HomeMy WebLinkAbout20130674.tiffRESOLUTION RE: APPROVE STORMWATER ANNUAL REPORT FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) PERMIT AND AUTHORIZE CHAIR TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Stormwater Annual Report for Municipal Separate Storm Sewer Systems (MS4s) Permit from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Public Health and Environment, with further terms and conditions being as stated in said report, and WHEREAS, after review, the Board deems it advisable to approve said report, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Stormwater Annual Report for Municipal Separate Storm Sewer Systems (MS4s) Permit from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Public Health and Environment be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said report. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 11th day of March, A.D., 2013. BOARD OF UNTY COMMISSIONERS WELD COU . COLORADO ATTEST: Weld County Clerk to the Board BY: Deputy Cle APP y Attorney Date of signature {1R 19 2013 William F. Garcia, Chair (ec pa nein 014-4- Doug s Rademac r, Pro-Tem Sean P. Conway Mike Freeman tibcti arbara Kirkmey r �. eT)w(76� 2013-0674 EG0068 STORMWATER ANNUAL REPORT Municipal Separate Storm Sewer Systems (MS4s) Permit, COR-0800011 and 090000 - Renewal Permittees COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT Water Quality Control Division WQCD-P-B2 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 IMPORTANT CHANGES TO THE REPORT FORM AND REPORTING REQUIREMENTS: This annual report form includes requests for additional information and clarifies information required under the previous annual report form. The changes are described below: • Part 1: This form will be used for reporting years 2010 — 2012. • Part 3: Program Area 5 ■ For permanent water quality BMPs, the permittee must report the number of all new BMPs, per the following: o For the row under "NEW BMPS - Summary Information for the Year," the MS4 permittee must provide the total number of individual permanent water quality BMPs implemented during the reporting period. "Implemented" means that the BMPs were constructed, are operating, and have been included in the permittee's long long-term operation and maintenance portion of the Post -Construction program (Part 1.B.5.a. of the MS4 general permit). • For permanent water quality BMPs, the permittee must now report numbers for all BMPs per the following: o For the row under "ALL EXISTING BMPS - Summary Information for all BMPs," the MS4 permittee must provide the total number of individual permanent water quality BMPs implemented since the permittee began full implementation of its Post Construction program (on or before March 9, 2008, in accordance with measurable goals from the previous permit term). This is the total number of BMP structures being tracked for the Post -Construction program. Note that the option to report based on the number of sites has been removed. o For the rows under "INSPECTIONS," the MS4 permittee must provide the total number of individual BMPs inspected, in addition to the total number of BMP inspections conducted. The total number of BMP inspections conducted may include multiple inspections per individual BMP (e.g., routine, follow-up , enforcement inspection, etc). See the example below. The number of BMPs inspected will be compared to the total number reported under "ALL EXISTING BMPs" as an indicator of the MS4 permittee's level of oversight for this program area. The number of BMP inspections provides an overall indication of inspection activity for this program area. Inspections reported in the following two rows are those completed by the MS4 permittee or authorized agent. For Post -Construction programs that allow owners to self - inspect BMPs and the MS4 permittee to "spot check", only the oversight inspections completed by the MS4 permittee or their authorized agent are to be reported on the annual report. "BMPS Inspected" versus "BMP Inspections" Example: An MS4 permittee has one proprietary BMP, one water quality pond and two sand filters for a total of 4 BMPs in the Post - Construction program. In this example, the proprietary BMP had a routine inspection quarterly. The water quality pond had one routine inspection and one follow up inspection. One sand filter was inspected once and the other sand filter was not inspected during the reporting year. For the "Number of BMPs Inspected", the answer is 3. For the Number of BMP Inspections, the answer is 7. Updated 12/2009 2013-0674 1 of 8 STORMWATER ANNUAL REPORT Municipal Separate Storm Sewer Systems (MS4s) Permit, COR-080000 and 09000( - Renewal Permittees COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT Water Quality Control Division WQCD-P-B2 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 Each part of this fonn (1 through 7) must be completed and the certification in Part 2 must be signed by the legally responsible person. One original copy (no faxes or e -mails) of the completed Annual Report Form, including attachments if required, shall be submitted by March 10th of each year covering January 1 through December 31 of the previous year. Part 1.E.4 of the MS4 permit requires that an Annual Program Review be conducted by the permittee as necessary for the preparation of the Annual Report. The review for each reporting year must be completed prior to the submittal of this form. The annual review shall include: a) A review of the CDPS Stonnwater Management Program compliance status with any schedules and other Measurable Goals established under the Program; b) An assessment of the effectiveness of controls established by the Program; and c) An assessment of any program modifications needed. Part 2 of this form includes a certification by the permittee that their CDPS Stonnwater Management Program is being implemented in compliance with the conditions of the permit, which includes completing all program implementation commitments provided in submittals to the