HomeMy WebLinkAbout20130548.tiffNOTICE OF
FINAL READING OF ORDINANCE
Pursuant to the Weld County Home Rule Charter, Ordinance Number 2013-1 was introduced on
first reading on February 25, 2013, and a public hearing and second reading was held on
March 18, 2013. A public hearing and final reading was completed on April 8, 2013, with
changes being made as listed below, and on motion duly made and seconded, was adopted.
Effective date of said Ordinance is listed below.
Any backup material, exhibits or information previously submitted to the Board of County
Commissioners concerning this matter may be examined in the office of the Clerk to the Board
of County Commissioners, located within the Weld County Administration Building, 1150 O
Street, Greeley, Colorado, between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday,
or may be accessed through the Weld County Web Page (www.co.weld.co.us). E -Mail
messages sent to an individual Commissioner may not be included in the case file. To ensure
inclusion of your E -Mail correspondence into the case file, please send a copy to
egesick@co.weld.co.us.
ORDINANCE NO. 2013-1
ORDINANCE TITLE: IN THE MATTER OF REPEALING AND REENACTING, WITH
AMENDMENTS, CHAPTER 23 ZONING, AND CHAPTER 24 SUBDIVISIONS, OF THE WELD
COUNTY CODE
EFFECTIVE DATE: April 22, 2013
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: April 12, 2013
PUBLISHED: April 17, 2013, in the Greeley Tribune
CHANGES MADE TO CODE ORDINANCE #2013-1 ON FINAL READING
Amend Sec. 23-3-310. I-1 (Industrial) Zone District, to read as follows:
A - No change.
B. Uses Allowed by Right. No BUILDING, STRUCTURE or land shall be used in the I-1
Zone District, and no BUILDING or STRUCTURE shall hereafter be erected, structurally
altered, enlarged or maintained, except for one (1) or more of the following USES. The
USES must be conducted in compliance with the Performance Standards contained in
Sections 23-3-340, 23-3-350 and 23-3-360 below.
1. Any USE of a research, repairing, manufacturing, fabricating, processing,
assembling or storage nature may be conducted in the I-1 Zone District.
SCREENING may be required if USE is not compatible with adjacent uses.
2. Areas for parking passenger vehicles.
02oi3-0542
Affidavit of Publication
NOTICE OF
FINAL READING OF ORDINANCE
Pursuant to the Weld County Home Rule Charter, Ordinance
Number 2013-1 was introduced on first reading on February 25,
2013, and a public hearing and second reading was held op
March 18, 2013. A public hearing and final reading was com-
pleted on April e, 2013, with changes being made as listed be-
low, and on motion duly made and seconded, was adopted. Ef-
fective date of said Ordinance is listed below. Any backup
material, exhibits or information previously submitted to the
Board of County Commissioners concerning this matter may be
examined in the office of the Clerk to the Board of County Com-
missioners, located within the Weld County Administration
Building, 1150 O Street, Greeley, Colorado, between the hours
-of 8:00 a.m. and 5:00 p.m., Monday thru Friday, or may be ac-
cessed through the Weld County Web Page
(www.co.weld.co.us). E -Mail messages sent to en individual
Commissioner may not be included in the case file. To ensure
inclusion of your E -Mail correspondence into the case file, please
send a copy to egesick@co.weld.co.us.
ORDINANCE NO. 2013-1
ORDINANCE TITLE: IN THE MATTER OF REPEALING AND
REENACTING, WITH AMENDMENTS, CHAPTER 23 ZONING,
AND CHAPTER 24 SUBDIVISIONS, OF THE WELD COUNTY
CODE EFFECTIVE DATE: April22, 2O13
BOARD- OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO'
DATED: April 12, 2013
PUBLISHED: April 17, 2013, in the Greeley Tribune
*111111
CHANGES MADE TO CODE ORDINANCE #2013-1 ON FINAL.
READING
Amend Sec. 23-3-310. 1-1 (Industrial) Zone District, to read as
follows:
A - No change.
B.Uses Allowed by Right. No BUILDING, STRUCTURE or land
shall be used in the I-1 Zone District, and no BUILDING or
STRUCTURE shall hereafter be erected, structurally altered,
enlarged or maintained, except for one (1) or more of the follow-
ing USES. The USES must be conducted in compliance with the
Performance Standards contained in Sections 23-3-340,
23-3-350 and 23-3-360 below.
