Loading...
HomeMy WebLinkAbout20133212RESOLUTION RE: APPROVE GRANT APPLICATION FOR REPLACEMENT OF BRIDGE 13/44B - COLORADO COUNTIES, INC. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Grant Application for the replacement of Bridge 13/446, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to Colorado Counties, Inc., with further terms and conditions being as stated in said application, and WHEREAS, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Grant Application for the replacement of Bridge 13/44B, from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to Colorado Counties, Inc., be, and hereby is, approved. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 18th day of November, A.D., 2013. BOARD OF COUNTY COMMISSIONERS WELD C COLORADO ATTEST: Weld County Clerk to the Board BY APPROVED AS TO FO ounty ,i < /OF Deputy erk to the Bo `rf- 1 RI ney S Chair Dog s�Radema her, Pro- Te V arbara Kirkmeye Sean P. Conway tiLith Mike Freeman r Date of signature: NOV 2 7 2013 ec°Aidfnxev./are) ia 0a9/0 2013-3212 EG0068 BOARD OF COUNTY COMMISSIONERS REVIEW/ WORKSESSION REQUEST RE: Grant Applications for Bridge 19/46.5A and Bridge 13/44B Replacement DEPARTMENT: Public Works DATE: October 30, 2013 PERSON REQUESTING: Wayne Howard and Michael Bedell, Public Works Department Brief description of the problem/issue: Public Works Department is requesting approval to submit grant applications for bridge funds for replacement of these two bridges. The grant applications will be submitted through the Colorado Counties Inc. office. The submittal deadline is November 18, 2013. Bridge 19146.5A has an estimated daily traffic volume of 1,040. This bridge was constructed in 1960, has a low sufficiency rating, and is classified in the bridge inspection report as being "structurally deficient". The bridge was overtopped with water and suffered some damage during the recent flooding. If the grant is approved, design by an engineering consultant could start in 2015 and construction in 2016. Bridge 13/44B has an estimated daily traffic volume of 1,767. The bridge was constructed in 1966, has a low sufficiency rating, and is classified in the bridge inspection report as being "functionally obsolete". The bridge was overtopped with water and suffered some damage during the recent flooding. If the grant is approved, design by an engineering consultant could start in 2015 and construction in 2016. If a grant application is approved, Weld County would be responsible for 20% of the costs of the project. Our estimate of the total project costs for Bridge 19/46.5A is $1,200,000 therefore our 20% cost -share portion would be $240,000. Our estimate of the total project costs for Bridge 13/44B is $1,600,000 therefore our 20% cost - share portion would be $320,000. The County cost -share portion would need to be budgeted in FY 2015. What options exist for the Board? The Board may choose to approve or not approve these proposed bridge grant applications. Recommendation to the Board: The Department recommends the Board responsible for reviewing the applications William F. Garcia, Chair Douglas Rademacher Sean P. Conway Mike Freeman Barbara Kirkmeyer Approve Schedule Recommendation Work Session `ot' m approve these grant applications. The Special Highway Committee plans to make funding recommendations by late December, 2013. l7 Comments 'Dry WI friv 6"� Sto149< 2013-3212 PUBLIC WORKS DEPARTMENT 1111 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 PHONE: (970)-304-6496, EXT. 3706 October 30, 2013 Eric Bergman Colorado Counties, Inc. 800 Grant Street, Suite 500 Denver, CO 80203 RE: Narrative for Bridge WEL019.0-046.5A (Fiscal Years 2016-2017 Funding) Bridge WEL019.0-046.5A is located on Weld County Road (WCR) 19 and spans the Little Thompson River 0.1 miles north of WCR 46.5. This bridge is heavily used by agricultural trucks and equipment. WCR 19 is a vital paved link for the area near the communities of Johnstown, Milliken, and rural landowners south of State Highway 60. Traffic counts in 2013 show an average daily traffic of 1,040 vehicles per day. Replacement of this bridge is our #1 priority for this bridge funds application period. The bridge is 30' wide, 55' long (two spans), and was built in 1960. It is structurally deficient, and has a sufficiency rating of 50.4 reported by Short Elliott Hendrickson on 5/22/12. The bridge has a major problem with rusted steel substructure and superstructure. The bridge rail and approach guardrails are constructed improperly, in poor condition and do not meet current AASHTO/CDOT standards. The asphalt surfacing on the deck is in poor shape with extensive cracking, rutting, and improper drainage. This bridge was overtopped with water and suffered significant damage during the September, 2013 flooding event, mainly to the approaches and abutments. Emergency flood repairs were recently completed to get the roadway reopened to traffic. Weld County believes this bridge is in need of replacement because of its structural incapacity, poor driving surface, and safety concerns. Rehabilitation instead of replacement is not a viable option, nor cost effective, because of the excessive amount of rusting steel and inadequate opening size. The width and length of the bridge and deck elevation would likely be increased to meet current design standards and floodplain requirements. This project would require hiring an engineering consultant to complete the design work. We estimated the replacement cost at $1,200,000. Please contact Weld County Public Works Department if you need any information in addition to the contents of this application. Sincerely, VJ s a ri. Michael Bedell, P.E. Senior Engineer Special Bridge Fund Bridge Construction Estimate Structure Number: WEL019.0-046.5A (Priority #1) Engineering: Preliminary Engineering Design Engineering Construction Engineering and Staking Project Engineering Final Inspection TOTAL ENGINEERING COSTS: Labor -Materials -Equipment: Mobilization Site Preparation/Dewatering Excavation/Backfill Abutments/Piers/Piling Structure/Deck/Guard Rail Approaches Pavement TOTAL LABOR - MATERIALS - EQUIPMENT COSTS Contingencies: TOTAL PROJECT COST: Design/Engineering Start Date (mo/yr): Date of Bid Opening (mo/yr): Construction Start Date (mo/yr): Estimated Project Completion Date (mo/yr): Estimate Prepared by: Approved by: David Bauer, P.E. County: Weld $ 10,000.00 150,000.00 50,000.00 30,000.00 10,000.00 $ 250,000.00 $ 50,000.00 40,000.00 80,000.00 360,000.00 180,000.00 100,000.00 40,000.00 $ 850,000.00 $ 100,000.00 $ Aug/2015 Aug/2016 1,200,000.00 Oct/2016 Jun/2017 M:9.b eta Michael Bedell, P.E. Title: Date: �O30\ S Senior Engineer Title: Dir ctor of Public Works Date: j/3 Hello