Water Quality Control Division to meet permit conditions. If the permittee is not in compliance with the conditions of the permit, a Notification of Noncompliance must be provided in accordance with Part II.B.I of the permit at the time of, or prior to, the submittal of this form. PART 1: PERMITTEE INFORMATION Permittee (Agency name): Weld County Reporting Year (check one) ❑ Jan 1, 2010 to Dec 31, 2010 Mailing Address ( D check irncw): P.O. Box 758 ❑ Jan 1, 2011 to Dec 31, 2011 X Jan 1, 2012 to Dec 31, 2012 annual report is due for each City, State and Zip Code ( ■ check if new): Greeley, CO 80632 (The reporting year by March 10 of the following year) Contact Person ( ■ check if new) Name: David Bauer Phone Number: (970) 304-6496 Permit Certification No: CUR — 090037 Have any areas been added to the MS4 due to annexation or other legal means? If YES, include updated map OR provide the web address for an online map. T YES X NO If permit boundary maps are online, please provide the web site address: Updated 12/2(x)9 2of8 PART 2: ANNUAI. REPORT CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there arc significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." "I certify that to the best of my knowledge and belief the CDPS Stormwater Management Program is being implemented in accordance with the requirements of COR-090000 OR that a notice addressing the failure to implement the CDPS Stormwater Management Program has been provided in accordance with Part II.B.1 f the permit." X 'iY; Signature o Permittec* Date Signed Chair, Board of Wled County Commissioners Title of Signatory *In accordance with the permit, this report shall be signed and certified for accuracy by either a principal executive officer, ranking elected official or other duly authorized employee. PART 3: INSPECTION AND ENFORCEMENT In the tables below, provide the number of inspections and actions performed for the following programs for the reporting year. Program Area 3: Illicit Discharge Detection and Elimination Enforcement: Provide the number of enforcement actions performed to address violations of the permittee's Illicit Discharge Detection and Elimination program, by category. If multiple distinct actions were taken as part of an escalation process, count each action separately. Actual numbers must be provided. Do not list "multiple" or "continuous." Number of Actions Monetary Penalty/Fine (include the number of enforcement actions, not a dollar amount) None Written Notification of Violation None Verbal Notification of Violation None Charge for Cleanup/Rcmediation (include the number of enforcement actions, not a dollar amount) Zero Other (If a predefined category is not included above for enforcement tool(s) used, provide a description of the tool(s) and associated number(s) of actions below.) 1. 2. 3. (add rows as needed) I. -. i. Updated 12/2009 3 of 8 Program Area 4: Construction Site .RunolT Control Actual numbers must be provided. Do not list "multiple" or "continuous," Number of Sites Total number of construction sites covered by inspection program during the year. Include each site that was active at any time during the reporting year. Two Inspections: Provide the number of inspections to assess and enforce compliance with the requirements of the permittee's Construction Site Runoff Control program. Inspections must be divided into the following two categories. Number of Inspections Full Level Inspections conducted to assess the adequacy of BMPs and overall site management, performed by an inspector adequately trained to determine compliance with the requirements of the permittee's CDPS Stormwater Management Program. Four -AND- Reconnaissance/Indicator Inspections conducted to only assess sites for indicators of noncompliance. Reduced Level Inspections do not fully assess the adequacy of BMPs and overall site management and/or are not performed by an inspector adequately trained to determine compliance with the requirements of the MS4 permittee's CDPS Stormwater Management Program. (For Reduced Level Inspections, an estimate of the number of inspections performed is acceptable.) Four Enforcement: Provide the number of enforcement actions performed to address violations of the permittee's Construction Sites Program, by category. If multiple distinct actions were taken as part of an escalation process, count each action separately. Number of Actions Monetary Penalty/Fine (include the number of enforcement actions, not a dollar amount) None Stop Work Order None Written Notification of Violation None Verbal Notification of Violation None Withholding of Permits (e.g., building permits, tap permits, etc.) None Work Performed by Permittee or Permittee's Contractor and Responsible Party Charged/Bond Withheld (include the number of enforcement actions, not a dollar amount) None Other (If a predefined category is not included above for enforcement tool(s) used, provide a description of the tool(s) and associated number(s) of actions below.) 1. 2. 3. (add rows as needed) 1. 2. 3. Updated 12/2009 4 of 8 Program Area 5: Post -Construction Stormwater Management Actual numbers must be provided. Do not list "multiple" or "continuous," NEW BMPS - Summary Information for the Year: Provide infonnation for the number of BMPs implemented during the reporting period. Number of BMPs Number of BMPs: Total number of individual permanent water quality BMPs implemented during the reporting period in accordance with permittee's Post -Construction Program. None ALL EXISTING BMPS - Summary Information for all BMPs since the full implementation of this program area (no later than March 9, 2008). Note, this may include sites with multiple individual BMPs: Provide the total number of BMPs in the permittee's Post -Construction Program. Number of BMPs Number of BMPs: Total number of individual permanent water quality BMPs implemented in accordance with permittee's Post -Construction Program since the full implementation of this program area. Two INSPECTIONS - Summary