1.Any USE of a research, repairing, manufacturing, fabricating,
processing, assembling or storage -nature may be conducted in
the I-1 Zone District. SCREENING may be required if USE is not
compatible with adjacent uses.
2.Areas for parking passenger vehicles.
,The Tribune
April 17,2013
STATE OF COLORADO
County of Weld,
I Desirea Larson
Ss.
of saidCounty of Weld, being duly sworn; say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the noticewas published in
the regular and entire issue of every number of said
newspaper during .the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Seventeenth day of April A.D. 2013 and
the last publication thereof: in the issue of said.
newspaper bearing the date of the
Seventeenth ' ' ' day of April A.D. 2013 that
said The Greeley Tribune' has been published
continuously and uninterruptedly during the period
of at least 'six 'months next prior to the first issue
thereof contained .said notice or advertisement
abovereferred to;. that said newspaper has been:
admitted to the United States mails as second-class
matter under the provisions of the Act of March
3;1879, or any amendments thereof; and that said
newspaper is a daily newspaper duly qualified for
publishing legal notices and advertisements within
the meaning of the laws of the State of Colorado.
April 17, 2013
Total Charges:
$13.30
17th day of A.iil '201
v
My Commission Expires 2/14/2015
NOTICE OF
SECOND READING OF ORDINANCE
Pursuant to the Weld County Home Rule Charter, Ordinance Number 2013-1 was introduced on
first reading on February 25, 2013, and a public hearing and second reading was held on March
18, 2013, with no change being made to the text of said Ordinance. A public hearing and third
reading is scheduled to be held in the Chambers of the Board, located within the Weld County
Administration Building, 1150 O Street, Greeley, Colorado 80631, on April 8, 2013. All persons
in any manner interested in the next reading of said Ordinance are requested to attend and may
be heard.
Please contact the Clerk to the Board's Office at phone (970) 336-7215, Extension 4225, or fax
(970) 352-0242, prior to the day of the hearing if, as a result of a disability, you require
reasonable accommodations in order to participate in this hearing.
Any backup material, exhibits or information previously submitted to the Board of County
Commissioners concerning this matter may be examined in the office of the Clerk to the Board
of County Commissioners, located within the Weld County Administration Building, 1150 O
Street, Greeley, Colorado, between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday,
or may be accessed through the Weld County Web Page (www.co.weld.co.us). E -Mail
messages sent to an individual Commissioner may not be included in the case file. To ensure
inclusion of your E -Mail correspondence into the case file, please send a copy to
egesick@co.weld.co.us.
ORDINANCE NO. 2013-1
ORDINANCE TITLE: IN THE MATTER OF REPEALING AND REENACTING, WITH
AMENDMENTS, CHAPTER 23 ZONING, AND CHAPTER 24 SUBDIVISIONS, OF THE WELD
COUNTY CODE
DATE OF NEXT READING: April 8, 2013, at 9:00 a.m.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: March 22, 2013
PUBLISHED: March 27, 2013, in the Greeley Tribune
026/3-osy8
Affidavit of Publication
NOTICE OF
SECOND READING OF ORDINANCE
Pursuant to the Weld County Home Rule Charter, Ordinance
Number 2013-1 was introduced on first reading on February 25,
2013, and a public hearing and second reading was held on '
March 18, 2013, with no change being made to the text of said
Ordinance, A public hearing and third reading is scheduled to be
held in the Chambers of the Board, located within the Weld
County Administration Building, 1150O Street, Greeley, Colo-
rado 80631, on April 8, 2013. All persons in any manner inter-
ested in the next reading of said Ordinance are requested to at-
tend and may be heard.
•
Please contact the Clerk to the Board's Office at phone (970)
336-7215, Extension 4225, or fax (970) 352 0242, prior to the
day of the hearing if, as a result of a disability, you require rea-
sonable accommodations in order to participate in this hearing.
