
eeoo,14
oueal
a
slw.r It
.10..01.
3"e u.
rJ814n
55
''^'
o, 51'
m
o.. lie
01x.0411
vo.nw
4,,.1.31
rWi1.a1
7x41+17
0)2,..1‘21
103,271
fQMNI'=
.07,21.
YU411
100
,,0441
„•0
163,271
',Arai
c e o
04 cla4 5 600 Dog a
765
00o
425 tII3 080 160 3704
19 124
0316
1 00 Ole ado 2856
ie
to 511
8697 192 4161
.559 072
A 505
1210.
Del ON 11 316
30 2I]
52
225 eA T 1.03] 5917
1.19
1411
aR 050 ,44 154^_
226
!W 066 051 1452 6.1.58
40
40 ]51
16.161
212
066 1P] 11911
50 I9)
WI 0 63 010 1.512 0535
50 301
12515
0 63 030 1 513 16 006
20 1 75
546 081 0 49 1563 6194
50 269
15915 061 049 1752 702 16051
54 15]
On3 0.50 0A7 1932
0991
TO 242
19515 059 041 1990 17550
56 192
345 050 016 2?]]
60 321 M,u2 059 044 22)2 1l.III
906 1 12
190 122 22
575 PS/ 04i
971 057
2.472
3714
6203
]259
to 103 21 012051 016 2112 16301
.64 1 057 015 2712 19.227
161 1 550240
0 56 045
952
5269
HO I"6 12.395 0 54 045 2902 19351
120 107
055 134
102 .
1291
120 105 22544 055 0.4 3.195 04152
130 191
0 653116 055 044
5
Ail 2265
130
155 2314 0 10 044 ]612 19219
140 0
091 01
055 0.4
OI710 054 5 41
.642 7251
912 7217
540
150
140
1413
73006 055 04. 3.072 70.134150
11103 051 043 3912 20.125
104 001
316 ON 04
152 2.141
163
I3a
24 448_ 054 0 17 4.151 305896
140 a 1
1811 019
A31
5.66. 070 9 4
]92 7 102
632 7L29
i 10
ISO
126
I23
21 074 0 5 0 45 4 092 25.542
35.190 0 5 0 1 4 612 20.300
190 0.76
<071 a
572 5945
190
25,741 043 4.612 20.576
240 013
210
051
001115 053
0 4
0.41
6261
151 6762
000
010
113
107
25079 0.51 013 5.112
26390 453 012 5,35
20961
220 0.64
3.350 053
0 47
501 6661
720
106
26.700 053 042 5 5
21106
7]0 086
2192 053
OA2
511 6.561
PIO IO2 6992 05] 0.2 5.03
21.160
742 04
2.511 053
OA2
071 0,400
ND 0.99 21272 0 9 042 501
21201
250 002
245 053
058.
110 6.304
250 0% 27703 053 042 6.31
21232
250 060
2.305 0 53
0._
551 6214
]50 091 22504 053 042 655
21253
270 0 go
.ra1 052
VA
.041 6,090
270 099 24001 052 012
5070
21205
240
1903 052
41
031 5952
200 006 24702 552
2120,
29]03 055
132 052
Da,
5571
290 065 11 539 052 042
727
21278
309 054
3206 5.52
04
511 594 591
200 063 25505 052 042
751
21231
310 051
3311 0.52
04
251 5559
310 051 21991
052
175
71241
320 051
3417 09
5410
320 019 59.010
052 042
199
21310
2111 051
3505 052 OA
573
231 5276
330 0 71 2942
0 52 IP41
623
]1.150
340 0 45
100 052 04
AI, 5131
340 076 9459
052 012
8.30
21,157
322 OAS
3.5% 052 04
011 4901
0 i4 29.9175
057 6340
21 1 18
214,7474
MO
0.6
3.122 A 052
3612 052 04
961
101
4632
1 M
360 072 300]5
300
314 0.51 30216
05] 01. 115
052 011 919
.1025
310
310 0 45
3939 052 0 4
131
4.70
350 509 30.191
052 04. 603
20571
390 0.9
201 0.52 04
571
!37371
oso 006 47146 557 0 11 947
20.915
400 003
4.124 0.53
0A
.911
1214
400 061 30.706 0 91
011 101
20 1114
410 04
105 052
013
is
.H
410 05! 31911 052
04 10.105 20.190
470 042
1 51 052
04
034
38093
020 005 3312 0SI
041 10391 20.121
Im 041
4361 002
04
pal
Sna
410 061 31390 052
011 10631 20.452
110 040
4431 051
04
Der
5566
440 061 31.445 06
10011 20545
1!.0 040
4511
0 51
0 1
1 11
3400
450 061 3160' 03
041 11 111 20446
460 039
5114
051 04
125
1213
060 31755 05
115
470 039
46
01
159
3055
470 051, 31 922 0 5
041 11501 20.131
460
412620
191
7.850
190 ow 32225 5
0 41 11 071 20244
490 037
4 195
051 04
2.01
2.324
7
090 051 32225 00
7 4. 17.01123,053
500 016
406]
0 51 04
2310 2552
505 016 32273 05
0 41 12310 AW3
510 016
510 0 3
4925
2695
051 01
2.550 2?79
2520 2205
510 0 55 32510 o 5
120 055 37662 05
04f 17050 1t we
0.41 12.740 0301
510 0 3
5050 0.51 04
3030 2029
530 OH 32601 05
041 14010 19 722
540 034
4,Iv 051 04
3210 I153
5.0 0.5.7 3141 03
041 13210 10071
550 010
5.1125 051 04
3310 1a6
550 052 35021 05
0 41 13510 10051
370 011
070 033
5749 051 04
5. 051 01
3450
3220 1319
560 0.04 1.3 212 5 5
570 051 31 341 05
041 12750 19061
0.41 13990 19354
550 032
53499ae 0 51 0 4
4230 1110
560 030 33424 03
041 11230 19.141
590 032
542/ 051 01
5.330 007
1,00 044 33 603 05
040 3131
400 097
5160 051 0"
1710
605 044 33122 0 5
On 11710 19.0:0
..nlc30cn1• . • . •
Mort eark g Mar Storage Volum dartlia • 0.1625 Moe 540Mapr 6r'imamVolume loved l
00100 DETENTITION BASIN VOLUME ESTIMATING W OFK0000K Vet eion 2.3 Fe93ased larch 2012
00.9041.4041.0614bn,Ya0 '/21 Wined FAA
11212002 12 56 93
DETENTION VOLUME BY THE MODIFIED FAA METHOD
(Sae USDCM Volume 2 Mews Chapter for descd0lion of teethed].
Project: Baidrldge PhD
Basin (': Existing Conditions
r'
Inflow and Outflow Volumes vs. Rainfall Duration
90.000
25.000
30.000
25.000
1D0 200 300 400
Duration (Minutes)
SOO SOO 700
UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Ve+sism 2..1. Released March 2012
[alor, Geetton . I.son e2 ). stalled FAA
nns.Tll2. 1.1563T1
Proposed Pond Condition
Baldridge PUD
Detention Pond 11-12.12
Proposed Detention Pond Volume Rating Curve
Elevation (ft.)
95.89
Area (ft.')
0
Area
(acre)
0.000
Cumulative Storage
(acre -ft.)
0.000
Notes
96.00
348
0.008
0.000
97.00
17,827
0.409
0.209
98.00
20.045
0.460
0.644
98.44
21,113
0.485
0.853
100 yr WSEL
98.69
21412
0.496
0.974
100 yr Emergency Overflow Weir Crest
99.00
22,530
0.517
1.131
99.19
22,980
0.528
1.231
100 yr Emergency Ovellow Operating Head
99.69
24,167
0.555
1.501
Top of Pond Berm
100 year Volume Required =
WQCV Required =
0.853 acre -ft
0.107 acre -ft
100 -year WSEL = 98.44
WQWSEL = 96.51
3:48 PM
Ernst Engineering 11/15/2012
Area -Weighting for Runoff Coefficient Calculation
Project Title:
Catchment ID:
Illustration
Baldridge PUD
Compensating Detention Area
Instructions: For each catchment subarea, enter values for A and C.
Subarea
Area
Runoff
Product
ID
acres
Coeff.
A
C`
CA
input
input
input
output
gravel
0.52
40.00
20.96
roof
0.18
90.00
15.77
concrete
0.26
100.00
25.89
Greenbelt
0.86
2.00
1.71
Commercial
2.15
95.00
203.85
Access
0.05
100.00
5.0D
Sum:
4.01
Sum:
273.19
Area -Weighted Runoff Coefficient (sum CAlsum A) = 68.11
'See sheet "Design Info" for inperviousness-based runoff coefficient values.
Compensating Detention Area, Weighted C 11/14/2012, 1:39 PM
DETENTION VOLUME BY THE MODIFIED FAA METHOD
(See USDCM Volurre 2 Sling, Chapter Ai dtoc31ptOon of owned)
Project: Baldridge PUD
Oaem 0, Proposed Condition
IFO00atcllnYnta 0091 Nan 156 coots Only. Fix harper cafchnien is. use h9drograph Ton ling method:
Det.minrtlen of 53.ti0R Delenlien Malone Doing Modified FAA Method
Delemlmtlon nl 1.1A.;:11, Detention Vonore Using Modified FAA Method
pinion Fllomalion 1010215-
Dee Imo 5lfemwl
on 1F out):
evicrevvinenoin lm2046„aoe55
Cltth en8YrgoArcm
P,eNF •e^s..MC9594m G.
A=
1pe e
66 11
nw
e. e a
A. 30 w 00 l]
CS, lmn u004g
e01..em00vr00
013061824,911.426$
.elm3774.334.
Mel
821 S34.0
A•
lyre•
6411
eII
B
,se,.
A 0, C err C.
401
0
Reps.P6,YA 132Bewne9Cwaul
T =
t0
a.R.51015.5001001
Polun P.m 1a 130105338 Could
1=I
1o0
3500(2. 5.1025. SO. .81001
Sme Mcocce,e,ion UWVa4mab0
)c•
32
orC.10 .eulwgerw0
1_•rrguiel
Mama. IAA keinee Rae
a•
000
aio.mn LAM 9.ebue ha
•
009
0,vaa,.P,we3een
F.
1.75
•91es
Cire4wPrecvela45e,
F.
310
7304!