Information for all BMPs since the full implementation of this program area (no later than March 9, 2008: Provide information for both of the following two rows (Number of BMPs Inspected and Number of BMP inspections). Inspections reported in the following two rows are those completed by the MS4 permittee or authorized agent. Number of BMPs Inspected/ Inspections Two Number of BMPs Inspected: Total number of individual permanent water quality BMP structures inspected to ensure compliance with long term operation and maintenance requirements of the permittee's Post -Construction Program. Number of BMI' Inspections: Total number of inspections of permanent water quality BMPs to ensure compliance with long term operation and maintenance requirements of the permittee's Post -Construction Program. Enforcement: Provide the number of enforcement actions performed to address violations of the permittee's Post -Construction Management program, by category. If multiple distinct actions were taken as part of an escalation process, count each action separately. Include actions associated with installation AND long term operation. Number of Actions Monetary Penalty/Fine (include the number of enforcement actions, not a dollar amount) None Stop Work Order None Written Notification of Violation None Verbal Notification of Violation None Withholding of Permits (e.g., building, tap, occupancy, etc.) None Work Performed by Permittee or Permittee's Contractor and Responsible Party/Bond Withheld (include the number of enforcement actions, not a dollar amount) None Other (If a category is not included above for enforcement tool(s) used, provide a description of the tool(s) and associated number(s) of actions below.) 1. 2. 3. (add rows as needed) 1. L. 3. PART 4. MEASURABLE GOALS The permittee must report on all Measurable Goals due in accordance with the due dates provided by the permittee in the previously submitted CDPS Stormwater Management Program Description or subsequent approved program modifications. Measurable Goal due dates cannot he changed below; they must be made in accordance with the permit Part I.E.2.a. Updated 12/2009 5 of 8 4.A) Measurable Goals due during the Reporting Year: Has the permittee completed all measurable goals due during the Reporting Year? n No, one or more Measurable Goals were due, but not completed (A notice addressing the failure to implement the COPS Stormwater Management Program must be provided in accordance with Part II.B.1 of the permit) ❑ N/A, no Measurable Goals were due this Reporting Year X Yes, one or more Measurable Goals were due this Reporting Year and completed. A List of completed measurable goal(s)s must be provided below. List all measurable goals that were completed during the Reporting Year: Completed Measurable Goal Revised Illicit Discharge Ordinance was adopted by Board of County Commissioners and became County Code 4.B) Future Measurable Goals: Does the perrnittee have one or more measureable goals due in future years of the remaining permit term? X No, measureable goals are not due in future years of the remaining permit term. n Yes, one or more measureable goals are due in future years of the remaining permit term. A summary of the measureable goal(s) must be provided below. Future Measurable Goal Due Date Status Redifined boundaries Updated 12/2009 6of8 PART 5. INFORM ATION COLLECTED AND ANALYZED (attachment) Did the permittee collect and analyze any information during the reporting period, including any water quality monitoring, to assess the success of the program at reducing the discharge of pollutants to the MEP? X No n Yes If you answer yes, a summary of the information collected and analyzed must he attached. PART 6. PROPOSED CHANGES TO CDPS STORMWATER MANAGEMENT PROGRAM (attachment) Is the permittee proposing any changes and/or additions to the CDPS Stormwater Management Program, including changes to any BMPs or any identified Measurable Goals that apply to the program elements? X No ❑ Yes . If you answer yes, a summary of the change/addition must be attached in accordance with the guidance provided below. For significant changes that involve replacing or deleting an ineffective or infeasible BMP, the summary must include the information required in A through E below, and Part I.E.2.a.2 of the permit. For the BMPs/Measurable Goals that were previously described in reports or the permit application, provide a summary of any proposed changes and/or additions. BMPs include all program elements implemented to meet the requirements of the permittee' s CDPS Stormwater Management Program. Significant changes that involve replacing or deleting an ineffective or infeasible BMP may require Division review, as outlined in Part I.E.2.a.2 of the permit. For each change proposed, you must provide: A) The applicable Program Area; B) The BMP/Measurable Goal for which a change is being proposed; C) Any proposed changes to the BMP description; D) Any proposed changes to the Measurable Goals (including specific dates and numeric measures); and E) The rationale for the proposed changes. Note that submittal of a request to change BMPs and/or Measurable Goals must be made prior to the implementation of the change and/or the deadline in the Measurable Goal. If the deadline is before the due date for the Annual Report, the change must be requested independent of the Annual Report submittal. Updated 12/2009 7 of 8 PART 7. NOTICE OF NEW PROGRAM ELEMENT OPERATION BY A SECOND PARTY (attachment) Has the permittee's program changed to rely on another government entity to satisfy some of their permit obligations? Answer "yes" only if not included in the permittee's Program Description Template or previous report submitted to the Division, X No ❑ Yes . If you answer yes, a summary statement must be provided. Example statement: "As of (date) (entity) is performing the construction site plan reviews for the City in accordance with the procedures in the City's original application." Updated 12/2009 8 of 8 Hello