Any backup material, exhibits or information previously submit-
ted to the Board of County Commissioners concerning this mat-
ter may be examined in the office of the Clerk to the Board of
County Commissioners, located within the Weld CountyAdmin-
istration Building, 1150 O Street, Greeley, Colorado, between the
hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday, or maybe
accessed through the Weld County Web Page
(www.co.weld.w.us). E -Mail messages sent to an individual
Commissioner may not be included in the case file. To ensure
inclusion of your E -Mal correspondence into the case file, please
send a copy to egesick@co.weld.co.us.
ORDINANCE NO. 2013-1
ORDINANCE TITLE: IN THE MATTER OF REPEALING AND
REENACTING, WITH AMENDMENTS, CHAPTER 23 ZONING,
AND CHAPTER 24 SUBDIVISIONS, OF THE WELD COUNTY
CODE
DATE OF NEXT READING: April 8, 2013, at 9:00 a.m.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: March 22, 2013
The Tribune
March 27, 2013
STATE OF COLORADO
County of Weld,
I Jennifer Usher
Ss.
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the notice was published in
the regular and entire issue of every number of said
newspaper during the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Twenty-seventh day of March A.D.
2013 and the last publication thereof: in the Issue of
said newspaper bearing the date of the
Twenty-seventh day of March
A.D. 2013 that said The Greeley Tribune has been
published continuously and uninterruptedly during
the period of at least six months next prior .io the
first. -issue thereof contained said notice or
advertisement above referred to; that said
newspaper has been admitted to the United States
mails as second-class matter under the provisions
of.theAct of March 3,1879, or any amendments
thereof; and - that said newspaper is a daily
newspaper duly qualified for publishing legal
notices and advertisements within the meaning of
the laws of the State of Colorado.
March 27, 2013
Total Charges: $9.96
\_1
27th day of March, 2013
My Commission Expires 6/14,2017
1614
Notary Public
ROBERT LITTLE
STATE COLORADO
MY COM OIMIM Sappa1E ES JUNE 14, 2017
WELD COUNTY
CODE ORDINANCE 2013-1
IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 23
ZONING, AND CHAPTER 24 SUBDIVISIONS, OF THE WELD COUNTY CODE
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD, STATE OF COLORADO:
WHEREAS, the Board of County Commissioners of the County of Weld, State of Colorado,
pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the
authority of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld
County Code Ordinance 2000-1, enacting a comprehensive Code for the County of Weld,
including the codification of all previously adopted ordinances of a general and permanent
nature enacted on or before said date of adoption, and
WHEREAS, the Weld County Code is in need of revision and clarification with regard to
procedures, terms, and requirements therein.
NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the County
of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and
hereby are, repealed and re-enacted, with amendments, and the various Chapters are revised
to read as follows.
CHAPTER 23
ZONING
Amend Sec. 23-3-310. I -I (Industrial) Zone District.
A - No change.
B. Uses Allowed by Right. No BUILDING, STRUCTURE or land shall be used in the I-1
Zone District, and no BUILDING or STRUCTURE shall hereafter be erected, structurally altered,
enlarged or maintained, except for one (1) or more of the following USES. The USES must be
conducted in compliance with the Performance Standards contained in Sections 23-3-340, 23-3-
350 and 23-3-360 below.
1. Any USE of a research, repairing, manufacturing, fabricating, processing,
assembling or storage nature may be conducted in the I-1 Zone District so long as such
USE is SCREENED from public rights -of -way and ADJACENT properties.
2. Areas for parking passenger vehicles, so long as such parking areas are
SCREENED from the public rights -of -way.
3 thru 13 - No change.
14. CHURCH.
C through D - No change.
E. USE or type of occupancy, DEVELOPED, erected, constructed, reconstructed, moved or
,.,(O 3- 0599
structurally altered or operated in the I-1 Zone District until a Site Plan Review has been
approved by the Department of Planning Services. It shall be necessary that the applicant in the
I-1 Zone District certify and state that the performance standards and district requirements that
are applicable to the DEVELOPMENT and USES of property zoned I-1 have been or shall be
complied with according to the intent of Article II, Division 3 of this Chapter. This shall be
accomplished through the Site Plan Review application process. Uses listed in Subsection D
above as Uses by Special Review in the I-1 Zone District shall be exempt from the Site Plan
Review process and shall make application for approval of a permit in accordance with the
requirements and procedures set forth in Article II, Division 4 of this Chapter. The following is
exempted from a Site Plan Review.