Deegn NFfIYIOF Fenno. I•Ci Fi,41•YCo
Wn9n S.O.S. AF Fanner !•C: F.000.9d•f,
00.114el0 One
C.=
7650
<6 Ono
C.• 1050
Ge11aanel.3
C:•
10
Co0nn4,4 T.K.
CI' ID
0ullwentlMO
C,.
0799
Cwni=e1111034
C.= SIBS
Delum11u1 I nn At Average Gurnee tarnte Into if Dieul.t.dl'
Dineen notion of AVOrane Outflow lromthe Stan lraIr. dalnnl-
Bwn Cmneem C• 0.52
Fuson Cmneon
C= 041
inflow Pma.RVel1
033243
900
co.
IMbiPeik,.nn
Op.,• 16 43 Os
Ak...e. PoYam6. R,w
914821
Fain
cli
097.00, Per Cana. Re,
op -.e• 0.14 1
Moe FAA Yngearswap velum. •
1)144
euLk1491
Nod. FAA 581444 nor'.' Slum.' Volume • ]2,117 e06k 441
lied. FAA moor 3.87435 Velum..
9.304
31,.11
Meek am**. 453,0440alum.- 1155 aen11
22
'..
Rade
olpw
A0I•073A.
O.M.r. 1
55.3.
RSYY
_
Nwamn
arM'
OJro.
.8144
8,2.87,
m a
ae1ua11.
11v00n
tutVol..
t Weren
fee
rylny,n
n.0
m
11.0165A
r .
100!1
401
333., le
m6
excae[
IWP,1,
Donee
rev
Inc.,.0,nV,0
Aron. l'
vend
nee
rM8
le 003
ovie
c "
l 070
rLLowl
Vin
von.noo
..13., Iee1
1w10.41
o
000
095
070
Dry
o
0
163
9m o
20 001 10130
060 019 e 9
060 014 465 2SOBS
40
60
1135
060
021
105
503
0!y.
10 261 20630
065 011 563 22115
60
20
]3 11.332
017
021
109
2.329
on 759 257]9
017 511 983 RWB
00
22 11 .332
051
020
1117
]070
60 111
2798/
051 521 1211 20430
120
22 162946
161700
035
055
020
0201452
1432
4650
-5115
117 159
110 144
27 58/
330.141
0 SS00 020 1211
3 055 520 1432
0 27
2060747
120
570 1500
26956
100
IGO
96 765
000 I7M1
054
0 54
020
019
2.092
,491
110 130
160 IY
31.020
21171
0 51
0y. 0 010 1020
39.29:
200
11 1]065
051
0.19
2385
5.00)
290 1370
22.180
0 4 019 2001
90: 20
20070
10.69
a59
010
3325
4001
111
57.21746
053 019 2522
21 WI
110
20 16&10
m5]
0 10
6]01
220 01
052 V19 2230
21014
NO
60 19110
052
019
2,30
5,937
4.520
240 ova 31.441
0 52 010 2059
32.430
200
.60 19.935
052
019
2952
5620
250 017
052t 119 3151
32.005
100
SS 19 935
057
510
2.392
6.172
260 060 54.605
052 LI 19 3.302
32.005
103
Y 20/04
0 57
011
2.392
6.572
317 041 3127
057 019 3.302
33.1 10
540
51
20 019
052
039
3.029
6.942
2 40
0 4 3720
052 019
3009
32,616
140
49
20069
053
0 19
3101
1.042
,40
075 57 270
051 010
3044
34,213
360
4721.15
0 5
451
I-154
360
022 36250
052 010
4361
38107
300
41
21 472
05
010
42 270
1151
400
a 89 30259
053 019
1111
34,191
416
42
0
21574
0.5
016
4Ao9
710
400
004 39662
0.53 019
4.419
34141
010
42
21916
01
242
4.914
72235
420
044 40002
051 019
163E 14966
010
191 22.379
05
0.19
5'11
7235
450
40491
031 013 56 25 3 11 15195
440
30 21517
05
Cl!
5343
1244
450
OW 40408
250 6.13 5.330 35545
560
36 22,502
OS
010
5374
7147
500
0.58 41230
051 019 510 35734
520
36 71006
OS
5.Hb
1752
500
0 54 41230
058 019 5703 35054
520
15 2).02
05
019
00000
7101
540 0.5) 41504
359 8 19 4.101 35655
60 5
33 213292
05
510
0.211
7207
540 053 42901
051 019 6.200
35929
550
33 25.]08
0 5
0.13
0.213
7 V1
560 052 47524
0.01 0 19 0195
36.133
SBn
32 23516
0s 5
0540 5s
50 50 17 0 0 41 600
0 51 0100
36.84
MO
52 23,750
05
010
5.070
1,105
600 0.49 13319
051
010 667]
36700
420 630
00 24/03
05
0.18
3065
040 040 43]18
051
010 6.010
34.586
460
660
00
20
24243
214 39
05
014
6160
ram
65 23
0964
700 045 4]014
660 045 43027
051
050
1 2366
0
0104 2501
16.014
16.014
700
38
34.051
05
0 13
7.613
6170
200
043 44^_83
051
030 7.5]]
36.00533
700
38
34.5-5
C. 5
0 2 04 14
100
o 43 44.60)
0 51 010 7070
36.021
210
27
34004
O5
018
7.121
0 1114
740
040 45061
051 018
3,957
36.029
760
27
28241
OS
004
6.325
6119
760
D41 45022
050 0 ie
0115
XB&
762
20 28241
19.5
016
9.11?
6 en
100
D41 45 122
0 51 019
2 090
3..903
617
20 2.327
05
0.06
0.600
5516
1000
030
45037 503
051 010
2000
36911
510
25 34421
05
014
0.024
6521
00
0 3
45009
051 018
0,0417
37.011
510
25 25.601
OS
0 18
97 57
6130
0220
030
40134
051 014
0 42
1 33?
610
24 25604
05
016
9.170
6234
040
034
40011
13 51 009
04 28^_ 57.092
080
250
010
0179
060
037
46595
051 016 9817 57.095
000
21
23 2.596244
05
O 10
0.097
00307]
e
370
450 13
0.51 016 0991 17411
920
21 25196
0 5
0 le
0 411
7
0446
920
036
47,613
051 036 091-5 31130
920
21 26140
05
0 1
10111
5496
920 035
17]71
051 0 38 36130
0600
600
600
22 26232
22 26 363
22 26403
O9
05
016
010
010
I ii 340
10.504
10001
579
vYe
5.596
2 y. 960
960 •0,714
00 032 41912
11 10.169
0 051 016 CO
3004
050 010 10001
57,145
30,043
30,043
307.
II 18.519
10
11000
54%
1000 032 46,351
051 016 11201
30,153
1020
II 15 115
05
016
11419
5396
10.10 031 86331
051 0.15 11419
30.115
1010
20 26040
06
010
11418
5333
1010 031 49559
051 010 le 11851
31231
IWO
20 25051
05
018
10.651
5051
1040 0]1 10959
05t010 1129 vim
0000
20 27340
0.18
11 011
1140 011 49155
030 0 00 12034 35068
1110
20 0?266
010
12006
5011
030 49149
011 12400 31047
1140
19 21160
05
05
0.16
125]3
4041
1120 002 79539
050 0 la 12.]25 31 045
1140
19 27]71
05
018
12533
4770
160 028 19.509
0 51 018 02.0170 30010
1100
19 32215
05
010
10950
6,720
1160 029 19 707
051 014 12.910 ]5.005
1301
19 206 10
05
010
4600
1200 0.39 19.005
051 014 02150 36970
0109
10 20 612
0 17
010
13 174.•4.503
1200 036 51:100.5
0.17 018 13.075 90630
nO. na use sign,. downs (nee AI. 17178 e. iAl Y.iv 5by7 YeRlma lcu9k 0.1 •
1201. FM Men Sang Yuen. Oen43. 3544 Imo.9-Menhir theme Venom renal.
UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK V61sion 23, geleosod March 2012
00520
1➢ Cc1.10.01, 2017 Pon] 5 rt Raba.. Malice FM
DETENTION VOLUME BY THE MODIFIED FAA METHOD
(See USOCM voranu 2 Storage Chapter for description al nathod)
Project Baldddye PUO
Slain D. Proposed Condition
Inflow and Outflow Volumes vs. Rainfall Duration
60,000
50,000
40000
a 30.000
u
E
a
20.000
10,000
200 400 600 BUD
Duration (WnIlea)
1000
ssxxmlewr Vie-, ..-11efibT M.. *Y...•—aTrdnamV.a��
1.200 1400
UDFCU DETENTION BASIN VOLUME ESTIMATING WORKBOOK Ve. iQ' 2?. Rdeaue March 2012
1L - Doi -11-IZ 2QIZ WY 3n RWo.so. M•j*to cM
11!14iniu r1 PM
STAGE -DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Project: (Midi/Mgt PUB
Basin ID: Proposed Condlllen
Current i'An11lli) O,dar n Al
pecan Information !Paull
Grata. Opening
OR
Recurplar Opears.
Diemen, in !idea
Wolff in Feel
Lens (Hoye IOI Verpwll
Percenlege or Ocen Area Alter Trasn RaEk Raou[Len
Orifice Orerleiert
Web 000rlIeni
OnLe[ ENvavon (Bottom for Verttey
Poky lotion el roiitCtlpn c40iclt
Net Opening Area (after Trash Rack ReO.ctin1
OPTIONAL Ustr-Over4e Ner OpenrO Mea
Penme rn is Wen Longs
OPTIONAL' Oaer,O erle Weir Length
o•s
W=
L or H=
02 time
Al V
et Meru
12 Von
I 4.00 J
3 CC
000
'°° I3.00
I 042
0.12
100
0.60
3.00
9690
100
0.60
1.00
96.36
iW
060
100
060
95.59
9563
000
9.00
009
005
L.= 1000 1200 0.
�n
Ter Ewsal04 of Vertical Oro a Opening Too •
Conlon ENvnor or VerLEal tNifre Operero Can
r
9622
9606
ache
N
16
i1
e9 ft
so ft
95 75 N
95 59 6
Routing 1: Water flows through WQCV plate and #1 horizontal opening into#1 vertical opening. This flow plus flow from #2 horizontal
opening flows through #2 vertical opening.
Horizontal Orifices
Monica l fMfloos
LAM,
fa wow Mae.
a New Stomp.
w.5. fwwuw
Willer
Solace
EHvnlnn
II
WOCV
Plele.Rieer
Ftw
cis
Cl Moro
Weir
FP.
