Loading...
HomeMy WebLinkAbout770992.tiff RESOLUTION RE: ACCEPTING OF NEW LETTER OF CREDIT FOR IDA INDUSTRIAL PARK - SECOND FILING AND AUTHORIZATION OF CLERK TO THE BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO, TO RELEASE A LETTER OF CREDIT DATED NOVEMBER 9 , 1976. WHEREAS , the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, are vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS , the Board of County Commissioners of Weld County, Colorado, have previously accepted a letter of credit from Ida Industrial Park - Second Filing, which letter of credit was dated November 9 , 1976 , and authorized credit in the total sum of Twenty Six Thousand Two Hundred Fifty-eight Dollars and 87/100 ($26 , 258. 87) , and WHEREAS, application has been made to the Board of County Commissioners of Weld County, Colorado for withdrawal of the aforesaid letter of credit dated November 9 , 1976 and substi- tuting in its place a new letter of credit dated February 16 , 1977 on the Platte Valley Bank of Brighton, Colorado 80601 in the sum of Twelve Thousand Four Hundred and Four Dollars and 87/100 ($12 , 404. 87) . NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado, that the letter of credit as hereinabove described and dated November 9 , 1976 , be and hereby is released and a new letter of credit dated February 16 , 1977 on the Platte Valley Bank of Brighton, Colorado 80601 to the Board of County Commissioners of Weld County, Colorado in the sum of $12 , 404. 87 for and on behalf of Ida Industrial Park - Second Filing, be and the same is hereby accepted. The above and foregoing Resolution was , on motion duly made and seconded, adopted by the following vote on the 9th day of March A.D. , 1977. 770992 LL . . r r r, r The above and foregoing Resolution was read into the record and signed on the 16th day of March A.D. , 1977. BOARD OF COUNTY COMMISSIONERS 17LD COUNTY, COLORADO \)(4, 1-41 .1/N ,rn d'e-1(' ? `fir r. ' 5 r ATTEST: ,� ii/ Weld County Clerk and Recorder and-Clerk to the Boaad, ily: . ( '. .,,L , _0 h,) c, , r Cr]^,_J ,a Deputy County Clerk 1 APP 9VED AS . F8 '-7/14: 7„,_;„, /PGc County Attorney -2- HrU en�r • �► 4th and Bridge Street Platte Valley Bank Brighton, Colorado 80601 LETTER OF CREDIT February 16, 1977 Number 77-2 TO: Board of County Commissioners Weld County, Colorado Dear Sirs: Please be advised that the PLATTE VALLEY BANK, at the request of L. Harlow Leeper, has established for Ida Industrial Park - Second Filing, a credit with our bank for $12,404.87 which shall be irrevocable until February 16, 1979. We hereby authorize you to draw on same at sight for any sum or sums not exceeding $12,404.87 for said period. We hereby agree with the Drawers , Endorsers , and Bonafide Holders of all drafts drawn under and in compliance with the terms hereof will be duly honored and paid by the undersigned. Funds to be used in accordance with Subdivision Improvements Agreement Exhibit "A" Each draft drawn hereunder must specifically mention the number and date of this Letter of Credit. The draft amount must be endorsed nn the re- verse side of this instrument. P ATT VAL EY BA ichard Chenoweth Senior Vice President RC:sab • i Platte Valle Bank 4th and Bridge Street t Y Brighton,Mon, Colorado 80601 LETTER OF CREDIT November 9, 1976 Number 76— TO: Board of County n isioners Weld Cou ty rado Dear Sirs; , A!" • Please he advised hat the PLATTE VA Y 11 k, at the r q t of L. Harlow Leeper, has established f 'Yndustria Pe — Second Filing edit with our bank for .87 which s be i.r— revocalieruntil November 0, 1977. tl erehy author you to draw 1IFFsame at sight for any sum ? sums not exc ng :;$26,25©.©7 fooi„s d period. ittithereby agree with the Draw . ,,, E rsers, Donafide Holders of Ir.' drafts drawn under ancfii co anco u th e terms hereof will "ofbe duly honored and paid the ersign Funds to he usid in",ac rdamrt with f divisi Improvements Agreement Exhi it "4" /l ` y. 'S' (`tea Each draft drawn i must ifically mention the number and date of this Le er he draft amount must be endorsed o reverse ide 4i . rument. LATT -47)" doh, Chenowet i Sen. r Vice President /jls FnTE or c0ETlO7.5 COUNTY I:, �,I_LO `s� I I County f on ns;'.' ,yiI,r t ) .y_5 i ------- _ �— --o"tut ffEmORAnDUlii W �`• ��• County Commissioners February 14 , 1977 To Date COLORADO From Ida Industrial Park 2nd Filing Subject: This office would recommend that the request made by Mr. L. Harlow Leeper be granted, for Ida Industrial Park 2nd Filing. As evidenced by letter from the City of Brighton dated June 24, 1976 all sewer and water lines have been installed and accepted by the City of Brighton , therefore , the total estimated cost of Improvements and Supervision- can be reduced by the dollar amounts under sewer mains , water mains , and fire hydrants as shown on Exhibit A. The new letter of credit should then be for a total of $12, 404 . 