1. OIL AND GAS PRODUCTION FACILITIES.
F - No Change.
G. USES similar to the USES listed above, so long as the USE complies with the general
intent of the I-1 (Industrial) Zone District.
Amend Sec. 23-3-320. 1-2 (Industrial) Zone District.
A through D - No change
E. Site Plan Review Required. No land, BUILDING or STRUCTURE shall be USED,
changed in USE or type of occupancy, DEVELOPED, erected, constructed, reconstructed,
moved or structurally altered or operated in the 1-2 Zone District until a Site Plan Review has
been approved by the Department of Planning Services. It shall be necessary that the applicant
in the 1-2 Zone District certify and state that the performance standards and district requirements
that are applicable to the DEVELOPMENT and USES of property zoned 1-2 have been or shall
be complied with according to the intent of Article II, Division 3 of this Chapter. This shall be
accomplished through the Site Plan Review application process. Uses listed in Subsection D
above as Uses by Special Review in the 1-2 Zone District shall be exempt from the Site Plan
Review process and shall make application for approval of a permit in accordance with the
requirements and procedures set forth in Article II, Division 4 of this Chapter. The following is
exempted from a Site Plan Review.
1. OIL AND GAS PRODUCTION FACILITIES.
F - No change.
G. USES similar to the USES listed above, so long as the USE complies with the general
intent of the 1-2 (Industrial) Zone District.
Amend Sec. 23-3-330. 1-3 (Industrial) Zone District.
A through D - No change.
E. USE or type of occupancy, DEVELOPED, erected, constructed, reconstructed, moved or
structurally altered or operated in the 1-3 Zone District until a Site Plan Review has been
approved by the Department of Planning Services. It shall be necessary that the applicant in the
1-3 Zone District certify and state that the performance standards and district requirements that
are applicable to the DEVELOPMENT and USES of property zoned 1-3 have been or shall be
complied with according to the intent of Article II, Division 3 of this Chapter. This shall be
accomplished through the Site Plan Review application process. Uses listed in Subsection D
above as Uses by Special Review in the 1-3 Zone District shall be exempt from the Site Plan
Review process and shall make application for approval of a permit in accordance with the
requirements and procedures set forth in Article II, Division 4 of this Chapter. The following is
exempted from a Site Plan Review.
OIL AND GAS PRODUCTION FACILITIES.
F - No change.
G. USES similar to the USES listed above, so long as the USE complies with the general
intent of the 1-3 (Industrial) Zone District.
CHAPTER 24
SUBDIVISIONS
Sec. 24-8-20. Recorded exemption.
A through C - No change.
D. In the Commercial and Industrial Zone Districts, the owner may apply for a one-time two
(2) lot Recorded Exemption. No future land exemptions will be allowed.
Amend Sec. 24-840. Exemption standards.
An exemption application shall comply with all of the following standards:
A through K - No change.
L. The minimum size of any lot proposed with a public water supply is not less than one (1)
acre net. The minimum size of any lot proposed with a well as the water supply is not less than
two and one-half (2%) acres net. Minimum lot sizes do not apply in zone districts which allow
smaller lots or where exempted by the Board of County Commissioners. The minimum lot size
does not apply to subdivision exemption lots created for the temporary use of a parcel for public
utility facilities or TELECOMMUNICATION ANTENNA TOWER facilities.
Remainder of Section - No change.
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is,
directed to arrange for Colorado Code Publishing to supplement the Weld County Code with the
amendments contained herein, to coincide with chapters, articles, divisions, sections, and
subsections as they currently exist within said Code; and to resolve any inconsistencies
regarding capitalization, grammar, and numbering or placement of chapters, articles, divisions,
sections, and subsections in said Code.
BE IT FURTHER ORDAINED by the Board if any section, subsection, paragraph, sentence,
clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional,
such decision shall not affect the validity of the remaining portions hereof. The Board of County
Commissioners hereby declares that it would have enacted this Ordinance in each and every
section, subsection, paragraph, sentence, clause, and phrase thereof irrespective of the fact
that any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might
be declared to be unconstitutional or invalid.