COT
Or Horn.
Orifice
Pow
Cry
I2 Moro
Weir
Flow
oft
A2 Noe.
Orifice
Mon
cis
Al Vent
GOAAEtOM
Capacity
oft
42 Van.
Calecbon
Capacity
cis
Tutus
Collection
Capacity
cf.
mew wants
lo wOCA. litre,
& Map aoao.
Vita.
9589
000
000
000
0.95
34 01
51.50
nos
91.30
10396
139 Al
MN/A
aNIA
MNIA
RNA
#N/A
ANA
ANA
AMA
MIA
ANA
INIA
ONA
INIA
aNIA
MN/A
MNIA
AN/A
ONA
*NIA
ON'A
AMA
*WA
ANA
MN/A
OVA
_
!
_
I
I
I
I
I
I
i
I
i
I
000
000
9.14
30.30
35.09
3585
4i6T
4372
4826
ON/A
ONA
044A
MNIA
ONA
MWA_
NN/A
AMA
IOWA
if NIA
MWA
MWA
0WA
AN:A
ONIA
ONIA
AN/A
aNIA
ON/A
ON.A
MNA
MNA
4N/A
ON/A
MN/A
MIA
RNA
MNA
AN/A
ANA
ON/A
RNA
Ma
MN/A
*NA
000
000
0.00 I
000
.... 055
fiat
1843
- 2732
5522
aNIA
4NIA
ANIA
AMA
AMA
OVA
IOWA
awA
yin
i MA
IN/A
atirA
0N%
MWA
r pNIA
ANA
#WA
*NM
MWA
NWA
MN/A
MNIA
MNA
I ANA
I AWA
OVA
of -PA
DNA
ONIA
ANA
ANIA
AN/A
MNIA
I MN/A
AN/A
000
0.00
0.00
0.00
12411
2409
34.67
3940
4998
.N;A
IiN/A
aN/A
MN/A
aNIA
ONIA
MWA
ANA
ANA
- ONA
PHA
PHA
MWA
ANA
ANIA
AWA
AN/A
ON/A
I ON/A
'WA
AMA
MIA
I MLA.
MIA
ONIA
- ANA
ONIA
XNIA
XNIA
ANIA
ONIA
(NIA
AWA
I MNIA
i AN:A
000
0.03
041
0.59
085
066
072
074
080
ON/A
NNtA
INIA
INIA
- MNIA
pNIA
I ANA
i IN'A
ANA
I RNA
I IN/A
i ONIA
I MIA
I MWA
MN
I PPP
ONIA
- ONA
4011/1
ONIA
NN/A
A+91
ONIA
- AN:A
I MNIA
I ANIA
ANA
ONIA
MWA
ANNA
ON/A
WA
j MWA
NN'A
MNIA
011
013
028
0 37
049
O4
044
045
098
I _ iOtA
aNIA
ANIA
MIA
INIA
ON/A
ONA
MN/A
ONA
AN/A
ANIA
458
ANIA
ANA
ANA
MBA
MNIA
I #WA
ON.'A
MWA
NN/A
ONIA
ONIA
ONIA
ANA
ONIA
ONIA
OVA
_ ON/A
MNIA
PAPA
OVA
MNA
MIA
MNIA
Ott
96.00
9700
000
000
0.01
0.21
98.00
95.44
95..69
99.00
091
0.37
001
0.40
100 w WSEL
002
5.42
0.02
0M
99.19
99.69
003
010
0.03
048
0.04
ON/A
094
ONIA
0.04
INIA
005
INIA
005
IWA
005
I INIA
0 C
INIA
008
I INIA
006
I INIA
000
: INIA
006
I INIA
001
I INIA
007
i IA
001
j MIA
001
i SN
0.07
i RN
PNIA
i 6NIA
_
4NaA
l MA
ON/A
ANIA
ma
MNIA
ONIA
INIA
ON/A
INIA
bN/A
INIA
INIA
/NIA
bN/A
INIA
MNIA
Mil/A
AMA
AWA
AMA
ONIA
4N/A
/OSA
pNIA
AN/A
MNA
INIA
MNIA
I IHIA
MNIA
I INIA
ANA
I INIA
MN/A
I MHM
MNIA
I IHIA
INIA
/NIA
NN'A
I /WA
MNM
I SPA
MNM
I INIA
UD-Uet -11.122012 Pond 45yr Release, Outlet
11/14/2012. 1.43 PM
STAGE -DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Project: Bsldridge PUB
Ba el ID: ProgoIed Condlllon
STAGE -DISCHARGE CURVE FOR THE OUTLET STRUCTURE
Stage (feet, elev.)
99.89
99 39
98.09
98.39
97.89
97.39
9689
96.39
9589
a
0.00
0.10
o.zo
0.30
Discharge (cfs)
0.40
050
0.60
LID -Del 4142.2012 PanO -5rr r+elaae, Ound
1 V1412012. 1 43 PM
RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
a,
!
{a
ea
&;em0e
§6+<a®a
!)
/6uk
a.
he Restrictor Plate for Circular Ve
II II II II II
2!
$
Calculation of Orifice Plow Condition
co
CO
Bottom of Plate (feet)
Lei
01
,a
CI
01
43
.2
0
/ di
! {§
i {
C-
�
:«}
§)§ 41
I cc
\\}) h
6�a; !)
!CttOc #!
B; ;
-t
of/5J $
«! °! 23
11/140012, 1:44 PM
UD-Det -11-12-2012 Pond -5yr Release, Restrictor Plate
STAGE -DISCHARGE SUING OF THE OUTLET CULVERT (INLET vi. OUTLET CONTROL WITH TAILWATER EFFECTS)
Project. 04 dridge RUC
Buhr ID Pmpot.d Candlllon
wive: *heel Canon wart..* Se. town hronm Raroe
•
potion Information IlnoulY
Gould. LAM Et•rt NM n Oct*.
Gab' Ca.M''rier. EM•e f rye 1�.lan W 4s+n MI
>�
Bo. Gwen. Bern* m old mnel n Feel
Box CJnrl. Banal Width15Pvrl areal
Box 0.*oth rryr Edge lyc. Inewe from p/h+.o 6*I
NaOer tl E.xM
Wel EIIOIb+ NCube, lawl
OJ0I E140.5105•1 GMiI 'Iran
0.....e01.0%.0 n Feel
ahavos no-pm.
04,41 LouCoe0cen
E6 LW GYncvn
peulon Infanlalion IwlguliIed�
Ewu.e Ina. corl.urc
FrbM Lrcs GMkM
9.n or mss Ceencsau
c*Pce !We; Oxman Cwawti
M'riv^ Emyy Co c., Cwnclers
Calpllflona on
LDDtl -I I.13.]013 hrtl Sir Reoar CJwn
L
D= e
Saws En1.NrPeder
Ikgelflrxl=
1064141M144'1' n
15 I n...r. 40 Oil HAMMY
M=
a.=
ln_
'0=
011,0
.I.w
41.0.1311
000
elev.
A et•
Woo.' alelec.
C.w.o..
...r ...
IIt.. Inked I
TaBe.ta-
aurt...
EMOillen
n
• tr ee:..'
Culvert
NIM•Cdnte0
Hawaii
eh
(00001
Culver'
ovule.,'*
Flo -e41
ela
I^0 00
Fbuealt
we Conan
.. ..
......_
ids. bowel
Wr.0,.
eu*e.n
fl.w0.
ef.
(ou0M)
Mw
Ee•a11tO
timed
I.mM]
11.49
OFe
W W
Fee
or at
I.!!
MW
eft
Nu
0.e
90.9
La]
wee
OM
We
0n
Pt,"
04I
000
4WA
0w
e.M
*WA
WUA
040
adA
0e0
IWA
0B0
WA
0,00
MA
b.00
MIA
µ0
WA
000
MIA
000
with
0.00
M'A
0m
FWA
000
M/A
0.00
1WA
010
EW A
0.00
FWA
00)
IWA
000
!WA
0.00
MA
0.0
FWA
000
FWA
0.00
0 -WA
000
!WA
d,p
IOWA
0.00
IVA
010
FWA
I 0
0WA
OAP
MA
e.0
IWA
1200
FWA
0.00
r0A
0W
OVA
_
o.W
IN/A
11:1443012 145 PIA
STAGE-UISC BARGE SONG OF THE OUTLET CULVERT {INLET vs. OUTLET CONTROL WITH TNLWATER EFFECTS
Prehct. 9aleeeQe Pun
Ilaen ID. PMPOtpe Condlthen
STAGE -DISCHARGE CURVE FOR THE FINAL OUTLET PIPE CULVERT
9989
99.39
98.89 -
98.39
Stage (feet, elev.)
97.89
97.39
9689
96-39
9589 1
0.00
10 00 70 00 30 00 40 00 5000
Discharge (cfs)
P.P.M3CmTrn{P'V t. W-0 F.vm e 3, Caved 4'23,Al2. 1133/.M
STAGE -DISCHARGE SIZING OF THE SPILLWAY
Project: ealdridga Pun
Basin ID: Proposed Condition
Phalan Information Ilnoutl.
BoLlom Length of Weir
Angle of Side Slope Weir
Elev. for Weir Crest
Coef. for Rectangular Welr
Coef. for Trapezoidal Weir
Calculation of Solllwav Cnoaclty loutollll:
1=
Angle
EL. Crest =
C,=
C, _
15.00
75.96
98.69
3.00
3.00
feet
degrees
feet
Water
Surface
Elevation
ft
Rect.
Weir
Flowrale
cls
Triangle
Weir
Few/rate
ois
Thiel
Spillway
Release
Cls
Nom' lls\..