87 and should be for a minimum period of two years . 2, Gilman E. Olson Subdivision Director I Reviewed and Approved by : /ilrc 3�ul�2( 'G. Frank Smith , Jr. County Engineer • • 3� Nc. \\, 7) P .O . u' February 1 , 1977 �°%o C' A "-f.c'' S 90�1:, Weld County Engineering Division `' P. 0. Box 758 °r Greeley, Colorado 80631 Attn: Mr. Frank Smith Weld County Engineer Dear Mr. Smith: Enclosed is a copy of the "Water and Sewer Service Utility Contract" between the City of Brighton and IDA Investments. We discussed in your office on January 18, 1977 the possibility of the deletion from the amount of our "Letter of Credit" furnished by the Platte Valley Bank of Brighton in favor of Weld County the amount of the water mains, sewer lines and fire hydrant installation as set forth in the Subdivision Improvement Agreement Cxhibit• "•' " dated October 21 ; 1976 (a copy of which is attached) . The City of Brighton has supervision and inspection of all installation of the utilities per our agreement with them. We must meet all of their requirements as set forth in Paragraphs 2, 3, 4, 5 and 6 of the here- tofore mentioned utility contract or we don't get any water or sewer service. It would seem to us that this is a duplication of jurisdiction and it definitely works a hardship on us in obtaining financing for development. The development of IDA Industrial Park—Second Filing is not going to move along as rapidly as anticipated due to the energy crisis and economic problems now being experienced. Your consideration on the above matters will be appreciated. Respectfully, IDA IIVVES _ "PS �, / L. Barlow Leeper 940_6 LHL/mac enc. .N. SUBDI�SION I.4.ROVEMENTS AGREEME� EXHIBIT "A" Date : October_ 21, 1976 Name of Subdivision : Ida Industrial Pa— 1 - Second Filing Location : In SE ,- Sec . 31, TiN, RAJ Intending to be legally bound , the undersigned subdivider hereby agrees to provide throughout this subdivision and as shown on the subdivision plat of 2 Tnd . Park 9nd , dated Oct. 21 , 1976 , the following county improvements . Fig , ( Leave spaces blank where they do not apply ) Estimated Construction Unit Construction Complcion Improveraents Cost Cost Cost Street grading street base 3490 Sq Yd 1 50/SgYd 5235 On Street paving 2797 sn yd 1 90/SqYd 5204 R0 1 k:MC.:s;xS,'nt(7021(x& culverts46' _15" 3. 20/ft . • 147.20 Sidewalks Storm Sewer facilities Retention ponds • i i bitch improvements j Sub-surface drainage I Sanitary sewers Trunk & forced lines Mains varies 7264.00 1 Laterals (house cone ) On-site Sewage facilities On-site Water supply & storage Jater mains vorje% 5390.00 Fire hydrants 400. 00/ea 1200.00 i Survey & street monuments & boxes I Street lighting 1 Street name signs i ' Fencing requirements ' Landscape proposal I Park improvements SUB TOTAI 24, 541 .00 I Supervision Cost 490.82 Engineering Costs 1227. 05 ( testing , inspection , as =built plans and work in addition to preliminary and Final . Plat) TOTAL ESTIMATED COST OF IMPROVEMENTS AND SUPERVISION $ 26, 258.87 411 Ai is C ) LEAL 'kL ) AN MUNICIPAL BUILDING-36 SOUTH MAIN S ISLET �,• BRIGHTON, COLORADO 80601 -(303) 659 4050 • June 24, 1976 Ida Investments 5235 East 66th Way Commerce City, Colorado 80022 You are hereby notified that the following described water lines, sewer lines and sewer lift station to serve IDA Industrial Park, have been installed according to the plans and specifications and are hereby accepted by the City of Brighton for operation and maintenance hereafter subject to the usual one year warranty on all materials and installation by the contractor and IDA Investments and subject to trench patching . 1 . 12" Ductile iron water pipe from County Line Road northerly to Weld County Road 2% and westerly on Weld County Road 2% to North 5th Avenue. 2 . 8" Ductile iron water pipe from County Road 2%. northerly approximately 1 , 070 feet . 3 . Sewer lift station located at the northeast corner of County Line Road and old U. S . Highway No . 85 , 4. 10" VCP from County Line Road northerly to County Road. 2% and westerly on County Road 2% to North 5th Avenue and northerly on North 5th Avenue approximately 1 , 380 feet . 5 . 6" PVC pressure sewer line from said sewer lift station southerly approximately 1 , 700 feet to the 21" outfall line of the City of Brighton, Sincerely, •Siuitr Robert L. Sandqu St P .E .P ,E , / dki Director of Public Works CC : Lind Engineering , Hugh Ulrey and Dick Pounder c,. ₹a: :ien- rvu. 1_— 000 00 126 00 '.6100 $ Secured . ock :glue Pledged ,te 0.00 ci)s n � `QI._a . • horn Balance Unpaid WHICH THIS 1• a true :Ind accurate Hello