NOTICE
PURSUANT to the Weld County Home Rule Charter, Ordinance Number 2013-1 published
above, was introduced and, on motion duly made and seconded, approved upon first reading on
February 25, 2013. A public hearing and second reading is scheduled to be held in the
Chambers of the Board, located within the Weld County Administration Building, 1150 O Street,
Greeley, Colorado 80631, on March 18, 2013. All persons in any manner interested in the
reading of said Ordinance are requested to attend and may be heard. Please contact the Clerk
to the Board's office at phone (970) 336-7215, Extension 4225, or fax (970) 352-0242, prior to
the day of the hearing if, as the result of a disability, you require reasonable accommodations in
order to participate in this hearing. Any backup material, exhibits or information previously
submitted to the Board of County Commissioners concerning this matter may be examined in
the office of the Clerk to the Board of County Commissioners, located within the Weld County
Administration Building, 1150 O Street, Greeley, Colorado, between the hours of 8:00 a.m. and
5:00 p.m., Monday thru Friday, or may be accessed through the Weld County Web Page
(www.co.weld.co.us). E -Mail messages sent to an individual Commissioner may not be
included in the case file. To ensure inclusion of your E -Mail correspondence into the case
file, please send a copy to egesick@co.weld.co.us.
SECOND READING: March 18, 2013, at 9:00 a.m.
THIRD READING: April 8, 2013, at 9:00 a.m.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
DATED: March 1, 2013
PUBLISHED: March 6, 2013, in the Greeley Tribune
Affidavit of Publication
STATE OF COLORADO
County of Weld,
I Jennifer Usher
ss.
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the notice was published in
the regular and entire issue of every number of said
newspaper during the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Sixth day of March A.D. 2013
and the last publication thereof: in the issue of said
newspaper bearing the date of the
Sixth day of March A.D. 2013
that said The Greeley Tribune has been published
continuously and uninterruptedly during the period
of at least six months next prior to the first issue
thereof contained said notice or advertisement
above referred to; that said newspaper has been
admitted to the United States mails as second-class
matter under the provisions of the Act of March
3,1879, or any amendments thereof; and that said
newspaper is a daily newspaper duly qualified for
publishing legal notices and advertisements within
the meaning of the laws of the State of Colorado.
March 6, 2013
Total Charges: $57.76
i
K. lL•aiG 6i
A V
6thr day of March, 2013
My Commission Expires 6/14/2013caxwsQ;�Bt T•���,„
NOTg9•
O"
Notary Pub -IIII vp.
WELD COUNTY
CODE ORDINANCE 2013-1
IN THE ZONING, AND CHAPTER R OF REPEALING
SUBDIVISIONS, OFD T THE WELD WITH ACOUNTY CODE
23
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD, STATE OF COLORADOthe Board of :
rsu-
WHEREAS,
nt to Colorado statute and the Weld County Home Rule Charter,y Commissioners of the isJvvestedawite h the authority of
administering the affairs of Weld County, Colorado. and
WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld County
Code Ordinance 2000-1, enacting a comprehensive Code for the County of Weldincluding the
codification of all previously adopted ordinances of a general and permanent nature enacted on or
before said date of adoption, and
WHEREAS, the Weld County Code is in need of revision and clarification with regard to proce-
dures,terms, and requirements therein.
NOW, THEREFORE. BE IT ORDAINED by the Board of County Commissioners of the County of
Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and hereby
are, repealed and reenacted, with amendments, and the various Chapters are revised to read as
follows.
CHAPTER 23
ZONING
Amend Sec. 23-3-310.1-1 (Industrial) Zone District.
A - No change.
B.Uses Allowed by Right. No BUILDING, STRUCTURE or land shall be used in the I-1 Zone Dis-
trict, and no BUILDING or STRUCTURE shall hereafter be erected, structurally altered, enlarged or
maintained, except for one (1) or more of the following USES. The USES must be conducted
n uct dl
n
compliance with the Performance Standards contained in Sections 23-3-340,
23-3.360 below.
1.Any USE of a research. repairing. manufacturing. fabricating. processing, assembling or storage
nature may be conducted in the 1-1 Zone District so long as such USE is SCREENED from public
rights -of -way and ADJACENT properties.
2.Areas for parking passenger vehicles. so long as such parking areas are SCREENED from the
public rights -of -way.
3 Eau 13 - No change.
14.CHURCH.