Total
Pond
Release
cfs
.,,
95.89
0.00
0.00
000
0.00
96.00
0.00
0.00
0.00
0.00
97.00
0.00
0.00
0.00
0.00
96.00
0.00
0.00
0.00
0.00
99.44
0.00
0.00
0.00
0.00
99.69
0.00
0.00
000
0.00
99.00
7.77
0.64
8.41
6.41
99.19
15.91
2.12
18.03
18.03
99.69
45.00
12.00
57.00
5700
MIA
MIA
MN/A
"NIA
MNfA
MN/A
MNIA
MN/A
IIIV/A
MIA
PN/A
MN#A
MN/A
MIA
MWA
/4N/A
#NIA
MNIA
#N/A
#WA
MNIA
*NIA
MNIA
MN/A
"NIA
#NIA
MNIA
MWA
MN/A
MN/A
4N/A
MN/A
t0N/A
MN/A
MN/A
#NfA
ONI/A
MNIA
MN/A
MN/A
#61/A
4N/A
MNIA
MNIA
MN/A
#N/A
MN/A
MNIA
MNIA
MNIA
fiNI/A
MN/A
'NIA
MN/A
MN/A
#N/A
4N/A
MN/A
MNIA
MNIA
MNIA
#NIA
MN/A
MNIA
MNIA
MN/A
MN/A
MN/A
tON/A
MN/A
#N1A
MNIA
MN/A
MIA
MN/A
MA
#IA
#N/A
MA
MIA
MN/A
#IA
MN/A
MN/A
MWA
MN/A
MIA
ANA
MNIA
'NIA
#N/A
MIA
MIA
MN/A
1151/A
#N/A
#NIA
MNIA
MNIA
#NIA
#N/A
MN/A
MIA
MNIA
MNIA
#N/A
MN/A
MNIA
MN/A
OVA
#N/A
MN/A
451/A
MNIA
MNIA
#WA
MNfA
#NIA
MNIA
#NfA
#N/A
#NfA
#NfA
#N/A
MN/A
#N/A
MN/A
MIA
#NIA
#NIA
MN/A
MNfA
MN/A
MN/A
4N/A
MIA
MNIA
#NfA
MIA
trhi/A
#N/A
MNIA
MIA
414/A
MNIA
MN/A
MIA
MNIA
#NIA
#IA
#N/A
MN/A
OVA
#NfA
MIA
MN/A
MN/A
MNIA
#NfA
451/A
#NIA
#N/A
MNIA
4N/A
4N/A
MNIA
MWA
MNIA
4N/A
#NIA
OVA
MN/A
MN/A
MNfA
MNIA
LID-Det -11-12-2012 Pond -5yr Release, Spillway 11/14/2012, 1:46 PM
STAGE -DISCHARGE SIZING OF THE SPILLWAY
Project B&dddpn PUD
Basin ID: Proposed Condition
UD-Det -11-12-2012 Pond -5yr Release, Spillway 11/14/2012. 1:46 PM
Water Quality Control Volume
STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
old
ES
13
ob
g
Al
h o G
8
2
2
I' I I I I I I H I
.
<..aa.
as s sss a aaassasasasssss:E',8₹₹'.�.₹ "�d_E3E, I
I
I I I
I II
I I
II
I I
d����a6. �.�aoaDeve�85g elgi iiiI::
1. 1. I
IIII
°ao oeo "s �e elz:z zz 3:zzx:s.2�Szz'zi
„ � o I I I I
g$Is� Is�eIR I. 1
a o 000c000 oa000aoeee e' 3;22.32.333��₹{32 �,3�
8
882 28228888V 28288"
a
a*aaa�aPWWWWWPa
8
a
8
STAGE -DISCHARGE SING OF THE WATER DUALITY CAPTURE VOLUME (W OCV) 0
0
2
4
1
I'l
APPENDIX II
Table RO-3 Recommended Percentage Imperviousness Values, USDCM.
Table 5-1 Weld County Design Storm Rainfall Comparison
FIRM (Flood Insurance Rate Map) Community Panel number 080266-0850-C (Panel 850 of
1075); Map Revised September 28, 1982.
DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF
Table RO.3—Recommended Percentage Imperviousness Values
Land Use or
Surface Characteristics
Percentage
Imperviousness
Business:
Commercial areas
95
Neighborhood areas
85
Residential:
Singfefamily
Multi -unit (detached)
60
Multi -unit (attached)
75
Half -acre lot or larger
Apartments
80
Industrial:
Light areas
80
Heavy areas
90
Parks, cemeteries
5
Playgrounds
10
Schools
50
Railroad yard areas
15
Undeveloped Areas:
Historic flow analysis
_ 2
Greenbelts, agricultural
2
Off -site flow analysis
(when land use not defined)
_
45
Streets:
Paved
100
Gravel (packed)
40
Drive and walks
90
Roofs
90
Lawns, sandy soil
0
Lawns, clayey soil
0
See Figures RO-3 through RO-5 for percentage imperviousness.
CA = ICA + (1.3 U3 1.4412 +1.135i 0.12) for CA ≥ 0, otherwise CA 0 (RO-6)
CCD —ICc01-(0.858i)--0.786i2+0.7741+0.04) (RO-7)
Ca = (CA -t- c`cD )/2
0812006
Urban Drainage and Flood Control District
RO-9
1-25 &Tri-Town4
Depth (in)
0o
a1
O
m
m
r-i
oo
tD
ri
o
r i
n
m
ni
oo
a
ni
1-25 &Tri-Town4
Depth (in)
tD
t --r
,i
p
ID
ri
ri
Cr,
ri
2.32
N
ID
N
m
O
M
1-25 &Tri-Town4
Depth (in)
O
u1
O
Cil
Nici
to
M
ni
N
oo
Ni
In
N
M
0
N
M
New Raymer3
Depth (in)
t0
of
o
1.35
<7
tf1
rl
O
03
ri
to
ri
N
2.55
New Raymer3
Depth (in)
in
O
ri
to
J1
r1
N
N
ti
O
ri
N
to
R
N
N
0o
N
New Raymer3
Depth (in)
ct
v
ri
Ln
m
el
2.25
in
N
N
in
o
fn
N
.
M
Greeley
Depth (in)
.ct
O
.--1
Q1
lit
r-1
a
N
ri
ri
In
N
oo
N
N
Greeley
Depth (in)
tD
ri
el
o
tD
el
ri
i71
ri
on
IC
N
Q1
01
N
Greeley
Depth (in)
0o
M
ri
O
00
ri
N
N
N
03
V1
N
2.94
3.42
Longmont'
Depth (in)
N
O
ri
tD
c7
ri
1.75
2.07
2.42
N
N
Ni
Longmont 1
Depth (in)
O
N
H
a
tD
ri
O
O
Ni
2.37
2.74
00
O
M
Longmont'
Depth (in)
tD
to
r -1
in
O
N
2.47
LI1
on
Ni
to
M
M
N
N
M
1 -Hour Storm
Frequency
2 -year (50% chance)
5 -year (20% chance)
10 -year (10% chance)
25 -year (4% chance)
50 -year (2% chance)
100 -year (1% chance)
2 -Hour Storm
Frequency
2 -year (50% chance)
5 -year (20% chance)
10 -year (10% chance)
25 -year (4% chance)
50 -year (2% chance)
100 -year (1% chance)
6 -Hour Storm
Frequency
2 -year (50% chance)
5-year(20% chance)
10 -year (10% chance)
25 -year (4% chance)
50 -year (2% chance)
100 -year (1% chance)
`a
.0
O •
"
E
E
O O
a�
m
W N
m0
g E5.
s
C ' c
re m
o " e c
La G R m
EEEE
0 0 0 0
u
11 U kl is
N M V
APPENDIX III
(Stuffer Envelope)
1991 Historic Drainage Plan by Nelson Engineers
Existing Conditions, Demolition and Removal Plan
(for historic conditions and historic drainage data)
Drainage Plan
Erosion/ Sediment Control and Water Quality Plan
Details (Drainage, Erosion Control and Water Quality)
B 1304 SEC 02156522 07/17/91 13:41 < 0.0D 2/002
F 1E2" I1LY AN1, FCUERSTEIN CLE51< o RECOROi:R WELD CO, CO
'
5SHOULDER
O
3:80 `557
0
a,
�N
0
o �
o
cr>
50
SCALE /"= 50
rocs or
A rHALT
MED/4, y
EDCE OFOR/IgN6 LANE
O{yL/NEST N'r. 4//9 58/.065/
.E
N
•Ln O
O o
0
-c
N
C
ACCEL L_NE
EDGE O F
'se
N. LINE NEI
'04 24 F
336
MEDIAN
/OO' AS.PHAL)r TAPER
DR/V/NG LANE
DR/V/NG LANE
Ex/C -WC
BUI L 1/NG
5400 5r -
EASEMENT
\ AC6)j3519 W. 260.0 \
�� N.N.PROPOPf QAD IN FUTURE Fl N.�'�3
B4LDRIDGE Rl RDSON PUD. �oR
O> I
06
NE COR SEC B, ,r SHOULDER
TON Re8w
S
ST VRA/N SANITATION
DISTRICT SEWERLINE
A9'F7CE 8
8" DISCH4RGE PIPE
4890 SEE DETAIL 77-19 SHEET
9/
92
GATE TO BE REMOVED BY
CITY OF LONGMOVT.
m94
95
W96
W
J 97
W
96
P7JSSIAN
OIL/VE TREES
99 f 90LF16"CMP
W /FLARED
900END SECTIONS
O/
2/'
7?
t
15'UTY
ESM'T
3'
SECT/ON C -C
SERAIL CONSTHUG77OW
SCALE I" _ /O, HORZ 8 VERT.
39'
EL, 93
NHS DRAWING IS THE PROPERTY CF
SUBMITTAL NELSON ENGINEERS A C is NOT TO BE
REPRODUCED, WOWED OW LIMO FOR
DATE' ANT OTHER PROSCT DR EXTENSION
OF Try PROJECT EXCEPT VT EXPRESS
WRITTEN CONSEWT OF Wisp, FNIaiFFRS
SECTION e -S
_DETEN_TION POND
SCALE /" _ 1O' h'ORZ 8 VERT.
PROJECT NO 0/4
DATE MAR _1991
SCALE/"_ 50'
_ 9'
3 E4.96
1l/
DRAWN AFL/
CHECKED
APPROVED
LCN
LCN
m
to
I
4 3
A4
PLAN
BOTTOM OF
DETENTION POND
EL. 93.0 }
y:
ORIFICE DETAIL
SCALE; I(2" •E-0"
SET TOP OF BOX TO MAX
STORAGE RFO'D.
EL. 95.7
SFCTION A -A
LANDSCAPING SCHEDULE
KEY OTY. BOTANICAL NAIVE COM C V NAIVE SIZE
1htES
RC 229 ELAEAGM✓S RUSSIAN OLIVE 5 GAL -3F7; H7
SHRUBS
✓T a JUNIPERUS SABINA "TAM" TAMMY ✓IAVIPER 5 GAL.
L AAUSC,4FYAG NOTES
I PROPER PLANTING PRACTICES ACCEPILD BY THE COLORADO NURSERYh,EiVS ASSO TA a ':
SHOULD BE FOLLOWED IN THE /NSTALLATIONOFALL PL40Vr,MATERIAL.