C through D - No change.
E.USE or type of occupancy, DEVELOPED, erected, constructed, reconstructed, moved or struc-
turally altered or operated in the I-1 Zone District until a Site Plan Review has been approved by
the Department of Planning Services. It shall be necessary that the applicant in the I-1 Zone Dis-
trict certify and state that the performance standards and district requirements that are applicable to
the DEVELOPMENT and USES of property zoned 1-1 have been or shall be complied with accord-
ing to the intent of Article 11, Division 3 of this Chapter. This shall be accomplished through the Site
Plan Review application process. Uses listed in Subsection D above as Uses by Special Review in
the 1-1 Zone District shall be exempt from the Site Plan Review process and shall make application
for approval of a permit in accordance with the requirements and procedures set forth in Article II,
Division 4 of this Chapter. The following is exempted from a Site Plan Review.
1.OIL AND GAS PRODUCTION FACILITIES.
F - No Change.
G.USES similar to the USES listed above, so long as the USE complies with the general intent of
the 1-1 (Industrial) Zone District.
Amend Sec. 23-3.320. e2 (Industrial) Zone District.
A through D - No change.
E.She Plan Review Required. No land BUILDING or STRUCTURE shall be USED, changed in
USE or type of occupancy, DEVELOPED. erected, constructed, reconstructed moved or structur-
ally atered or operated In the 1-2 Zone District until a Site Plan Review has been approved by the
Department of Planning Services. It shall be necessary that the applicant in the I-2 Zone District
certify and state that the performance standards and district requirements that are applicable to the
DEVELOPMENT and USES of properly zoned 1.2 have been or shall be complied with according to
the intentap�process.Uses listed in Subsection D above opprocess.f Article A lsion 3 of this apter. This lasUses l be by Special plished pe
h the Site Plan
Review Review in the
I-2 Zone District shall be exempt from the Site Plan Review process and shall make application for
approval of e permit in accordance with the requirements and procedures set forth in Article II, Divi-
sion 4 of this Chapter. The following is exempted from a Site Plan Review.
1.OIL AND GAS PRODUCTION FACILITIES.
•
F - No change.
G.USES similar to the USES listed above. so long as the USE complies with the general intent of
the 1-2 (Industrial) Zone District.
Amend Sec. 23-3-330.1-3 (Industrial) Zone District.
A through D - No change.
E.USE or type of occupancy, DEVELOPED, erected. constructed, reconstructed moved or
stnicturally altered or operated In the 1-3 Zone District until a Site Plan Review has been approved
by the Department of Planning Services. It shall be necessary that the applicant In the 1.3 Zone
District certify and state that the performance standards and district requirements that are
applicable to the DEVELOPMENT and USES of propertYzoned I-3 have been or shall be complied
with according to the Intent of Article II, Division 3 of this Chapter. This that be accomplished
through the Site Plan Review application process. Uses listed In Subsection D above as Uses by
Specal Review ein the 1-3 Zone dsMd shall be exempt from the Site Plan Review process and
s
shall
ffoal, make Artldes Di for approval
d tlNs Chaap�. T accordance
following wi g 4tha�ptrequirements
d ffro n a Site and
Review.
1.OIL AND GAS PRODUCTION FACILITIES.
F - No change.
G.USES Smiler to the USES listed above, so long as the USE complies with the general intent of
the I -S (Industrial) Zone District.
CHAPTER 24
SUBDIVISIONS
Sec. 24-8-20. Recorded exemption.
A through C - No change.
D.In the Commercial and Industrial Zone Districts, the owner may apply for a one-time two (2) lot
Recorded Exemption. No future land exemptions will be allowed.
Amend Sec. 24-8-40. Exemption standards.
An exemption application shall comply with al of the following standards:
A through K - No change.
L.The minimum size o any lot proposed with a public water supply Is not less than one (1) acre net.
The minimum size of any lot proposed with a well as the water supply is not less than two and
one-half (25) acres net. Minimum lot sizes do not apply in zone districts which allow smaller lots or
where exempted by the Board of County Commissioners. The minimum lot size does not apply to
subdivision exemption lots created for the temporary use of a parcel for public dilly facilities or
TELECOMMUNICATION ANTENNA TOWER facilities.