2 PLANTING MIX AND SOIL PREPARA77CW FOR SHR113 BEDS, AND F'LANTNG IYT5; TO St -thr 'OSED.
OF EQUAL PARTS OF PEAT MOSS; f7NE GRACED AMC WELL PC; ILD MAN'/RE, AM) FA2,: „':G SOIL
3 ALL LAAOSCAPED AREAS ARE TO BE SEEDED WITH NATIVE GRASSES, A REC_>/tLMENIX7)
MIXTIJRE IS: 54W171BRW£2014 TALL WI -SEAT 30%GRESILL)WHF.!T20PS NTERIVEDIATF
WHEAT 20%, AM) PERENNIAL RYE 10%, APPLICATION RATE SHOULD B -10a LIVE SEED PER ACRE.
4. DRIVES, PARKING AM) DISPLAY AREAS TO BE GRAVELED TO MINIMIZE DUST AM) MID
5 TANKS ONT HE PROPERTY. TREE WATERINGPROVIDED WILL AND STORAGE
WATER FOR LANDSCAPING WILL SE BE BY USE OF WATER TRUCK AND
HOSE ON A WEEKLY BASIS, GRASSED AREAS WILL BE SPRINKLED WITH HOSES.
EXISTING GROUND
NELSON ENGINEERS
520 GREELEY NATIONAL PLAZA
GREELEY, COLORADO 80631
S-315
SALDRIDGE PUG
WELD COUNTY, COLORADO
i
$' PVC
DISCHARGE
PIPE
EXH/B/T'H"
DRAINAGE AND tex
LANDSCAPING PLAN z
4w«
4 it L
Fence Line
LEGEND
c,
\2 DEMO-EXISTAwg M
ao
bongnont\Ci
IL
V
i
Y
O
L
a.
Dlst\2608-04-12 Mtn View Fir
to
Z'\M-CUents\Mountain View Fi
se RCP Culvert
Inv. -03.34
30
ID- =
lie
— w— =
- T =
T• _
•D =
G =
G• _
Gas Line —
Marker & Valve I
•
1
• 15' UTILITY EASEMENT PER THE
PLAT OF BALDRIDGE P.U.D.,
FIRST FILING
.r
I '
-t
\r
I
4,9sir.. _
Concrete'Si:
Pan \ `hft
Storm S.,
Sewer Inlet `•%
Grate -09.10 titit
NW Inv. -03.45
SE Inv. -03.45
Wood ljlvacy
Fend,
30' Drainage & Utility
Easement per the Plat of Vista
Commercial Center, Filing 1
GRAPHIC SCALE
0 15 30
I I I
1 Inch = 90 ft.
15' Drainage 8c Utility
Easement per the Plat
of Vista Commercial
Center, Filing 1
Light Pole
Power Pole
Power Pole Support Wires
Water Meter
Water Line Locate
Water Valve
Waterline (per underground locates)
Sanitary Sewer Manhole
Telephone Line (per underground locates)
Telephone Line Locate
Delineator Post
Deciduous Tree
Shrub / Bush
Gas L'ne Locate
54" RCP Culvert
Below, Concrete
Pan Above
60
;SI
Storm
Sewer Inlet
Grate -10.30
NW Inv. -04.55
SE Inv. -04.65
54• RCP Culvert
Below, Concrete
Pan Above x\
Storm
Sewer Inlet
Grote=10.05
O
OA NW Inv.=04.17
J SE Inv. -04.14
4 (7 7.
..- 0-,'Prit0
9
• • s
4
\
2
s
.
.
.\
N
J • p\
`•
Y
OUTLOT A,
VISTA COMMERCIAL CENTER,
FILING I
Utility Easement)
(Drainage &
San. Sewer MH
1 Rim -12.35
al
se RCP
ASSUMED
AUGNMENTJ
— Water Line —�
f
r
1
a
LEGEND
ASSUMED ALIGNMENT
Limits Of Gravel
co
x San. Sewer MH
t'' Rim -11.08
W. Inv.=00.03
Inv.Zg9-9/
COLORADO STATE HIGHWAY 119
Fence Line
Elect. Outlet &
8• Dia. Vault
'SUBJECT PROPERTY':
BALDRIDGE P.U.D., FIRST FILING \•\
196,524.31 S.F. / 4.511 ACRES \
OUTLOT B, VISTA COMMERCIAL
CENTER, FILING I
(Drainage & Utility Easement)
/
Chain Link - GRAVEL DRIVING
Fence
OA
EOA.
and Hydrant &
(2) H2O Valves
Concrete
O
6,
i
H2O Meter &
H2O Line Marker
--4)-sea,
Sewer
Markers
Fence
Line
- 5'
e. Ped
San. Sewer MH &
(2) Marker Posts
Rim=92.33
S. Inv.=84.67
E. Inv.=84.4.3
• Ifolietrerse---- Elect. Ped.
8' PVC Culvert N es
W. Inv.=95.63
E. Inv.=94.99
• PVC Curvet
W. Inv. -95.89
E. Inv. -95.90
15' UTIUTY EASEMENT PER THE
PLAT OF BALDRIDGE P.U.D.,
FIRST FIUNG_
RIp—Rap
60'
/
--1
C.3
Rip Rap
A
15" CMP Culvert Inv =02.73
ASSUMED ALIGNMENT
ISTA VIEW DRIVE �o
LOCAL EMPLOYMENT/REGIONAL COMMERCIAL ROAD
EOA
18'X12" Squash Pipe Culvert
_ arw ~ - �/ W. Inv. -06.86; E. Inv. -06.20
Runoff Discharges — Summary
Historic Site Breakdown
Design Point
Sub —basin
Area
(acres)
C 100
0100
(C.F.S.)
h I
H I
4.00 I
0.48 I
12.67
Developed Site Breakdown
Area
FL Ditch
Top Bank Ditch
San. Sewer MH
Rim=05.44
W. Inv.=98.45
NE Inv.=98.42
EXISTING AREAS WITHIN BASIN
J
\4905
Ditch FL=02.86
PROPOSED CONDITION
QUANTITY
%
C100
GRAVEL
138,547.62 S.F.
3.1806 A
79
.40
BUILDING
5,430.04 S.F.
0.1247 A
3
.90
CONCRETE
1,586.11 S.F.
0.0364A
1
1.00
TURF
28,822.28 S.F.
0.6617 A
17
.00
I
I
II
- --�
-t
I
I
R -0--W
yJ
O
Q
O
>-
0
Q
W
a
0
Qrs
•D
5126
as— ----
(-A
C 100
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
BASIN BOUNDARY
SUBBASIN BOUNDARY
A = BASIN DESIGNATION
B = AREA IN ACRES
C = COMPOSITE RUNOFF
COEFFICIENTS
Ci00=(100 YR. EVENT)
D = DESIGN POINT DESIGNATION
PROPOSED STORM SEWER
FLOW ARROW
EXISTING CONDITIONS, DEMOLITION AND REMOVAL PLAN GENERAL
NOTES:
See Sheet 3 for Master Utility Plan and Construction Notes.
2. See Sheet 4 for Master Improvements Plan and Construction Notes.
EXISTING CONDITIONS, DEMOLITION AND REMOVAL PLAN
CONSTRUCTION NOTES:
0 Existing;
• 6" thick concrete pad (approximately 406 SF)
Remove and haul:
• 6" thick concrete pad (approximately 406 SF; document thickness prior to
removal)
Existing'
O
O
O
O
O
0
0
• 6" thick concrete pad (approximately 360 SF)
• Fuel tank
Remove and haul:
• 6" thick concrete pad (approximately 360 SF; document thickness prior to
removal)
Salvage and relocate or remove and haul:
• Fuel tank (relocate or haul as directed by owner)
Existing:
• 4" thick concrete sidewalk (approximately 821 SF)
Remove and haul:
6" thick concrete remove and haul (821 SF)
4' thick concrete sidewalk (approximately 821 SF; document thickness prior to
removal)
Existing:
• Gravel driving surface (approximately 15,726 SF)
Remove and haul:
• Remove and haul (15,726 SF)
Existing:
• Chain Link Fence
Remove and salvage:
Remove approximately 200 LF of chain link fence; salvage for reuse
Existing:
• Mail Box
Remove and relocate:
• Remove and relocate mail box to a location directed by owner
Existing:
• Chain Link Fence
Remove and salvage:
• Remove approximately 53 LF of chain link fence; salvage for reuse, See
Master Improvements Plan for exact location.
Eaistine
electric service line
lot light pole I1)
outlet box
to REMAIN:
electric service line to remain, protect in place, see Master Utility Plan.
hat light pole (1)
outlet box
Existing:
Timber landscape ties (approximately 247 LF! 2 ties high; doctanent prior to
removal)
Remove and haul:
• Timber landscape tics (approximately 247 LF 12 ties high)
H: Listing:
Russian olive trees (approximately 11).
Remove and haul:
• Russian olive trees (approximately I I).
r
L7
Il\dwg\9-DRAINAGE.D
U
C
0
O
E
C
O
O
L_
+'
N
L
FA
o_
o,
t
L
d
PO
1
IA
F7
1-'
O
L
a-
v
L
S
O
1
G
f
Cu
of Dist \2608-04-
c.
L
L
3
W
C
CS
C
0
O
S
i
vI
L
w
7
NJ
i
•
\
L
-L_
491p_
15' UTILITY EASEMENT PER THE
PLAT OF BALDRIDGE P.U.D.,
/ FIRST FILING
\\•
COLORADO
STATE IIIGJIw4 Y N
p• 119
\
�2p
0 \
'
4 \
...••••••
�. \• •
Ote
o
1,3
a>
,• 1W
•
1
,.
\
..
'I
VISTA COMMERCIAL CENTER`, NF,,\
OUTLOT A
FILING I
(DRAINAGE & UTILITY EASEMENT,"
LOT 1, BLOCK 3,
VISTA COMMERCIAL CENTER,
FILING I
,1
r I
I.
241
•
-----`-----_ ---� J
\
I
0
•
OD
U
grarinniliii
la22 a
EQ
EEO
4900—._
TYPE M. BURRED RIPRAP
SIZE 8' X 16'
SEE DETAIL SLEET
TYPE M, BURRIED RIPRAP
SIZE 8' X 22'
SEE DETAIL SHEET
35 UTILITY AND DRAINAGE
EASEMENT
bEvELOPDIO
PATH
10' UTILITY AND DRAINAGE
EASEMENT
UTILITY AND ACCESS
EASEMENT
FUTURE
CONCRETE
PAVEMENT
(FOR REFERENCE ONLY)
- - -
A
I
GA
cc
15' UTILITY, DRAINAGE
ANA SIGNAGE EASEMENT
alinlikaarar
_Al 000 •--
I
DEVELOPED FLOW
PATH
LOT 1
88,719.9 S.F.
2.04 AC
FUTURE
-ADDITION
2,100 SF.
4905
I
4906
to
12
a
a
4897 /
TOP 99.69
100 YEAR WATER
SURFACE ELEVATION
= 4898.44
EMENT
4904
TYP
SIZE
SEE
M,BURRIED RIPRAP
8' X 18'
ETAIL SHEET
I
4903
N FUTURE
8
SPACES
15' UTILITY EASEMENT PER THE
PLAT OF BALDRIDGE P.U.D.
FUTURE FIRST FILING
SPACES • " - ----
0,902
t1
a)
99
an aik.
■
■
■
■
EX. 30" RCP
'1
60' R -0-W
Aw
r
C
Runoff Discharges -- Summary
Historic Site Breakdown
Design Point
Sub —basin
Area
(acres)
C 100
0100
(C.F.S.)
h I
H
l
4.00
I
0.48
I
I
12.67
Developed Site Breakdown
IIII�� \q„`11
N
11111 0)
k' '\ 1STJ
J
VISTA VIEW DRIVE
i
CITY OF LONGMONT
1
Q
111
LL\
---4905--r.. -..
A
4891
EXISTING RIPRAP
TO REMAIN
15 WEIR AT ELEVATION 4898.69
SEE EMERGENCY OVERFLOW WEIR DETAIL
ON DETAIL SHEET
48g3
TYPE M, BURRIED RIPRAP
SIZE = 15' X 23'
SEE DETAIL SHEET
4895
4900
`4905
DRAINAGE PLAN
11 II FIRST FILING, FIRST REPLAT
inm
30
.4906
4 05
06
GRAPHIC SCALE
0 15 30
I inch = 30 It.
LEGEND
05
eo
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
••••••u• BASIN BOUNDARY
SUBBASIN BOUNDARY
A = BASIN DESIGNATION
B = AREA IN ACRES
C = COMPOSITE RUNOFF
COEFFICIENTS
0i00 =(100 YR. EVENT)
0 = DESIGN POINT DESIGNATION
PROPOSED STORM SEWER
cz-zwzrirvirnnr=na EXISTING STORM SEWER
FLOW ARROW
RIPRAP & SIZE
PROJECT N0.
2608-04-12
prior to any eunstructIon on this site.
N
0-EROS-SEDI-CONTROL-WR.DWG
Longnont\Civ0.\dwg\
e PU➢ Flrst Filin
L
-o
c
+•
0
L
C-
e,
L
3
0
L
q.,
f
N
CO
0
Cu
rU
G7
O
O
L
CL
al
L
Li
3
IL
J
C
C
0
O
el
C
N
6
CU
rU
0
CO
CU
r`
0
U
a,
,a
L._
1 1ti ' —
ti L _.
•
N,,
ti
GRAPHIC SCALE
0 15
I I
I Inch — 90 ft.
4971
4970— — -- -- —
4971
4970
1
4g70
30 e0
I I
LEGEND
EXISTING 1' CONTOUR
EXISTING 5' CONTOUR
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
SF SILT FENCE
Rb = POWER POLE
4 = POWER POLE SUPPORT WIRES
w
S
— s-
- r•
e
SP
`'J r
1
lie SI WI
7
II
1
\"s
15' UTILITY EASEMENT PER THE
PLAT OF BALORIDGE P.U.D.,
-
N'I\
= WATER METER
= WATER VALVE
= WATERLINE (PER UNDERGROUND LOCATES)
= SANITARY SEWER MANHOLE
= SAN. SEWER LINE (PER UNDERGROUND LOCATES)
= TELEPHONE LINE (PER UNDERGROUND LOCATES)
= DECIDUOUS TREE
✓ CONIFEROUS TREE
= SHRUB
= LAWN SPRINKLER
WATTLES
VEHICLE TRACKING CONTROL PAD
FLOW DIRECTION
FIRST FILING
LuLoRADO STATE HIGH
WA y NO. 119
taisaH-vt-wilifiliiilii_kittinorintararararitraratit • is ma in
,
L
<P� \
O], \\
CE
A
041
,
.T r
�`( y
v l v0 4 C�:'
,
`
N
\
• \
N
i \ f •\ .
OUTLOT A,
V9
.5
N
•
.`
` .N
•
• \
• • •\
• •I
V .
o,
er
♦.'• •
.1
/
VISTA COMMERCIAL CENTER; ",
FILING I -
(DRAINAGE & UTILITY EASEMENT)' '.J 1
l (
• r
LOT 1, BLOCK 3,
VISTA COMMERCIAL CENTER,
FILING I
.•
•;r
I
V
• Rs
\
N
NN
N
V
03
LOT 2
107,805.3 S.F.
2.47 AC
35' UTILITY AND DRAINAGE
EASEMENT
4
4900 -
10' UTILITY AND DRAINAGE
EASEMENT
5
UTILITY AND ACCESS
EASEMENT
FU TURE
CONCRETE
PAVEMENT
(FOR REFERENCE ONLY)
\
at —
"
1
4910
Seeding Mix and Rate
GRAVEL
11
11
r
TOP 99.69
LOT 1 W I
88,719.0
W1 2.oa Ac � �� �• rIA
EMENT
a
• I}i. i, a CONCRETE
PAaVEMENT --__
■
FUTURE
ADDITION
2,100 SF.
4906
12'
CONCRETE
PAVEMENT
4904
1
4903
15' UTILITY EASEMENT PER THE
PLAT OF 8ALDRIDGE P.U.D.
FIRST FILING
!If
■■■nommoif:fifao■mo snood'
i W1
4906
cro
COMMON NAME
RECOMMENDED VARIETIES
% IN MIX
SEEDING RATE
()RYLAND
IRRIGATED
Western whealgrass
Arnha, Barton, Rosana
20 to 45
5.0
16.0
Sideoats grama
Vaughn, Butte, Niner, El Reno. Haskell
20 to 40
4.5
9.0
Blue grain
Hachital, Lovington
lO to 25
5
30
Green Needlegrass
Up to 30
5.0
10.0
Needleandthread
Up to 15
7.5
15.0
Switchgrass
Grenville, Nebraska 28, Blackwell,
Pathfinder
Up to 20
2.5
45
Big bluestem
Kew
Up to Ill
5.5
11.0
Little bluestem
Pastura, Cinunarron
Up to 10
3.5
7.0
Buffalegrass
Texoka, Sharps Improved
Up to 10
Bur: LO
Floret: 3.0
Bur: 16.5
Floret: 6.0
Yellow lndiangrass
Llano, Holt, Cheyenne. Oto
Up to 10
5.0
!MU
Note: The seeding rates are listed in Pounds per Pure Live Seed (PLS) per acre, and not n bulk pounds
-s
VISTA VIEW DRIVE
-At-
CITY OF LONGMONT
l
0
co
t `?+Ka -nor
0
- - - - 4905
Mulching Notes
All planted areas should be mulched preferably immediately following planting, but in no case
later than 14 days from planting. Mulch conserves water and reduces erosion. The most common
most common type of mulch used is hay or grass that is crimped into the soil to hold it. However,
crimping may not be practical on slopes steeper than 3:1. The following guidelines should be
followed with mulching:
I, Only weed -fire and seed -free straw mulch should be used (grass hay often contains
weedy exotic species). Mulch should be applied at 2 tons/nero and adequately secured by
crimping tackifier, netting, or blankets.
2. Crimping is appropriate on slopes of 3:1 or flatter and mast be done so as w Luck
mulch fibers into the soil 3 to inches deep.
3. Tackifier or netting and blankets anchored with staples should be used on slopes
steeper than 3.1.
4- Hydraulic mulching may also he used on steep slopes or where access is limited, Wood
cellulose fibers mixed with water at 2,000 to 2,500 pounds/acre and organic tackificr at
100 pounds per acre should be applied with a hydraulic muleher.
5. At least 70 percent (%) of the mulch by wight shall he 10 inches or more in length.
6. The appropriate use of fabric blankets under trees and shrubs is suggested.
z
EX. 30_ RCP
60' R —O —W
a
r
I
I
I jr
\ti\)III\ 1,14i Ilk\
4- At all times during construction, the Developer shall be responsible fur
preventing and controlling on -site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall
also he responsible for installing and maintaining all erosion control facilities
shown herein.
5. Pre -disturbance vegetation shall be protected and retained wherever possible.
Removal or disturbance of existing vegetation shall be limited to the greats)
required for immediate construction operations, and for the shortest practical
period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility
installations, stockpiling, filling, etc.) shall be kept in a roughened condition by
ripping or disking along land contours until mulch, vegetation, or otter permanent
erosion control BMPs arc installed. No soils in areas outside project street rights -
of -way shall remain exposed by land disturbing activity for more than thirty (30)
days before required temporary or permanent erosion control (eg. seed/mulch,
4897 landscaping, etc.) is installed.
7. In order to minimize erosion potential, at! temporary (structural) erosion
control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each
significant storm event and repaired or reconstructed as necessary in order
to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas
are sufficiently stabilized as determined by the erosion control inspector.
c. Be removed after the site has been sufficiently stabilized as determined
by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be
responsible for the clean up and removal of all sediment and debris from all
drainage infrastntentre and other public facilities.
9. The contractor shall clean up any inadvertent deposited material immediately
and make sure streets arc free of ail materials by the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be
removed and disposed of in a manner and location so as not to cause their release
into any waters of the United States.
I I. No soil stockpile shall exceed tun (to) feet in height. All soil stockpiles shall
be protected from sediment transport by surface roughening, watering, and
perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be
seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and
storm sewer lines will be cleaned upon completion of the project and before
turning the maintenance over to the Homeowners Association (f1OA).
13. County Ordinance and Colorado Discharge Permit System (CDPS) requirements
make it unlawful to discharge or allow the discharge of any pollutant or
contaminated water from construction sites. Pollutants include, but are not limited
to discarded building materials, cuner0 c truck washout, chemicals, oil and gas
products, litter, and sanitary waste. The developer shall at all times take whatever
measures arc necessary to assure the proper containment and disposal of
pollutants on the site in accordance with any and all applicable local, state, and
federal regulations.