Remainder of Section - No Change.
•
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is, directed
to arrange for Colorado Code Publishing to supplement the Weld County Code with the
amendments contained herein. to coindde with chapters, articles, divisions. sections, and
subsections as they current, exist within said Code; and to resolve any inconsistencies regarding
Capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections. and
subsections in said Code.
BE IT FURTHER ORDAINED by the Board If any section, subsection, paragraph, sentence, clause.
or phrase of this Ordinance Is for any reason held or decided to be unconstitutional, such decision
shall not affect the validity of the remaining portions hereof. The Board of County Commissioners
hereby declares that it would have enacted this Ordinance in each and every section, subsection,
paragraph, sentence, clause. and phrase thereof irrespective of the fact that any one or more
sections, subsections, paragraphs, sentences, clauses. or phrases might be declared to be
unwnstltutidnal or invalid
NOTICE
PURSUANT to the Weld County Home Rule Charter, Ordinance Number 2013-1 published above,
was introduced and, on motion duly made and seconded, approved upon first reading on February
25, 2013. A public hearing and second reading is scheduled to be held In the Chambers of the
Board, located within the Weld County Administration Building, 1150 O Street, Greeley, Colorado
80631, on March 18, 2013. All persons in any manner interested in the reading of said Ordinance
are requested to attend and may be heard. Please contact the Clerk to the Board's office at phone
(970) 336-7215, Extension 4225, or tax (970) 352-0242, prior to the day of the hearing if, as the
result of a disability, you require reasonable accommodations in order to participate in this hearing.
Any backup material, exhibits or information previously submitted to the Board of County Commis-
sioners concerning this matter may be examined in the office of the Clerk to the Board of County
Commissioners, located within the Weld County Administration Building, 1150 O Street, Greeley,
Colorado, between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday, or may be accessed
through the Weld County Web Page (www.co.weld.co.us). E -Mail messages sent to an individual
Commissioner may not be included In the case file. To ensure inclusion of your E -Mail
correspondence into the case file, please send a copy to egesick®co.weld.co.us.
SECOND READING: March 18, 2013, at 9:00 a.m.
THIRD READING: April 8. 2013, at 9:00 am.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY. COLORADO
DATED: March 1, 2013
The Tribune
March 6, 2013
NOTICE
Pursuant to the zoning laws of the State of Colorado and the Weld County Code, a public hearing will be
held before the Weld County Planning Commission and the Board of County Commissioners in the Hearing Room,
Weld County Administration Building, 1150 O Street, Greeley, Colorado, at the times specified below. A Second
and Third reading of said Ordinance will be considered on March 18, 2013, and April 8, 2013.
The complete case file may be examined by calling the Department of Planning Services at (970)
353-6100 to make arrangements with the case planner, or at the office of the Clerk to the Board of
County Commissioners, Weld County Administration Building, 1150 O Street, Greeley, Colorado 80631.
E -Mail messages sent to an individual Commissioner may not be included in the case file. To ensure
inclusion of your E -Mail correspondence into the case file prior to the Planning Commission hearing,
please call the Department of Planning Services to obtain the appropriate contact information. For
inclusion of any correspondence prior to the Board of Commissioners hearing E-mail
egesick@co.weld.co.us.
If a court reporter is desired for either hearing, please advise the Department of Planning
Services or the Clerk to the Board's Office, in writing, at least five days prior to the hearing. The cost of
engaging a court reporter shall be borne by the requesting party. In accordance with the Americans with
Disabilities Act, if special accommodations are required in order for you to participate in this hearing,
please contact the Department of Planning Services at (970) 353-6100 Ext. 3519, or the Clerk to the
Board's Office at (970) 336-7215, Ext. 4226, prior to the day of the hearing. All cases scheduled before
the Planning Commission or Board of County Commissioners are subject to continuance, due to lack of
quorum or otherwise. Contact the Department of Planning Services or the Clerk to the Board's Office at
the numbers above, for hearing continuance information.
DOCKET #: 2013-13
PLANNING COMMISSION DATE: February 5, 2013
TIME: 1:30 p.m.
BOARD OF COMMISSIONERS DATE: February 25, 2013
TIME: 9:00 a.m.