14. Adesignated area shall he provided on site fur concrete truck chute washout,
The area shall be constructed so as to contain washout material and located at
least fifty (50) feet away from any waterway during construction. Upon
completion of construction activities the concrete washout material will be
removed and properly disposed of prior to the area being restored.
15. To ensure that sediment does not move off of individual lots one or more of
the following sedimentlerosion control BMPs shall be installed and maintained
until the lots arc sufficiently stabilized, as determined by the erosion control
inspector,
a. Below all gutter downspouts.
b. Out to drainage swales.
e. Along lot perimeter.
d. Other locations, if needed.
16. Conditions in the field may warrant erosion control measures in addition to
what is shown on these plans. The Developer shall implement whatever measures
arc determined necessary, as directed by the County.
17. A vehicle tracking control pad shall be installed when needed for construction
4900 equipment, including but not limited to personal vehicles exiting existing
roadways. No earthen materials, i.e. stone, dirt, etc. shall he placed in the curb &
gutter or roadway as a ramp to access temporary stockpiles, staging areas,
construction materials, concrete washout areas, and/or building sites.
Site Preparation For Seeding and Mulching Notes
1. All areas to be planted should have at least 6 inches of "topsoil" suitable to support plant
growth (Don Godl and Associates 1884). Native topsoil should be stripped and saved for
this purpose whenever a site is graded.
2. The upper 3 inches of the soils in areas to be seeded should not be heavily compacted
and should be in a friable condition. An 85% standard proctor density is acceptable.
3. When necessary. soil amendments should be added to correct topsoil deficiencies (e.g.,
soil texture, pH or percent organic matter). (If topsoil and native seed mixes are used,
fertilizer is often not needed.)
4- Fertilizer should be used it specified by a soil analysis. Slow -release type fertilizers
should be used to reduce weed growth and protect water quality. Fertilizer should be
worked into soil during seedbed preparation.
5. Before revegetation work Is started, an inventory of vegetation should be taken. If
noxious weeds, as listed in Weld County Code, Chapter 15, exist on -site, appropriate
steps need to be taken before, during, and after work is completed to control their spread.
Contact the Weld County Public Works Weed Division Supervisor at 970-304-6496 for
additional information if needed.
Seeding and Planting Notes
1. Unlined drainage facilities and all areas disturbed during construction shall be actively
revegetated. Seed mixes are shown in the table below. Recommended seed mixes
may he obtained from the Weld County Public Works Pest and Weed Supervisor.
2. Seed mixtures should be sown at the proper time of year specified for the mixture.
3. Recommended seeding rates specified as "pounds pure live seed per acre' (Ms
PLS/acre) should be used.
4. Seed should be drill seeded, whenever possible.
5. Broadcast seeding or hydro -seeding may be substituted on slopes steeper than
3(H):1(V) or on other areas not practical to drill seed.
6. Seeding rates should be doubled for broadcast seeding or increased by 50% if using a
Brillion drill or hydro -seeding.
4905 7. Broadcast seed should be lightly hand raked into the soil.
8. Seed depth should be 1/3 to 1/2 inch for most mixtures.
9. All seeded areas should be mulched, and the mulch should be adequately secured.
10. If hydro -seeding is conducted, mulching should be conducted as a separate, second
operation_
11. Al! containerized nursery stock should be kept in a live and healthy condition prior to
installation.
12. Containerized trees and shrubs should be installed according to the planting details
provided in Section 4.4 of the Urban Drainage and Flood Control District Volume 2,
Chapter 12: Revegetation.
13. Live slakes, poles and willow bundles should be installed when dormant (fate winter and
early spring) according to the planting details in Section 4.7 of the Urban Drainage and
Flood Control District Volume 2. Chapter 12: Revegetatlon-
14. Seed mixtures should be coated with Mycorrhiza at the rate of 2 pounds per acre at the
time of seeding. If mulching with straw, be sure the straw Is seed free and weed free -
Date
Date
Data
BY
BI
BY
REVISIONS
Description
Deseription
DescriptionApproved B.W.S.
pate DECEMBER 2012
Scale 1 "= 30'
Drawn D.M.C.
Field Book Checked B.W.S.
CLIENT
MOUNTAIN VIEW FIRE PROTECTION DISTRICT
SHEAR ENGINEERING CORPORATION
4836 SO. COLLEGE AVE, SUITE 12, FORT COLLINS, COLORADO 80525
PHONE: (970) 226-5334 (970) 226-4451 FAX: (970) 282-0311
TITLE EROSION/SEDIMENT CONTROL AND WATER QUALITY PLAN
BALDRIDGE P.U.B., FIRST FILING, FIRST REPLAT
WELD COUNTY (LONGMONT), COLORADO
PROJECT NO.
2608-04-12
==
e♦ (y)E5"SCMP
NI=L_`
y EXISTING
15" CMP
2"CLR.I.F.
TOP VIEW
OUTLET
PROPOSED 15"
RCP ARCH PIPE
NOTE: CONSTRUCT THE TOP OF THE
BOX AS CLOSE TO THE EXISTING
PIPE AS POSSIBLE.
/TOP OF BOX, ELEV; 4902.50±
r// Tnf cI
T
#4 0 12
O.C.,TYP.
SECTION A -A
A
t
B
0Gh
00 00
oo�noo 00[1000
IOU
B
A
NEENAH FRAM &
GRATE TYPE R-3574
or EQUAL SIZE 47
3/4" X 26 1/2"
12"0.C.
3"CLR.0. F.
2"CLR.I.F.
SECTION B -B
2' X 4' STORM SEWER AREA INLET STRUCTURE
N.T.S.
POSTS
24 -min
COMPACTED BACKFILL
SILT FENCE FAWRUC MICNOREO iN
TRENCH AND ATTACHED TO POST.
—FIDE
ter.
SILT FENCE BRIC ANCHORED IN
TRENCH µDFIATTACHED TO POST
RUNOFF
INSTALLATION:
DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18-, AND
EXCAVATE A TRENCH APPROXIMATELY 6" MOE AND 6" DEEP ALONG THE LINE
OF POSTS AND UPSLOPE FROM THE BARRIER, NOT LESS THAN WE BOTTOM V OF
THE FILTER FABRIC SHALL BE BURIED INTO THIS TRENCH.
SILT FENCE
INLET GRATE
Ir4 AROUND PIPE
(TYP) 3" CLEAR
TYPE M, BURRIED RIPRAP
1,1'� 1111�I`II`_�I I �cV `111Q1111
ON MANS OR MIN, 1.5 X
AVERAGE ROCK SIZE
FILTER FABRIC
MIRAFl 140
OR EQUAL
GRAVEL BED DEPTH
EQUAL TO MIN. SIZE
OF RIPRAP GRAVEL
SIZE 3/4"-1 1/2"
WIT �A"�-"! MINVLA, ...
6 -MINIMUM
1/2"-3/4" FILTER LAYER
1 1 /2"--3" ROCK
15' MIN.
TEMPORARY VEHICLE TRACKING CONTROL
UNDISTURBED SOIL OR
COMPACTED TO 95%
STANDARD PROCTOR
NTS
EROSION CONTROL GENERAL NOTES:
1. INSPECT AND REPAIR GRAVEL FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT
WHEN ONE HALF OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE
DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE.
2. EROSION CONTROL MAINTENANCE IS THE RESPONSIBILITY OF THE DEVELOPER.
6" BACKFILL W,/NATIVE
MATERIAL
SECTION Z -Z
BURIED RIPRAP PLACEMENT DETAIL
ri
II
I
UNDISTURBED 'I
SOIL OR
COMPACTED TO
95% STANDARD
PROCTOR
TOP BANK=99.69
R
di r
I I
EFIO TRFAITMEMT S UPTYV
IS 2' DEEP OR AS SHOWN
(DOES NIJj APPLY 10
TOP EDGE ON SIDE
SLOPES)
NOTF:
IF RIPRAP 1S TO BE GROUTED IN PLACE,
BEDDING RIND THICKNESS IS SAME AS
NON —GROUTED. FOR GROUTED RIPRAP
THE SMALILEST ROCK FRACTION SHOULD
BE ELIMINATED FROM THE GRADATION.
GROUT TOI BE SAND CEMENT MIXTURE
W/2400 psi, 28 DAY STRENGTH, 5% AIR
ENTRAINMENT AND A 5 TO 7 INCH SLUMP.
MAW/NATIVE
MATERIAL
H117 -
PRAP KEYED END DETAIL
23'
4'
15'
4'
4:1 MAX
WEIR
Z
TOP BANK: 99.69
EMERGENCY OVERFLOW WEIR DETAIL
INSTALL PER GRADING PLAN
EXISTING
DETENTION
POND
UTANit MOLD dE IWIVLN InslULIGH T C 1D .E cr Tx
WATTLE. LEAVING 2 " S INCHES OF THE STARE PROTRDING
ABOVE THE WATTLE A WAVY SEDIMENT LINO DILL TEND
TO MP THE WATTLE HIP µD COULD PULL IT EFF THE
STAKES IF REY ARE DRIVEN 0OVN TOO LOW. IT WAY BE
WCESSARY TO MANE A MLLE IN TIE VATILE WITH A PICK
END OF YOR MAMMA IN ORDER +TrI GET TIEE BLARE i11ROGN
rnE srN,1N 5i�Aa A I I I �( �1
!' '� 1I 119 H 11 �14
� ddryry 1
� CI�II�N�
VIIIII M R uhl
M iN I Irrj Whit DI ELIA S, IIkIVL iNt STMLS
PERPENDICU AR Tn DC Ti WC
!IiEYI flt iIR3i PIO ITAKE F 111I.W[[ Il UAijlx,
!Lie:IMAM
SALT fel-ele, v UlD9 HID DLY'Nv fl tl Ntfc. N•_ 9,
IF II£ AREA BEHIND THE INLET IS ACT
STABILIZED, A RIP SHOED DE USED To
PREVENT SEBNEWT FRBI ENTERING TIE
INLET
SECURE WITH SAID SAG
CURD INLET WATTLE PROTECTION SETUP
IL II L'7Ti &TkLet
W ATI-LES
A.....
- T)EIML A r -,
OM 1NiI I_�X �MHi iiiiillli Ui WiitI .
TO PREVENT SHIFTING, WIT Tx SIGNS,
WATTLE TI6RLY AGAINTT DC FIRST. Dtl lar
I FROM 04R,A�OSSFRRIM al �EAOI SIDE
OF WATTLE LEAVING 4'-6' OF STAKE
PWTJDOG ARov�t TnIE WATTLE TRAILING V➢E
�+yy+rrIIR If N�iJ1!LyS`■III{fiJTNIJrf/IWC ]�rIT:.R F TIFn I� 1TyT 'HIT
I I � iI'1'. I, I' F � IS, ' 1A1, 1 1,11, ° ,1,R ), trll
It 1, il.t1 1 00 IaFF J1.111111'
*Ali tO
AND MCA TO T a1 '
Will NT III':
tuff FIEHRET allf. ill Ili UInT F
( „
L_ ��i, R L;,AI LIMB .
V HE LES IIUR AID LUG IN LRITEE IS DEPENDENT M r1E CONDITIONS Ii EACH SITE.
L VA TEES SHALL SE INSTALLED PRIER TO ANY LAND -DISTURBING ACTIVITIES.
VA TEES SHALL DINS ST O STRAW, COPIIST, EXCELSIOR. CO COMM FIBER
I, MOT FUR LIE IN CRICENTRATED FLOW MEAL
1, THE WATTLES SHALL SE TRENCHED INTO THE GROID A NINIRM Er TWO !2) ROCS.
A. VA TEES SHALL DC INSTALLED PER 'W1FACTIIREAS SPELTICATIONS.
7. IM SLOPES, WATTLES SEAAD SE INSTALLED EN CENTERS, WITH A SLIGHT m]WWARD NC4S AT TIE END O Tx ROW IN ORDER TO
PREVENT PONDIRG AT TIE MID SECTION.
E RUNNING LENGTHS EF WATTLES SIA1Ln BE ABUTTED FIRMLY TO ENSURE HO LOAM', AT TIE AN]THENTE
4. SPACING - DOWNSLG E•
VERTICAL SPACING FOR SLOPE INSTALIATTONS SHLB D BE B[TERMIxD BY SITE CENDITIENS SLOPE GRADIENT AND SOIL TYPE APE THE
MAW FACTIRs. A GOD RIFE A MJHS IS,
1.1 SLOPES - IC FEET WART
2.I HOES - BC T T
SLOPES - 3C FEETFEEAPAPMT
.42'.1SLEP[S - IO FEET APARART. ETC.
HOWEVER, AI.MSTINTS MAY HAVE TO DE MALE FUR THE SOIL TYPE. FDA SOFT. LONIY SOILS - ADJUST THE RCVS CLOSER TOGETIIEA.
FOR HARD. ROCXY SOILS - ADJUST THE ROWS FLIRTER APART, A SECOIEARY WATTLE PLACED MENINX THE AD.ITIENT Or TWO WATTLES
IS EHDIPAGE➢ DI STEEP WIPES C ',MERE -HINTS HAVE FAILED IN THE PAST.
ID STAKING. THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES yr TO S/8' REBAR IS ALSO ACCEPTABLE BE SURE TO
ILSE A STAKE THAT IS LAG EICUGH TO PROTRUDE SEVERAL DIMES ABOVE TIE WATTLE, IS' IS A GOOD LENGTH FOR HMO, ROCKY SOIL.
FOR SOFT LDMT SOIL USE A $4' TIME,
r(TSTIHG on
PROPOSED INLET
ENDS SMALL ABUT TIGHTLY
TO BACK U' CURB
TCP BACK CURD
DEPOSITIEN
Mit
END STALL ABUT TIGHTLY
TO BACK IT CLPR
STERN WATER LIRE
SECURE WITH SAND BAGS
STORM WATER LINE SPACED 4' MART RTP,)
KITE.
INSTALL ENE ES, FORE GUTTER WATTLES BETWEEN DNPACTEB INLETS AND CWSTRLCTIE
DISIIRBAACE [AMBER O WATTLES AND SPACING SHOULD BE DETERMINER BY TFE SITE
CONDITIONS.
GUTTER PROTECTION SETUP
WATT, E MAINTrNAWT Hurl.
L TIE CONTRACTOR SHALL INSPECT WATTLES EVERY TWO WEEKS AND AFTER ANY SIGAIrTCANT STORK EVENT AID HAKE REPAIRS OR REITIVE
SEDIMENT ACCUMULATED BONNE WATTLE AS NECESSARY.
E. SEDIMENT ACT'UAa AT[D BEHIND WATTLE SHALL DE RENEWED WHEN TIME SEDIMENT HAS ACCSBALATED TO OE MALE TIE DEMETER OF THE
3. WATTLE.
WATTLES SMALL REMAIN IN PLACE UNTIL TIE UPSTREAM DISTURBED AEA IS STABILIZED AND IS ACCEPTED BY 1S, CITY.
v 100 YR WSEL=4898.44
MATCH TO
EXISTING
WQCV PLATE ON
INSIDE OF WALL
SEE DETAIL BELOW
NO.93 STAINLESS STEEL
WELL —SCREEN & FRAM
SEE DETAIL BELOW
PROPOSED 3' V —PAN'
EIGHT, 5/16 -HOLES
AND 1/4" ANCHORS
(TYPICAL)
BOTTOM OF
PLATE = 95.75
INV = 95.6
4895.90
0.50%
EXISTNC 8- PVC
OUTLET BEYOND
1/4" RESTRICTOR PLATE
W/EIGHT ANCHORS RESTRICTOR PLATE
ON IN SIDE OF EXIST. OUTLET STRUCTURE
2.-2-
2' INSIDE
4896.90
4895 89
4'
A,
12' LONG
DOWELS or 0
3" CLR.
N
x
co
NEW
RESTRICTOR
PLATE
EXIST. OPENING
_ 4 PVC
EXIST. WALLS
MATCH EXISTING (TYP)
FOR POND
WOCV PLATE
ON INSIDE OF WALL, SEE
PLATE DETAIL AT RIGHT
ID
z
2
a
`E
0
NO.93 STAINLESS STEEL
WELL —SCREEN Sc FRAME
2,88'±
NEW WATER
QUALITY
STRUCTURE A
TOP VIEW
EXIST. 4'
T.O.B. EL, 4598.36
EXISTING
OUTLET
STRUCTURE
12" VICE
TOP OF BERM
4899.69
RESTRICTOR
PLATE (NEW)
F
ENDS LE ADJACENT WATTLES
SHALL BE TINRLTLY ABUTTED
TO PREVENT SEDIMENT BYPASS
WATTI ES — DETAIL 0
WATTLE EILTER DFTAII
IN
TIGHTLY AR1T TO
RAOL OF CIS➢
TEP 1/Llf CURL
WATTLE INSTALLATION
REGRADE BERM AT 3: 1 SLOPE DOWN
AND TIE TO EXIST SLOPE, EXISTING
RIPRAP TO REMAIN, SEE GRADING PLAN.
!�
4895.63
11IIIIIIIIEf-I
110p
3 �, .o8X .G UHF -
I, I I I = —1-.
� 20
SECTION A -A
2 1/2" X 1 1/2" ANGLE IRON WELL
SCREEN FRAME, ATTACHED TO WELL
SCREEN BY INTERMITILNT WELDS
MATCH EXISTING (TIP)
4896.9
4895.9
N4 O6"
0- C.,TYP,
2 1/2
P
11"
EXISTING GROUND AND
RIPRAP TO REMAIN
8`F`17NG 8 -PVC ~ \
PLATE COVERS 6" OPENING:
1/4" THICK PLATE ON TOP OF ANGLE
IRONS, 7 1/2" WIDE X 6 1/4" LONG,
WELDED TO THE ANGLE IRONS
1/2"
3 16
TYP
FOUR, 5/16"HOLES
ND 1/4" ANCHORS
(TYPICAL)
NO.93 STAINLESS STEEL
WELL -SCREEN
1 „(TYP 3 16 ► )
1/4" THICK PLATE ON BOTTOM OF ANGLE
IRONS, 1 1/2" WIDE X 6 1/4" LONG.
WELDED TO THE ANGLE IRONS
--�I
�I II III l l=1!`=1�
-III_,�IIIIIIII
�-Ill,i�l�ll�llil'�I
••,-III
SIDE VIEW
7 1/?
FRONT VIEW
WELL SCREEN & FRAME
ON OUTSIDE OF NEW STRUCTURE
EXIST OUTLET
STRUCTURE
NEW WATER QUALITY
STRUCTURE
2.68'±
3"CLR.0. F.
2-CLR.I.F.
(TYP)
40 I0"
SECTION B -B
1
DETENTION POND WATER QUALITY DETAIL
PROPOSED WATER QUALITY STRUCTURE i5
TO BE ADDED TO THE FRONT OF THE EXISTING
OUTLET STRUCTURE BOX
4896.90
6" TYPICAL WALLS
T AND FLOOR
4896.90
NEW WATER
QUALITY
STRUCTURE
C CONCRETE OPENING
FOR WATER QUALITY
4896.90
4895.90
1 I/2 (TYP.)
HI I
2"
4895.66
OD
4894.99
EXISTING
/
CL EXIST. DITCH
IX, 5/16 -HOLES &
1/4" ANCHORS (TYP)
ENTERED
EACH HOLE IS 0.613-0
WQCV PLATE 1/4" PLATE, WTH
IN/THREE (3) ROWS X ONE (1) COLUMN
OF 0.813"0 ORIFICES, 0 4" D.C.
WATER QUALITY PLATE
ON INSIDE OF NEW STRUCTURE
0
N
N
0
u Dote
a Data
REVISIONS
By Description
Bf Description
Date BY Description
Date DECEMBER 2012
Field Book
I
Scale 1 M= 1
Drawn D.µ.C. / B.R.B.
Checked B.W.S.
Approved B„W.S,
CLIENT
MOUNTAIN VIEW FIRE PROTECTION DISTRICT
SHEAR ENGINEERING CORPORATION
4836 50. COLLEGE AVE, SUITE 12, FORT COLLINS, COLORADO 80525
PHONE: (970) 226-5334 (970) 226-4451 FAX: (970) 282-0311
TITLE
DETAILS (DRAINAGE, EROSION AND WATER QUALITY)
BALDRIDGE P.U.D., FIRST FILING, FIRST REPEAT
WELD COUNTY (LONGMONT), COLORADO
PROJECT NO -
2608 -04-12
SHEET NO.
NO. OF
SHEETS
14 1 14
Hello