PRESENTED BY: Tom Parko
REQUEST: Weld County Code Ordinance #2013-1, In the Matter of Repealing and Re -Enacting, with
Amendments, Chapter 23 Zoning and Chapter 24 Subdivisions, of the Weld County Code.
PLANNING COMMISSION
WELD COUNTY, COLORADO
DATED: January 18, 2013
PUBLISHED: January 23, 2013, in the Greeley Tribune
2013-0548
Affidavit of Publication
NOTICE
Pursuant to the zoning laws of the State of Colorado and the Q
Weld County Code, a public hearing will be held before the Welt.
County Planning Commission and the Board of County Commis-
sioners in the Hearing Room. Weld County Administration
Bulldog. 1150 O Street. Greeley. Colorado. at the times speci-
fied below. A Second and Third reading of said Ordinance will
be considered on March 18, 2013. and April 8, 2013.
The complete case file may bo examined by calling the Depart-
ment of Planning Services at (970) 353.8100 to make arrange-
ments with the case planner, or at Inc office of the Clerk to the
Board of County Commissioners, Weld County Administration
Bultdmg. 1150 0 Street, Greeley, Colorado 80631 E -Mail mes-
sages sent to an individual Commissioner may not be included in
the case file To ensure inclusion of your E -Mail correspondence
Into the case bite prior to the Planning Commission hearing,
please call the Department of Planning Services to obtain the
appropriate contact information. For inclusion of any correspon-
dence prior to the Board of Commissioners hearing E-mail oge-
sickeco.weld.co Ins
If a court reporter is desired for either hearing, please advise the
Department of Planning Services or the Clerk 10 the Boards Of-
fice, in writing, at least five days prior to the hearing. The cost of
engaging a court reporter shall be borne by the request+'ng party
In accordance with the Americans with Disabilities Act, if special
accommodations are required in order for you to participate in
this fearing, please contact the Department of Planning Servic-
es at (970) 353 6100 Ext 3519. or the Clerk to the Board's Of-
fice 81(970) 338.7215. Ext. .1226, prior to the day of the hearing.
All cases scheduled before the Planning Commission or Board of
County Commissioners are subject to continuance. due to tack of
quorum or otherwise Contact the Department of Planning Ser-
vices or the Clerk to the Beard's Office at the numbers above. for
hearing continuance information
DOCKET a: 2013.13
PLANNING COMMISSION DATE: February 5, 2013
TIME: 1:30 p
BOARD OF COMMISSIONERS DATE: February 25, 2013
TIME: 9.00 a in.
PRESENTED BY: Torn Parke
REQUEST Weld County Code Ordinance +12013.1, In the Mat-
ter of Repealing end Re -Enacting. with Amendments, Chapter 23
Zoning and Chapter 24 SutxtivIsions, of the Weld County Code
PLANNING COMMISSION
WELD COUNTY, COLORADO
DATED: January 18. 2013
The Tribune
January 23, 2013
STATE OF COLORADO
County of Weld,
I Jennifer Usher
ss.
of said County of Weld, being duly sworn, say
that I am an advertising clerk of
THE GREELEY TRIBUNE,
that the same is a daily newspaper of general
circulation and printed and published in the City of
Greeley, in said county and state; that the notice or
advertisement, of which the annexed is a true copy,
has been published in said daily newspaper for
consecutive (days): that the notice was published in
the regular and entire issue of every number of said
newspaper during the period and time of
publication of said notice, and in the newspaper
proper and not in a supplement thereof; that the
first publication of said notice was contained in the
Twenty-third day of January A.D.
2013 and the last publication thereof: in the issue of
said newspaper bearing the date of the
Twenty-third day of January A.D.
2013 that said The Greeley Tribune has been
published continuously and uninterruptedly during
the period of at least six months next prior to the
first issue thereof contained said notice or
advertisement above referred to; that said
newspaper has been admitted to the United States
mails as second-class matter under the provisions
of the Act of March 3,1879, or any amendments
thereof; and that said newspaper is a daily
newspaper duly qualified for publishing legal
notices and advertisements within the meaning of
the laws of the State of Colorado.
January 23, 2013
Total Charges: $10.53
day of January, 2013
23rd
My Commission Expires 6/14/2013
L4ad
Notary Public
Hello